Laserfiche WebLink
Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />83 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SO YD <br />($6.00) <br />50 <br />50 <br />50 <br />($300.00) <br />84 <br />2501.511 <br />18" RC PIPE CULVERT CLASS III <br />LIN FT <br />($57.00) <br />6 <br />6 <br />6 <br />($342.00) <br />85 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />(55.00) <br />20 <br />20 <br />20 <br />($100.00) <br />86 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />(54,000.00) <br />0.1 <br />0.1 <br />0.1 <br />(5400.00) <br />87 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />($11.00) <br />50 <br />50 <br />50 <br />($550.00) <br />Totals For Change Order 1: <br />$9,549.00 <br />Project Totals: <br />$84,817.00 <br />