My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-22-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
09-22-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:54:01 PM
Creation date
9/25/2014 2:12:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/22/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF ORIGINATOR: <br />MEETING DATE: <br />TOPIC: <br />VOTE REQUIRED: <br />INTRODUCTION <br />CITY COUNCIL <br />AGENDA ITEM 6Bii <br />Michael Grochala, Community Development Director <br />September 22, 2014 <br />Consider Resolution No. 14-109, Amending Resolution No. 14-52, <br />Authorizing Preparation of Plans & Specifications, Well No. 6 <br />Pumping Facility <br />3/5 Vote Required <br />Staff is requesting Council approval to authorize Stantek Inc., to prepare plans and specifications <br />for the construction of the Well No. 6 Pumping Facility <br />BACKGROUND <br />The City is currently preparing to construct (drill) Well No. 6. The design and construction of the <br />well project is being managed by Stantek Inc. Upon completion of the well drilling a pumping <br />facility will need to be constructed. The City Council previously took action in June of 2014 to <br />authorize WSB and Associates to prepare the plans and specifications for the pumping facility. <br />However, staff has determined that it would be more cost effective to have Stantek Inc., complete <br />the pumping facility design. Stantek has provided the City with a proposal to provide the <br />following services: <br />Prepare preliminary and final design of well house <br />Development contract documents for bidding <br />Distribute, review, tabulate and recommend award of construction contract <br />Construction administration and inspection <br />Stantek is proposing to complete these services for $67,000, which is approximately $39,000 less <br />than the amount we were able to negotiate with WSB and Associates. WSB, as City Engineer, <br />will continue to provide oversight and administrative assistance with the project. <br />RECOMMENDATION <br />Staff recommends adoption of Resolution 14-109 Authorizing Preparation of Plans and <br />Specifications for the construction of Well No. 6 Pumping Facility. <br />ATTACHMENTS <br />1. Resolution No. 14-109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.