Laserfiche WebLink
• <br />• <br />• <br />Project: 02029 -19 - LINO - Otter Lake Road Extension <br />Engineers Estimate <br />Northwest Asphalt, Inc. <br />Midwest Civil Constructors, LLC <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />SCHEDULE A - SURFACE IMPROVEMENTS <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$19,300.00 <br />$19,300.00 <br />$14,435.00 <br />$14,435.00 <br />$20,000.00 <br />$20,000.00 <br />2 <br />2101.502 <br />CLEARING <br />TREE <br />25 <br />$150.00 <br />$3,750.00 <br />$73.50 <br />$1,837.50 <br />$10.00 <br />$250.00 <br />3 <br />2101.507 <br />GRUBBING <br />TREE <br />25 <br />$200.00 <br />$5,000.00 <br />$73.50 <br />$1,837.50 <br />$10.00 <br />$250.00 <br />4 <br />2102.501 <br />PAVEMENT MARKING REMOVAL <br />SQ FT <br />560 <br />$3.00 <br />$1,680.00 <br />$1.50 <br />$840.00 <br />$1.50 <br />$840.00 <br />5 <br />2102.502 <br />PAVEMENT MARKING REMOVAL <br />UN FT <br />750 <br />$2.00 <br />$1,500.00 <br />$0.75 <br />$562.50 <br />$0.75 <br />$562.50 <br />6 <br />2104.501 <br />REMOVE CURB AND GUTTER <br />UN FT <br />50 <br />$4.00 <br />$200.00 <br />$4.00 <br />$200.00 <br />$2.00 <br />$100.00 <br />7 <br />2104.503 <br />REMOVE CONCRETE WALK <br />SQ FT <br />200 <br />$1.00 <br />$200.00 <br />$1.00 <br />$200.00 <br />$0.75 <br />$150.00 <br />8 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />160 <br />$2.00 <br />$320.00 <br />$2.50 <br />$400.00 <br />$2.00 <br />$320.00 <br />9 <br />2104.509 <br />REMOVE SIGN <br />EACH <br />1 <br />$50.00 <br />$50.00 <br />$15.00 <br />$15.00 <br />$15.00 <br />$15.00 <br />10 <br />2104.511 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />LIN FT <br />10 <br />$5.00 <br />$50.00 <br />$4.00 <br />$40.00 <br />$10.00 <br />$100.00 <br />11 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />155 <br />$3.00 <br />$465.00 <br />$3.00 <br />$465.00 <br />$3.00 <br />$465.00 <br />12 <br />2104.523 <br />SALVAGE TEMPORARY BARRICADES <br />EACH <br />11 <br />$200.00 <br />$2,200.00 <br />$40.00 <br />$440.00 <br />$40.00 <br />$440.00 <br />13 <br />2104.523 <br />SALVAGE SIGN <br />EACH <br />2 <br />$75.00 <br />$150.00 <br />$15.00 <br />$30.00 <br />$15.00 <br />$30.00 <br />14 <br />2105.507 <br />SUBGRADE EXCAVATION (EV) <br />CU YD <br />250 <br />$13.00 <br />$3,250.00 <br />$12.70 <br />$3,175.00 <br />$8.50 <br />$2,125.00 <br />15 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) <br />CU YD <br />1720 <br />$15.00 <br />$25,800.00 <br />$17.70 <br />$30,444.00 <br />$16.50 <br />$28,380.00 <br />16 <br />2105.525 <br />TOPSOIL BORROW (CV) <br />CU YD <br />100 <br />$10.00 <br />$1,000.00 <br />$30.00 <br />$3,000.00 <br />$10.00 <br />$1,000.00 <br />17 <br />2106.607 <br />EXCAVATION - COMMON (P) <br />CU YD <br />3225 <br />$10.00 <br />$32,250.00 <br />$12.70 <br />$40,957.50 <br />$11.70 <br />$37,732.50 <br />18 <br />2112.501 <br />SUBGRADE PREPARATION <br />ROAD STA <br />3.7 <br />$210.00 <br />$777.00 <br />$445.00 <br />$1,646.50 <br />$150.00 <br />$555.00 <br />19 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />5 <br />$100.00 <br />$500.00 <br />$125.00 <br />$625.00 <br />$125.00 <br />$625.00 <br />20 <br />2130.501 <br />WATER <br />M GALLONS <br />10 <br />$30.00 <br />$300.00 <br />$50.00 <br />$500.00 <br />$40.00 <br />$400.00 <br />21 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />2020 <br />$12.00 <br />$24,240.00 <br />$13.12 <br />$26,502.40 <br />$13.00 <br />$26,260.00 <br />22 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />140 <br />$5.00 <br />$700.00 <br />$3.00 <br />$420.00 <br />$3.05 <br />$427.00 <br />23 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) <br />TON <br />820 <br />$65.00 <br />$53,300.00 <br />$71.75 <br />$58,835.00 <br />$69.00 <br />$56,580.00 <br />24 <br />2521.501 <br />6" CONCRETE WALK <br />SQ FT <br />450 <br />$6.00 <br />$2,700.00 <br />$7.20 <br />$3,240.00 <br />$6.50 <br />$2,925.00 <br />25 <br />2521.511 <br />2.5" BITUMINOUS WALK <br />SQ FT <br />2200 <br />$2.25 <br />$4,950.00 <br />$2.62 <br />$5,764.00 <br />$1.70 <br />$3,740.00 <br />26 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />360 <br />$15.00 <br />$5,400.00 <br />$17.91 <br />$6,447.60 <br />$13.75 <br />$4,950.00 <br />27 <br />2531.602 <br />PEDESTRIAN CURB RAMP <br />EACH <br />2 <br />$300.00 <br />$600.00 <br />$224.01 <br />$448.02 <br />$400.00 <br />$800.00 <br />28 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />100 <br />$40.00 <br />$4,000.00 <br />$39.00 <br />$3,900.00 <br />$37.00 <br />$3,700.00 <br />29 <br />2535.501 <br />BITUMINOUS CURB <br />LIN FT <br />365 <br />$9.00 <br />$3,285.00 <br />$7.00 <br />$2,555.00 <br />$5.70 <br />$2,080.50 <br />30 <br />2545.523 <br />4" NON - METALLIC CONDUIT <br />LIN FT <br />400 <br />$5.00 <br />$2,000.00 <br />$5.00 <br />$2,000.00 <br />$5.00 <br />$2,000.00 <br />31 <br />2554.602 <br />TEMPORARY BARRICADES <br />EACH <br />9 <br />$500.00 <br />$4,500.00 <br />$100.00 <br />$900.00 <br />$100.00 <br />$900.00 <br />32 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$5,000.00 <br />$5,000.00 <br />$1,400.00 <br />$1,400.00 <br />$3,000.00 <br />$3,000.00 <br />33 <br />2564.531 <br />SIGN PANELS TYPE C <br />SQ FT <br />27 <br />$35.00 <br />$945.00 <br />$31.00 <br />$837.00 <br />$31.00 <br />$837.00 <br />34 <br />2565.616 <br />REVISE SIGNAL SYSTEM <br />SYSTEM <br />1 <br />$40,000.00 <br />$40,000.00 <br />$32,500.00 <br />$32,500.00 <br />$31,500.00 <br />$31,500.00 <br />