Laserfiche WebLink
• <br />• <br />• <br />Project: 02029 -19 - LINO - Otter Lake Road Extension <br />Engineers Estimate <br />Arnt Construction <br />Company <br />Burschville Construction, <br />Inc. <br />Omann Brothers, Inc. <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: <br />$27,525.00 <br />$38,456.00 <br />$36,525.50 <br />$35,060.85 <br />SCHEDULE C - WATER MAIN IMPROVEMENTS <br />58 <br />2451.609 <br />GRANULAR FOUNDATION AND /OR BEDDING <br />TON <br />50 <br />$10.00 <br />$500.00 <br />$8.00 <br />$400.00 <br />$10.00 <br />$500.00 <br />$8.18 <br />$409.00 <br />59 <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />1 <br />$1,000.00 <br />$1,000.00 <br />$2,800.00 <br />$2,800.00 <br />$1,000.00 <br />$1,000.00 <br />$1,890.70 <br />$1,890.70 <br />60 <br />2504.602 <br />HYDRANT <br />EACH <br />1 <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />$3,450.00 <br />$3,450.00 <br />$3,066.00 <br />$3,066.00 <br />61 <br />2504.602 <br />16" BUTTERFLY VALVE AND BOX <br />EACH <br />2 <br />$8,500.00 <br />$17,000.00 <br />$3,050.00 <br />$6,100.00 <br />$5,100.00 <br />$10,200.00 <br />$3,117.10 <br />$6,234.20 <br />62 <br />2504.602 <br />6" GATE VALVE AND BOX <br />EACH <br />1 <br />$1,200.00 <br />$1,200.00 <br />$1,300.00 <br />$1,300.00 <br />$1,175.00 <br />$1,175.00 <br />$1,328.60 <br />$1,328.60 <br />63 <br />2504.602 <br />8" GATE VALVE AND BOX <br />EACH <br />2 <br />$2,000.00 <br />$4,000.00 <br />$1,700.00 <br />$3,400.00 <br />$1,750.00 <br />$3,500.00 <br />$1,737.40 <br />$3,474.80 <br />64 <br />2504.603 <br />HYDRANT EXTENSION <br />LIN FT <br />1 <br />$500.00 <br />$500.00 <br />$530.00 <br />$530,00 <br />$550.00 <br />$550.00 <br />$541.66 <br />$541.66 <br />65 <br />2504.603 <br />VALVE BOX EXTENSION <br />LIN FT <br />1 <br />$100.00 <br />$100.00 <br />$100.00 <br />$100.00 <br />$150.00 <br />$150.00 <br />$86.87 <br />$86.87 <br />66 <br />2504.603 <br />16" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />370 <br />$75.00 <br />$27,750.00 <br />$70.00 <br />$25,900.00 <br />$65.13 <br />$24,098.10 <br />$70.52 <br />$26,092.40 <br />67 <br />2504.603 <br />6" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />5 <br />$35.00 <br />$175.00 <br />$34.00 <br />$170.00 <br />$65.00 <br />$325.00 <br />$33.73 <br />$168.65 <br />68 <br />2504.603 <br />8" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />120 <br />$40.00 <br />$4,800.00 <br />$37.00 <br />$4,440.00 <br />$38.00 <br />$4,560.00 <br />$36.79 <br />$4,414.80 <br />69 <br />2504.604 <br />4" POLYSTYRENE INSULATION <br />SQ YD <br />25 <br />$45.00 <br />$1,125.00 <br />$20.00 <br />$500.00 <br />$35.00 <br />$875.00 <br />$18.40 <br />$460.00 <br />70 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />POUND <br />1500 <br />$4.00 <br />$6,000.00 <br />$4.50 <br />$6,750.00 <br />$3.50 <br />$5,250.00 <br />$4.60 <br />$6,900.00 <br />Total SCHEDULE C - WATER MAIN IMPROVEMENTS: <br />$67,150.00 <br />$55,390.00 <br />$55,633.10 <br />$55,067.68 <br />SCHEDULE D - STORM SEWER IMPROVEMENTS <br />71 <br />2105.511 <br />COMMON CHANNEL EXCAVATION <br />CU YD <br />25 <br />$15.00 <br />$375.00 <br />$5.90 <br />$147.50 <br />$6.90 <br />$172.50 <br />$10.22 <br />$255.50 <br />72 <br />2105.607 <br />POND EXCAVATION <br />CU YD <br />850 <br />$10.00 <br />$8,500.00 <br />$5.90 <br />$5,015.00 <br />$6.90 <br />$5,865.00 <br />$9.10 <br />$7,735.00 <br />73 <br />2501.515 <br />18" RC PIPE APRON <br />EACH <br />1 <br />$550.00 <br />$550.00 <br />$1,160.00 <br />$1,160.00 <br />$475.00 <br />$475.00 <br />$1,185.52 <br />$1,185.52 <br />74 <br />2501.602 <br />SKIMMER <br />EACH <br />1 <br />$4,000.00 <br />$4,000.00 <br />$3,550.00 <br />$3,550.00 <br />$2,500.00 <br />$2,500.00 <br />$3,628.10 <br />$3,628.10 <br />75 <br />2501.602 <br />TRASH GUARD FOR 18" PIPE APRON <br />EACH <br />1 <br />$300.00 <br />$300.00 <br />$250.00 <br />$250.00 <br />$280.00 <br />$280.00 <br />$255.50 <br />$255.50 <br />76 <br />2502.541 <br />4" PERF PE PIPE DRAIN <br />LIN FT <br />100 <br />$15.00 <br />$1,500.00 <br />$1.00 <br />$100.00 <br />$9.00 <br />$900.00 <br />$5.11 <br />$511.00 <br />77 <br />2503.541 <br />15" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />360 <br />$30.00 <br />$10,800.00 <br />$25.50 <br />$9,180.00 <br />$28.50 <br />$10,260.00 <br />$26.06 <br />$9,381.60 <br />78 <br />2503.541 <br />18" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />40 <br />$32.00 <br />$1,280.00 <br />$28.00 <br />$1,120.00 <br />$31.00 <br />$1,240.00 <br />$28.62 <br />$1,144.80 <br />79 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 <br />LIN FT <br />8.5 <br />$250.00 <br />$2,125.00 <br />$250.00 <br />$2,125.00 <br />$340.00 <br />$2,890.00 <br />$255.50 <br />$2,171.75 <br />80 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 <br />EACH <br />3 <br />$1,300.00 <br />$3,900.00 <br />$1,480.00 <br />$4,440.00 <br />$1,300.00 <br />$3,900.00 <br />$1,512.56 <br />$4,537.68 <br />81 <br />2506.516 <br />CASTING ASSEMBLY (CATCH BASIN) <br />EACH <br />2 <br />$500.00 <br />$1,000.00 <br />$560.00 <br />$1,120.00 <br />$500.00 <br />$1,000.00 <br />$572.32 <br />$1,144.64 <br />82 <br />2511.501 <br />RANDOM RIPRAP CLASS III <br />CU YD <br />16 <br />$100.00 <br />$1,600.00 <br />$104.00 <br />$1,664.00 <br />$90.00 <br />$1,440.00 <br />$105.27 <br />$1,684.32 <br />83 <br />2511.515 <br />GEOTEXTILE FILTER TYPE IV <br />SQ YD <br />35 <br />$3.00 <br />$105.00 <br />$3.00 <br />$3.00 <br />$105.00 <br />$3.07 <br />$107.45 <br />Total SCHEDULE D - STORM SEWER IMPROVEMENTS: <br />$36,035.00 <br />$31,027.50 <br />$33,742.86 <br />Total SCHEDULE A - SURFACE IMPROVEMENTS: <br />$280,347.00 <br />$217,720.10 <br />$245,920.50 <br />Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: <br />$27,525.00 <br />$38,456.00 <br />$36,525.50 <br />$35,060.85 <br />Total SCHEDULE C - WATER MAIN IMPROVEMENTS: <br />$67,150.00 <br />$55,390.00 <br />$55,633.10 <br />$55,067.68 <br />