Laserfiche WebLink
Preserve at Lino Lakes <br />Development Contract <br />May, 2013 <br />Prevention Plan (SWPPP) in accordance with Minnesota Pollution <br />Control Agency (MPCA) requirements. <br />c) The Developer shall be responsible for securing all required site <br />grading and development approvals and permits from all Federal, <br />State, Regional and Local agencies with jurisdiction or as <br />applicable prior to the commencement of site grading or <br />construction. <br />2. Erosion Control Plan <br />a) The Developer shall submit an erosion control plan, detailing all <br />erosion control measures to be implemented during construction. <br />Said plan shall be approved by the City prior to the commencement <br />of site grading or construction. <br />b) The Developer shall submit a turf establishment plan which details <br />topsoil placement, seeding, sodding, mulching, fertilizing and <br />watering. Said plan shall be approved by the City prior to the <br />commencement of site grading or construction. <br />3. Grading and Erosion Control Construction & Maintenance <br />a) Prior to the commencement of site grading and erosion control, the <br />Developer shall complete items II.B.1 and II.B.2 as listed above. <br />b) The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />c) All improvements shall conform to the natural limitations presented <br />by the topography and soil of the subdivision in order to create the <br />best potential for preventing soil erosion. <br />d) Erosion and siltation control measures shall be coordinated with the <br />different stages of development. The Developer shall attain an <br />NPDES Stormwater Permit prior to engaging in any site grading <br />activities. All terms and conditions of the NPDES permit must be <br />adhered to by the Developer throughout construction the duration of <br />construction of the Subdivision from start to finish. <br />Where the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area. The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. The Developer <br />page 4 <br />• <br />