Laserfiche WebLink
• <br />Preserve at Lino Lakes <br />Development Contract <br />May, 2013 <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />f) The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. <br />g) <br />All disturbed areas shall be sodded or seeded, as designated per the <br />approved Developer Plans, immediately upon completion of grading. <br />h) The street right -of -way, storm water storage ponds, and surface <br />water drainage ways shall be graded prior to commencement of <br />utility construction. <br />i) Drainage swales, ditches, storm water storage ponds and other high <br />risk erosion areas shall be protected from erosion. <br />j) All grading must be completed prior to issuance of building permits. <br />k) All streets shall be protected from erosion deposits. This should <br />include a combination of roadside silt fences, roadside sod strips, <br />catch basin rock bale inlet protection, rock construction entrances, <br />straw mulch, and/or street sweeping. <br />1) The Developer's engineer shall certify, in writing with an as -built <br />survey, that all grading complies with the approved grading plan <br />prior to issuance of any building permits. <br />m) The Developer shall be responsible for ascertaining that site <br />geotechnical and groundwater conditions are adequate and <br />conforming with the grading and site improvement as proposed. <br />n) The Developer shall provide financial security and/or cash escrow to <br />assure completion of the grading and restoration, in the event that the <br />work is not completed by the Developer. <br />4. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course. <br />5. All homeowners association declaration, covenants, and property and legal <br />requirements as required in the Agreement shall be submitted to the City <br />Attorney for review as required by the City's final plat requirements. <br />6. Storm sewers when determined to be necessary by the City Engineer, <br />including all necessary laterals, catch basins, inlets and other appurtenances <br />shall be furnished and installed. <br />page 5 <br />