Laserfiche WebLink
SEH CHANGE ORDER <br />City of Lino Lakes, Minnesota January 4, 2007 <br />OWNER DATE <br />OWNER'S PROJECT NO. <br />Legacy at Woods Edge - Phase 3 <br />PROJECT DESCRIPTION <br />1 <br />CHANGE ORDER NO. <br />A- LINOL0305.03 <br />SEH FILE NO. <br />The following changes shall be made to the contract documents: <br />Description: <br />1. Contractor to delete sod from area shown on Sheet L9 and replace with seed mix, topsoil tilling and <br />wood fiber blanket at a cost of $5,133.60. <br />2. Install 14 gauge tracer wire on irrigation system main line at a cost of $724.50. <br />3. Contractor to install sod in the boulevard area near the trail along Town Center Parkway at a cost of <br />$858.00. <br />4. Contractor to install sleeving and irrigation to retaining wall, small median, and around city hall sign on <br />sheets 1R2 and IRS at a cost of $2,896.27. <br />5. Contractor to install 32 daylillies in Pond 2 and 231 perennials around city hall sign as shown on sheet <br />Lla at a cost of (263 x $15) $3,945.00. <br />6. Contractor to install PE tree protection wrap on aspen trees in the community green at a cost of $156.00. <br />7. Contractor to install irrigation for bid alternate 3 as shown on sheet IR3 at a cost of $1,860.00. <br />8. Contractor to install 2 autumn blaze maple trees in the boulevard of Patriot Bank at a cost of $876.00. <br />9. Contractor to subcut the boulevard area near the trail along Town Center Parkway at a cost of <br />$3,081.50. <br />10. Contractor to extend irrigation service with 1 1/2" copper and raise to finished grade for meter box <br />installation at a cost of $1,003.20. <br />10. Contractor to connect to existing 6" water main stub and install 130 LF of 3/4" copper for water <br />feature water supply with corporation stop, curb stop and box, blow out, backflow preventer, pressure <br />reducer, and hanhole. The cost of time and material for the described work is $5,785.04. <br />11. Contractor to install select granular borrow (modified 5 %) under water feature at a cost of $603.60. <br />12. Contractor to install 71 LF of 4" perforated draintile with sock at a cost of $497.00. <br />Purpose of Change Order: <br />Additions to contract based on field changes and city requests throughout the project. <br />Basis of Cost: ® Actual ❑ Estimated <br />Attachments (list supporting documents) <br />Invoices requesting change order payment from Jay Bros., Inc. <br />Revised plan sheet Lla <br />Plan sheets L9, IR2,1R3, IR5 <br />Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 <br />SEH is an equal opportunity employer I www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax <br />