My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-110 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-110 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2014 10:47:33 AM
Creation date
10/15/2014 9:11:35 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/23/2007
Council Meeting Type
Regular
Resolution #
07-110
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES, MINNESOTA <br />AUTHORIZATION FOR PROFESSIONAL SERVICES <br />TO: Toltz, King, Duvall, Anderson <br />and Associates, Incorporated <br />444 Cedar Street, Suite 1500 <br />St. Paul, Minnesota 55101 -2140 <br />Pursuant to our Agreement dated March 8, 1993, as amended on January 18, 1994, you are <br />hereby authorized to proceed with the professional services described as follows: <br />77TH STREET FEASIBILITY STUDY <br />I. PROJECT DESCRIPTION <br />The Project consists of the preparation of a Feasibility Study for reconstruction and realignment <br />of street and utilities, along with stormwater and traffic signal improvements, for 77th Street <br />from Lake Drive to approximately 800 feet west in the City of Lino Lakes. Hereinafter the City <br />of Lino Lakes is referred to as the OWNER. <br />II. SERVICES TO BE PROVIDED BY TKDA <br />TKDA is requested to provide the following services. <br />A. Investigate and analyze two alignments, including relative right -of -way impacts, for the <br />purpose of comparing the alignments and recommend a preferred alignment. <br />B. Prepare a preliminary design based on the preferred alignment with sufficient detail to <br />prepare a preliminary Feasibility Report. The preliminary design will include watermain, <br />sanitary sewer, storm sewer, and street construction. Stormwater management needs and <br />traffic signal modifications will also be addressed. <br />C. Meet with Anoka County representatives to review any impacts on the County's roadway <br />system. <br />D. Identify right -of -way impacts, including right -of -way and easement needs. <br />E. Prepare an Opinion of Probable Construction Cost for the preferred alignment. <br />F. Prepare a preliminary assessment role. <br />• G. Prepare the preliminary Feasibility Report in conformance with Minnesota Statutes <br />429.031. <br />
The URL can be used to link to this page
Your browser does not support the video tag.