My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-111 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-111 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2014 10:49:27 AM
Creation date
10/15/2014 9:20:35 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
08/13/2007
Council Meeting Type
Regular
Resolution #
07-111
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />The conservation easement will not prohibit docks, but being that Marshan is a very <br />shallow body of water, the costs would be very high and the likelihood of any docks <br />being constructed is pretty minimal. The changes in water levels would also require dock <br />to be elevated to the extent that wildlife would be able to cross under and possibly even <br />use docks as part of their habitat. <br />Park Dedication: The current subdivision ordinance includes park dedication in the <br />amount of $2075 per residential unit, less any land dedication. There is no land <br />dedication needed, as Marshan Park is nearby. <br />Utilities: Sanitary sewer and water are stubbed to the property line on both the north <br />and the south. The appropriate easements are platted for the connection of the church to <br />the services that will be constructed as part of this plat. These and other issues discussed <br />in the City Engineer review memo must be addressed to his satisfaction. <br />Grading: The grading plan has been reviewed by the City Engineer and his <br />comments will need to be addressed to his satisfaction prior to the site being developed. <br />Environmental Board <br />The Environmental Board reviewed the application on May 30th, there recommendations <br />are attached. <br />RECOMMENDATION <br />Staff is recommending adoption of Resolution 07 -111, approving a preliminary plat for <br />an 8 lot subdivision titled Grandview, subject to the following conditions: <br />1. All lots in the plat must agree to connect to City utilities. The City will not approve <br />the final plat without legally enforceable assurance that all properties will connect. <br />2. Issues discussed in the City Engineer review memo must be addressed to his <br />satisfaction. <br />3. A development agreement between the city and the developer must be executed prior <br />to the issuance of any building permits for the site. <br />4. Park dedication must be paid in accordance with the city's fee schedule. <br />5. A conservation easement shall be granted over the drainage and utility easement <br />within the lots fronting Marshan Lake. Easement restrictions shall be defined prior to <br />city council approval of the final plat. <br />6. The Rice Creek Watershed District must review the project prior to building permits <br />being issued by the city for any new construction. <br />7. A boulevard tree shall be provided for each lot frontage. <br />8. The existing roadway easement shall be vacated by the City Council prior to the <br />approval of the final plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.