My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-09-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
06-09-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 2:43:54 PM
Creation date
10/16/2014 1:05:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/09/2014
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 27, 2014 <br />Page 3 of 4 <br />Reference: Vtleli No. 6 Construction <br />4. Advertise, Bid, Review, Tabulate, and Recommend Award <br />a. Submit Bidding documents to QuestCDN, or advertise and distribute as directed by City <br />b. Provide interpretations, answer bidders questions <br />c. Prepare addenda as approved and appropriate <br />d. Attend the Bid opening at the City's request. <br />e. Review and Tabulate Bids, prepare a letter of recommendation <br />5. Construction Services <br />a. Construction Administration <br />• Maintain construction log <br />• Process change orders and periodic pay requests <br />• Conduct progress meeting <br />• Recording of Well Log <br />• Ensure regular sampling is conducted and final samples delivered to the MGS <br />• Sanitary treatment/disinfection of tools and well <br />• Project completion; final payment, site restoration, documentation and reporting, etc. <br />b. Construction Inspection <br />• Periodic/routine visits to determine conformance with the Contract Documents, compliance with <br />the MN Well Code, and: <br />- Plumbness check of the drilling machine <br />- Drilling progress, sampling frequency, lithological identification <br />- Noise abatement is followed <br />Construction site maintenance <br />- Erosion, runoff containment, etc. <br />• Final Plumbness and alignment testing <br />• Grouting; grout delivery quality, quantify for payment, observation of placement methods <br />• Blasting and surging events; seismic and noise witnessing as determined appropriate <br />• Rock removal and quantification for payment <br />• Test pumping for capacity, sand content, water disposal and chemical sampling <br />• Witness color televising and recording of finished well <br />• Final chlorination and sealing of well <br />Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.