My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
07-14-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 2:25:05 PM
Creation date
10/16/2014 1:09:02 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
07/14/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July <br />7/21 1 7/28 <br />1. GOALS AND SPACE NEEDS <br />Programming ch arrette <br />Staff interviews <br />Program document <br />Preliminary budget <br />8/4 <br />August <br />8/11 <br />8/18 <br />S/25 <br />2. SITE SELECTION Site Selection <br />Review all possible s iter <br />Select 3 target sites for study <br />Gather site evaluation data <br />Provide response time traffic studies <br />Obta in geotechnical soil data <br />Devetopsite fit plan for each site <br />Provide s ite comparison results <br />Ciry selects desired site <br />City acquires site <br />3. PROJECT EFFICIENCY GOALS <br />9/1 <br />September <br />9/8 <br />9/15 <br />9/22 <br />9/29 <br />10/6 <br />October <br />10/13 <br />10/20 <br />10/27 <br />11/3 <br />November <br />11/10 <br />11/17 <br />11/24 <br />12/1 <br />December <br />12/8 <br />12/15 <br />12/22 <br />12/29 <br />1/5 <br />January <br />1/12 <br />1/19 <br />1/26 <br />2/2 <br />February March <br />2/9 2/16 2/23 3/2 <br />3/9 <br />3/23 <br />April <br />4/6 <br />4/20 <br />May June <br />5/4 5/18 6/1 <br />6/15 <br />6/29 <br />July <br />7/13 <br />7/27 <br />August <br />8/10 <br />8/24 <br />September <br />9/7 <br />9/21 <br />October <br />10/5 <br />10/19 <br />November <br />11/2 11/16 <br />December <br />11/30 <br />12/14 <br />January <br />12/28 <br />Training feature review & setgoals <br />Sustainability review & set goals <br />Project Effidency document <br />4. PRELIMINARY DESIGN OPTIONS <br />Prelim Design <br />Schematic Design ch arrette <br />Develop muitiple site plan options <br />Develop m u lti pl e f l oor plan options <br />Develop m u lti pl e image Options <br />Preliminary option cost comparisons <br />5. REVISE AND D[VELOP DESIGN OPTION <br />Revise selected site plan <br />Grading & utility concept plan <br />Landscape concept plan <br />Revise selected floor plan <br />Revise selected building image <br />Incorporate train ing featu res <br />Develop colored boards and renderings <br />Schematic Design <br />Update and provide Schematic Estimate <br />Present to City Council <br />6. COMPLETE SCH EMATIC DESIGN <br />Revise per staff & City Cou n ci I fe ed b ack <br />Structural concept plan <br />Adjust design per Budget <br />7. DESIGN DEVELOPMENT <br />II <br />Resin Development <br />Interior a rch ite ctu ra I development <br />Millwork elevations <br />Equipment lists &clan <br />Mechanical system details <br />Electrical system details <br />Sustainability update <br />Material and finish selection <br />Typical building and wall sections <br />Outline specifications & narratives <br />Provide Design Development Estimate <br />8. CONSTRUCTION DOCUMENTS <br />Detailed site, floor and ceiling plans <br />Exterior elevations and details <br />Building sections and wall sections <br />Hardware selection, schedules <br />Interior e I ev ati ons <br />Interior details and millwork <br />50% CD review and coordination <br />HVAC plans and details <br />Plu robing plans and details <br />Structural plans an d details <br />Lighting plans and details <br />Power plans and details <br />Grading &utility plans and details <br />Construction Documents <br />Landscape plans and details <br />Specifications <br />90% CD review and coordination <br />Provide Construction Document Estimate <br />Qu al ity control review <br />City Council approval to bid <br />9. BIDDING <br />Advertise for Bids <br />Distribute bidding documents <br />Answer bidder questions, addenda <br />Pre-bid conference <br />Bid Opening <br />Bidding <br />Review bids and make recommend ati ons <br />Contracts <br />10. CONSTRUCTION ADMINISTRATION <br />Pre -Construction Conference <br />Grading, utilities, foun dations <br />Exterior envelope <br />Interior rooms <br />Finishes <br />Punchlist/ Substantial Completion <br />Owner Occupancy <br />Punchl ist completion <br />Owner Operation al <br />LINO LAKES FIRE HOUSE #2 <br />Construction [SO months) <br />'1114"C'Tft <br />
The URL can be used to link to this page
Your browser does not support the video tag.