Laserfiche WebLink
TABULAITON OF BIDS ' <br />SANDHILL DRIVE STORM SEWER REMOVAL, CLEANING, AND REINSTALLATION TKDA <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 13849.002 <br />ENGINEERS • ARCHITECTS - PLANNERS <br />BIDS OPENED: OCTOBER 5, 2007 <br />*DENOTES ERROR IN BIDDERS CALCULATION GLENN REHBEIN EXC. INC. C.W. HOULE, INC. FOREST LAKE <br />CONTRACTING, INC. <br />TEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 525.00 <br />$ 525.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />2 <br />REMOVE CONCRETE CURB AND GUTTER <br />120 <br />LF <br />$ 2.10 <br />$ 252.00 <br />$ 6.50 <br />$ 780.00 <br />$ 3.00 <br />$ 360.00 <br />3 <br />REMOVE BITUMINOUS <br />193 <br />SY <br />$ 3.00 <br />$ 579.00 <br />$ 4.00 <br />$ 772.00 <br />$ 5.00 <br />$ 965.00 <br />4 <br />GRUB STUMPS <br />9 <br />EA <br />$ 30.00 <br />$ 270.00 <br />$ 35.00 <br />$ 315.00 <br />$ 50.00 <br />$ 450.00 <br />5 <br />SALVAGE /RESPREAD TOPSOIL <br />1 <br />LS <br />$ 425.00 <br />$ 425.00 <br />$ 950.00 <br />$ 950.00 <br />$ 700.00 <br />$ 700.00 <br />6 <br />REMOVE /CLEAN /RELAY 300 LF 30" RCP <br />300 <br />LF <br />$ 57.50 <br />$ 17,250.00 <br />$ 35.00 <br />$ 10,500.00 <br />$ 55.00 <br />$ 16,500.00 <br />7 <br />ROCK TRENCH STABILIZATION (1' DEPTH) <br />290 <br />CY <br />$ 40.00 <br />$ 11,600.00 <br />$ 40.00 <br />$ 11,600.00 <br />$ 20.00 <br />$ 5,800.00 <br />8 <br />ROD ALL PIPE JOINTS (LAST 3 AT FES MAY ALREADY BE DONE) <br />1 <br />LS <br />$ 3,050.00 <br />$ 3,050.00 <br />$ 2,650.00 <br />$ 2,650.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />9 <br />WRAP ALL PIPE JOINTS WITH FABRIC <br />1 <br />LS <br />$ 210.00 <br />$ 210.00 <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />10 <br />CLEAN OUT POND AREA AT FES (WASTE MATERIAL ON SITE) <br />6 <br />EA <br />$ 80.00 <br />$ 480.00 <br />$ 430.00 <br />$ 2,580.00 <br />$ 175.00 <br />$ 1,050.00 <br />11 <br />PLACE 1 -1/2" ROCK AT OUTFALLS (SEE DETAIL) <br />14 <br />CY <br />$ 42.00 <br />$ 588.00 <br />$ 37.00 <br />$ 518.00 <br />$ 35.00 <br />$ 490.00 <br />12 <br />CLASS 5 <br />70 <br />TN <br />$ 22.00 <br />$ 1,540.00 <br />$ 18.50 <br />$ 1,295.00 <br />$ 25.00 <br />$ 1,750.00 <br />13 <br />EROSION CONTROL BLANKET AT FES (EROSION LOGS) <br />6 <br />EA <br />$ 80.00 <br />$ 480.00 <br />$ 250.00 <br />$ 1,500.00 <br />$ 175.00 <br />$ 1,050.00 <br />14 <br />WORK ZONE SIGNAGE - NOTIFY HOMES 24 HRS. BEFORE START <br />1 <br />LS <br />$ 500.00 <br />$ 500.00 <br />$ 740.00 <br />$ 740.00 <br />$ 800.00 <br />$ 800.00 <br />TOTAL BID AMOUNT <br />$ 37,749.00 <br />$ 38,800.00 <br />$ 43,915.00 <br />Page 1 <br />