My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2007-170 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2007
>
2007-170 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 2:06:32 PM
Creation date
10/16/2014 1:34:27 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
10/08/2007
Council Meeting Type
Regular
Resolution #
07-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/01/2007 12:19 FAX 6514064724 MN DOT /MENDOTA HTS <br />• <br />• <br />Mn /DOT TP -2460 -0112 -92) <br />002 <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 6 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />The construction plans on sheet 130 of 198 show the location of the existing 4" R.S.C. in place between H.H. 8 thru H.H. <br />10 located as part of Signal System "A" of Town Center Parkway and. C.S.A.H. 23. <br />In the field it was discovered that the 4" R.S.C. was installed at a depth that made it obsolete to be incorporated into <br />Signal System "A ". The Project Engineer has determined that a new 4" R.S.C. shall be installed by directional boring. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to construct the above <br />stated 4" R.S.C. between H.H 8 thru H.H. 10 of Signal System "A ". <br />All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard <br />Specifications, Mn/DOT Standard Plates and as directed by the Engineer. <br />Payment to the Contractor for this work will be at the negotiated prices, as shown below in the Estimate of Cost. <br />ESTIMATE OF COST <br />Item No. Description <br />4" R.S.C. <br />Directional Boring <br />10% Prime Contractor Included <br />Distribution: S.P. 0280 -55 Group 01 — 100% <br />CHANGE TN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased ( ) by Calendar Days <br />Is decreased ( ). by Calendar Days <br />b. Is not changed ( X ) <br />c. May be revised if the work affected <br />the controlling operation ( ) <br />Unit Quantity Unit Price Amount <br />FT <br />100 $38.50 $3.850.00 <br />Total Increase $3,850.00 <br />9- <br />Issued By: i _. 'I ` <br />G,); iet/Resident / Engineer Datc <br />Approved By: <br />City of Lino Lakes <br />Approved By: <br />Anoka County <br />Date <br />Date <br />Accepted By: .�� 1. -27 1L . - 47 <br />Contractor's Authorized Representative Date <br />Original to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County <br />
The URL can be used to link to this page
Your browser does not support the video tag.