My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/06/1986 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
1986
>
10/06/1986 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2014 1:18:29 PM
Creation date
10/27/2014 12:23:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
10/06/1986
Council Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />BUDGET MEETING <br />October 6, 1986 <br />The Budget Meeting was called to order at 7:00 P.M. by <br />Mayor Benson. Council Members present: Marier, Bisel, <br />Bohjanen, Reinert. Don Volk, Public Works Director, <br />Marilyn Anderson, Clerk- Treasurer and Randy Schumacher, <br />Administrator, were also present. <br />Molin Concrete Right -of -Way <br />The 4th Avenue Project has begun and utility companies are <br />proceeding to move their lines from the right -of -way. <br />There is a concern at Molin Concrete because Molin has <br />stored materials on the area that has been taken by the <br />City, for additional right -of -way. Molin has builtaddi- <br />tional storage areas but they too are now full and there <br />is no other place to move the material. <br />Mr. Bill Molin asked for a time extension of one month for <br />moving his material off of the right -of -way. He explained <br />everything that is in storage is sold and they are waiting <br />for drier weather so that the material can be moved to <br />construction sites. Mayor Benson asked if the material <br />could be moved to the building site now even though they <br />are not ready for it. Mr. Molin said this is almost im- <br />possible since there is usually very little area to store <br />anything on site. Also, a part of Molin Concrete's job is <br />to place the product on the building. <br />Mr. Schumacher explained that a 30 -day delay in clearing the <br />right -of -way would cause problems for the contractor be- <br />cause there is a clause in the contractor's contract stating <br />he will be fined if the job is not completed by a specified <br />date. <br />There was discussion of storing the finished product away <br />from the Molin Concrete site but Mr. Molin explained this <br />would not be practical because there would not be equip- <br />ment available to load the material again. <br />Mr. Schumacher will contact the contractor on this project <br />and will get back with Mr. Molin on Tuesday. <br />1987 Budget <br />Mr. Neal Benjamin, Lino Lakes Centennial Fire District Com- <br />missioner,- was present. Mr. Schumacher asked Mr. Benjamin <br />
The URL can be used to link to this page
Your browser does not support the video tag.