My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1988-002 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
1988
>
1988-002 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 11:56:42 AM
Creation date
10/30/2014 10:34:39 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
01/11/1988
Council Meeting Type
Regular
Resolution #
88-002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Property adjacent to projects constructed under MSA standards shall be <br />assessed as follows: <br />A. Street Surfacing and Concrete Curb and Gutter <br />The rate used shall be equivalent to a standard residential <br />street assessment in other areas of Lino; Lakes. The rates shall <br />be computed by using the weighted average of the previous three <br />years for street construction adjusted by the ENR Cost Index. <br />Storm Sewer <br />100% of the total actual storm sewer construction costs shall be <br />assessed 'against the _benefitted property. <br />COUNTY ROADS AND /OR COUNTY STATE -AID . STREETS <br />Certain streets within the City of Lino Lakes are designated as County <br />Roads and /or County State -Aid streets and can be constructed utilizing <br />County funds. These projects must be constructed in accordance with <br />County standards. <br />Property adjacent to protects constructed under County standards shall <br />be assessed as follows: <br />▪ Street Surfacing and Concrete Curb and Gutter <br />The rate used shall b,e` equivalent to a standard residential <br />street assessment , in other areas of Lino ° Lakes. The rates shall <br />be computed by using the weighted average of the previous three <br />years for street construction adjusted by the ENR Cost Index. <br />. Storm Sewer <br />100% of the total actual storm sewer construction costs shall be <br />assessed against the benefitted property. <br />10. .r REPLACEMENT PROJECTS <br />Section 2 on page 3 of this policy establ ishes a life cycle expectancy <br />for each type of improvement. If a street or utility is replaced <br />before the life __expectancy of the : protect is utilized, the assessment <br />for the replacement project will be computed by using the methods <br />outlined in this manual and prorating the -cost against the remaining <br />years of the original protect life expectancy.` <br />100% of the cost of street base and surfacing on replacement protects, <br />that were not originally built to current City standards, shall be <br />allocated and assessed against the benefitted property. <br />1 -11 -88 <br />-15- <br />7777 -007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.