My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2004-002 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2004
>
2004-002 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2014 1:57:34 PM
Creation date
11/3/2014 1:31:57 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
01/12/2004
Council Meeting Type
Regular
Resolution #
04-002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Justin's Preserve Page 2 December 2, 2003 <br />City of Lino Lakes, Minnesota <br />by the applicant's Engineer. However, the extent of the wetland's bounce or potential high water <br />elevation (HWL) is not known or shown on the plan. Therefore, further documentation must be <br />provided to show that the floor and building elevations proposed will meet City regulations in <br />relation to the wetland. <br />3. The Contractor shall be responsible for obtaining an NPDES Permit and Storm Water Pollution <br />Prevention Plan in accordance with State of Minnesota Law. This will also require providing to the <br />City a copy of the Stormwater Pollution Prevention Plan (SWPPP), required as part of the NPDES <br />submittal. If the actual area of property to be disturbed is less than 1 -acre, an NPDES permit will not <br />be required. However, the applicant would be required to demonstrate on the plan accordingly. <br />Also, because of the close proximity to Baldwin Lake, and the existing wetland immediately adjacent <br />to the proposed home site, sedimentation and erosion control measures must be fully implemented <br />and enforced per City of Lino Lakes and RCWD requirements. <br />4. Drainage and utility easements are provided adjacent to property lines and over wetland areas in <br />accordance with City requirements. These easements shall also be provided on the Final Plat <br />5. Additional notes and details shall be included with the plans providing for adherence to the standards <br />and requirements of the City of Lino Lakes. This shall include standard details for watermain and <br />sanitary sewer services and appurtenances, and notes referring to utility construction requirements of <br />the City of Lino Lakes and Utility Specifications of the City Engineer's Association of Minnesota <br />(CEAM) as applicable. <br />6. The proposed subdivision and construction must adhere to Floodplain and Shoreline Management <br />requirements of the City of Lino Lakes as applicable. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.