TABULATION OF BIDS
<br />62ND STREET RECONSTRUCTION
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA COMMISSION NO 12510 -02
<br />BIDS OPENED: APRIL 2, 2004, AT 10 AM
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />ENGINEER'S ESTIMATE ARNT CONSTRUCTION
<br />ITE MN /DOT UNIT TOTAL UNIT TOTAL
<br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
<br />����
<br />ENGINEERS • ARCH! I NA S • PLANNERS
<br />CENTRAL LANDSCAPING
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />62ND STREET RECONSTRUCTION
<br />1
<br />2021.501
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 65,000.00
<br />$ 65,000.00
<br />$ 36,000.00
<br />$ 36,000.00
<br />$ 24,000.00
<br />$ 24,000.00
<br />2
<br />2101.502
<br />CLEARING
<br />260
<br />TR
<br />$ 115.00
<br />$ 29,900.00
<br />$ 40.00
<br />$ 10,400.00
<br />$ 12.50
<br />$ 3,250.00
<br />3
<br />2101.507
<br />GRUBBING
<br />260
<br />TR
<br />$ 100.00
<br />$ 26,000.00
<br />$ 22.00
<br />$ 5,720.00
<br />$ 12.50
<br />$ 3,250.00
<br />4
<br />2104.501
<br />REMOVE PIPE (CULVERT OR STORM SEWER)
<br />331
<br />LF
<br />$ 11.00
<br />$ 3,641.00
<br />$ 11.00
<br />$ 3,641.00
<br />$ 11.00
<br />$ 3,641.00
<br />5
<br />2104.501
<br />REMOVE CURB & GUTTER (ALL TYPES)
<br />788
<br />LF
<br />$ 3.00
<br />$ 2,364.00
<br />$ 2.00
<br />$ 1,576.00
<br />$ 4.00
<br />$ 3,152.00
<br />6
<br />2104.501
<br />REMOVE FENCE
<br />1,061
<br />LF
<br />$ 7.00
<br />$ 7,427.00
<br />$ 1.00
<br />$ 1,061.00
<br />$ 1.00
<br />$ 1,061.00
<br />7
<br />2104.501
<br />REMOVE WATERMAIN
<br />5
<br />LF
<br />$ 10.00
<br />$ 50.00
<br />$ 20.00
<br />$ 100.00
<br />$ 20.00
<br />$ 100.00
<br />8
<br />2104.503
<br />REMOVE CONCRETE PAVEMENT (DRIVEWAY)
<br />220
<br />SF
<br />$ 2.00
<br />$ 440.00
<br />$ 1.00
<br />$ 220.00
<br />$ 2.00
<br />$ 440.00
<br />9
<br />2104.505
<br />REMOVE BITUMINOUS SURFACING
<br />13,706
<br />SY
<br />$ 2.50
<br />$ 34,265.00
<br />$ 1.00
<br />$ 13,706.00
<br />$ 1.25
<br />$ 17,132.50
<br />10
<br />2104.509
<br />REMOVE SIGN TYPE C
<br />1
<br />EA
<br />$ 30.00
<br />$ 30.00
<br />$ 45.00
<br />$ 45.00
<br />$ 15.00
<br />$ 15.00
<br />11
<br />2104.511
<br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
<br />50
<br />LF
<br />$ 5.00
<br />$ 250.00
<br />$ 3.00
<br />$ 150.00
<br />$ 5.00
<br />$ 250.00
<br />12
<br />2104.513
<br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
<br />430
<br />LF
<br />$ 3.00
<br />$ 1,290.00
<br />$ 1.00
<br />$ 430.00
<br />$ 3.00
<br />$ 1,290.00
<br />13
<br />2104.523
<br />SALVAGE MAIL BOX SUPPORT
<br />9
<br />EA
<br />$ 65.00
<br />$ 585.00
<br />$ 50.00
<br />$ 450.00
<br />$ 25.00
<br />$ 225.00
<br />14
<br />2104.523
<br />SALVAGE SIGN
<br />8
<br />EA
<br />$ 30.00
<br />$ 240.00
<br />$ 25.00
<br />$ 200.00
<br />$ 15.00
<br />$ 120.00
<br />15
<br />2104.523
<br />SALVAGE GATE VALVE & BOX
<br />1
<br />EA
<br />$ 100.00
<br />$ 100.00
<br />$ 450.00
<br />$ 450.00
<br />$ 450.00
<br />$ 450.00
<br />16
<br />2105.501
<br />COMMON EXCAVATION
<br />3,562
<br />CY
<br />$ 7.00
<br />$ 24,934.00
<br />$ 9.36
<br />$ 33,340.32
<br />$ 6.65
<br />$ 23,687.30
<br />17
<br />2105.505
<br />MUCK EXCAVATION
<br />5,574
<br />CY
<br />$ 10.00
<br />$ 55,740.00
<br />$ 5.98
<br />$ 33,332.52
<br />$ 6.50
<br />$ 36,231.00
<br />18
<br />2105.507
<br />SUBGRADE EXCAVATION
<br />2,000
<br />CY
<br />$ 7.00
<br />$ 14,000.00
<br />$ 5.98
<br />$ 11,960.00
<br />$ 6.00
<br />$ 12,000.00
<br />19
<br />2105.511
<br />DITCH EXCAVATION
<br />205
<br />CY
<br />$ 9.00
<br />$ 1,845.00
<br />$ 7.40
<br />$ 1,517.00
<br />$ 7.00
<br />$ 1,435.00
<br />20
<br />2105.522
<br />SELECT GRANULAR BORROW (CV) (P)
<br />11,530
<br />CY
<br />$ 10.00
<br />$ 115,300.00
<br />$ 12.60
<br />$ 145,278.00
<br />$ 13.25
<br />$ 152,772.50
<br />21
<br />2105.525
<br />TOPSOIL BORROW (LV)
<br />2,503
<br />CY
<br />$ 9.00
<br />$ '22,527.00
<br />$ 0.01
<br />$ 25.03
<br />$ 9.00
<br />$ 22,527.00
<br />22
<br />2105.603
<br />CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING)
<br />3,000
<br />LF
<br />$ 1.00
<br />$ 3,000.00
<br />$ 2.80
<br />$ 8,400.00
<br />$ 2.80
<br />$ 8,400.00
<br />23
<br />2105.604
<br />GEOTEXTILE FABRIC TYPE IV
<br />855
<br />SY
<br />$ 3.00
<br />$ 2,565.00
<br />$ 1.40
<br />$ 1,197.00
<br />$ 1.95
<br />$ 1,667.25
<br />24
<br />2123.61
<br />EXPLORATORY DIGGING
<br />10
<br />HR
<br />$ 300.00
<br />$ 3,000.00
<br />$ 300.00
<br />$ 3,000.00
<br />$ 300.00
<br />$ 3,000.00
<br />25
<br />2211.501
<br />AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, &
<br />DRIVEWAY (100% CRUSHED)
<br />10,669
<br />TN
<br />$ 10.00
<br />$ 106,690.00
<br />$ 10.52
<br />$ 112,237.88
<br />$ 11.05
<br />$ 117,892.45
<br />26
<br />2350.501
<br />TYPE LV AGG. 3 WEARING COURSE (B) (STREET)
<br />1,661
<br />TN
<br />$ 34.00
<br />$ 56,474.00
<br />$ 31.00
<br />$ 51,491.00
<br />$ 29.85
<br />$ 49,580.85
<br />27
<br />2350.501
<br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B)
<br />411
<br />TN
<br />$ 41.00
<br />$ 16,851.00
<br />$ 37.00
<br />$ 15,207.00
<br />$ 36.16
<br />$ 14,861.76
<br />28
<br />2350.502
<br />TYPE LV AGG. 3 NON - WEARING COURSE (B) (STREET)
<br />1,822
<br />TN
<br />$ 33.00
<br />$ 53,526.00
<br />$ 30.00
<br />$ 48,660.00
<br />$ 29.39
<br />$ 47,670.58
<br />29
<br />2350.503
<br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR
<br />DRIVEWAYS (B)
<br />215
<br />SY
<br />$ 12.00
<br />$ 2,580.00
<br />$ 12.00
<br />$ 2,580.00
<br />$ 16.50
<br />$ 3,547.50
<br />30
<br />2357.502
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />664
<br />GAL
<br />$ 2.00
<br />$ 1,328.00
<br />$ 1.40
<br />$ 929.60
<br />$ 1.40
<br />$ 929.60
<br />31
<br />2501.515
<br />12" RC PIPE APRON W/ TRASH GUARD
<br />1
<br />EA
<br />$ 600.00
<br />$ 600.00
<br />$ 700.00
<br />$ 700.00
<br />$ 700.00
<br />$ 700.00
<br />32
<br />2501.515
<br />15" RC PIPE APRON W/ TRASH GUARD
<br />14
<br />EA
<br />$ 850.00
<br />$ 9,100.00
<br />$ 745.00
<br />$ 10,430.00
<br />$ 745.00
<br />$ 10,430.00
<br />33
<br />2501.515
<br />18" RC PIPE APRON W/ TRASH GUARD
<br />1
<br />EA
<br />$ 750.00
<br />$ 750.00
<br />$ 810.00
<br />$ 810.00
<br />$ 810.00
<br />$ 810.00
<br />34
<br />2501.515
<br />24" RC PIPE APRON W/ TRASH GUARD
<br />2
<br />EA
<br />$ 900.00
<br />$ 1,800.00
<br />$ 960.00
<br />$ 1,920.00
<br />$ 960.00
<br />$ 1,920.00
<br />35
<br />2502.541
<br />12" RC PIPE SEWER CLASS V DESIGN 3006
<br />195
<br />LF
<br />$ 27.00
<br />$ 5,265.00
<br />$ 19.00
<br />$ 3,705.00
<br />$ 19.00
<br />$ 3,705.00
<br />36
<br />2503.541
<br />15" RC PIPE SEWER CLASS V DESIGN 3006
<br />1,129
<br />LF
<br />$ 28.00
<br />$ 31,612.00
<br />$ 20.50
<br />$ 23,144.50
<br />$ 20.50
<br />$ 23,144.50
<br />37
<br />2503.541
<br />18" RC PIPE SEWER CLASS V DESIGN 3006
<br />392
<br />LF
<br />$ 30.00
<br />$ 11 ,760.00
<br />$ 23.00
<br />$ 9,016.00
<br />$ 23.00
<br />$ 9,016.00
<br />38
<br />2503.541
<br />24" RC PIPE SEWER CLASS III DESIGN 3006
<br />71
<br />LF
<br />$ 35.00
<br />$ 2,485.00
<br />$ 29.50
<br />$ 2,094.50
<br />$ 29.50
<br />$ 2,094.50
<br />39
<br />2503.602
<br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER)
<br />4
<br />EA
<br />$ 400.00
<br />$ 1,600.00
<br />$ 1,850.00
<br />$ 7,400.00
<br />$ 1,850.00
<br />$ 7,400.00
<br />40
<br />2503.602
<br />CONNECT TO EXISTING MANHOLES (STORM SEWER)
<br />2
<br />EA
<br />$ 600.00
<br />$ 1,200.00
<br />$ 1,075.00
<br />$ 2,150.00
<br />$ 1,075.00
<br />$ 2,150.00
<br />41
<br />2503.602
<br />8 "X4" PVC WYE (SCHEDULE 40)
<br />12
<br />EA
<br />$ 85.00
<br />$ 1,020.00
<br />$ 70.00
<br />$ 840.00
<br />$ 70.00
<br />$ 840.00
<br />42
<br />2503.602
<br />8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH)
<br />384
<br />LF
<br />$ 48.00
<br />$ 18,432.00
<br />$ 14.50
<br />$ 5,568.00
<br />$ 13.50
<br />$ 5,184.00
<br />43
<br />2503.603
<br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH)
<br />184
<br />LF
<br />$ 50.00
<br />$ 9,200.00
<br />$ 17.50
<br />$ 3,220.00
<br />$ 17.50
<br />$,„ 3,220.00
<br />
|