Laserfiche WebLink
TABULATION OF BIDS <br />62ND STREET RECONSTRUCTION <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO 12510 -02 <br />BIDS OPENED: APRIL 2, 2004, AT 10 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ESTIMATE ARNT CONSTRUCTION <br />ITE MN /DOT UNIT TOTAL UNIT TOTAL <br />NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />���� <br />ENGINEERS • ARCH! I NA S • PLANNERS <br />CENTRAL LANDSCAPING <br />UNIT TOTAL <br />PRICE AMOUNT <br />62ND STREET RECONSTRUCTION <br />1 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 65,000.00 <br />$ 65,000.00 <br />$ 36,000.00 <br />$ 36,000.00 <br />$ 24,000.00 <br />$ 24,000.00 <br />2 <br />2101.502 <br />CLEARING <br />260 <br />TR <br />$ 115.00 <br />$ 29,900.00 <br />$ 40.00 <br />$ 10,400.00 <br />$ 12.50 <br />$ 3,250.00 <br />3 <br />2101.507 <br />GRUBBING <br />260 <br />TR <br />$ 100.00 <br />$ 26,000.00 <br />$ 22.00 <br />$ 5,720.00 <br />$ 12.50 <br />$ 3,250.00 <br />4 <br />2104.501 <br />REMOVE PIPE (CULVERT OR STORM SEWER) <br />331 <br />LF <br />$ 11.00 <br />$ 3,641.00 <br />$ 11.00 <br />$ 3,641.00 <br />$ 11.00 <br />$ 3,641.00 <br />5 <br />2104.501 <br />REMOVE CURB & GUTTER (ALL TYPES) <br />788 <br />LF <br />$ 3.00 <br />$ 2,364.00 <br />$ 2.00 <br />$ 1,576.00 <br />$ 4.00 <br />$ 3,152.00 <br />6 <br />2104.501 <br />REMOVE FENCE <br />1,061 <br />LF <br />$ 7.00 <br />$ 7,427.00 <br />$ 1.00 <br />$ 1,061.00 <br />$ 1.00 <br />$ 1,061.00 <br />7 <br />2104.501 <br />REMOVE WATERMAIN <br />5 <br />LF <br />$ 10.00 <br />$ 50.00 <br />$ 20.00 <br />$ 100.00 <br />$ 20.00 <br />$ 100.00 <br />8 <br />2104.503 <br />REMOVE CONCRETE PAVEMENT (DRIVEWAY) <br />220 <br />SF <br />$ 2.00 <br />$ 440.00 <br />$ 1.00 <br />$ 220.00 <br />$ 2.00 <br />$ 440.00 <br />9 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING <br />13,706 <br />SY <br />$ 2.50 <br />$ 34,265.00 <br />$ 1.00 <br />$ 13,706.00 <br />$ 1.25 <br />$ 17,132.50 <br />10 <br />2104.509 <br />REMOVE SIGN TYPE C <br />1 <br />EA <br />$ 30.00 <br />$ 30.00 <br />$ 45.00 <br />$ 45.00 <br />$ 15.00 <br />$ 15.00 <br />11 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />50 <br />LF <br />$ 5.00 <br />$ 250.00 <br />$ 3.00 <br />$ 150.00 <br />$ 5.00 <br />$ 250.00 <br />12 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />430 <br />LF <br />$ 3.00 <br />$ 1,290.00 <br />$ 1.00 <br />$ 430.00 <br />$ 3.00 <br />$ 1,290.00 <br />13 <br />2104.523 <br />SALVAGE MAIL BOX SUPPORT <br />9 <br />EA <br />$ 65.00 <br />$ 585.00 <br />$ 50.00 <br />$ 450.00 <br />$ 25.00 <br />$ 225.00 <br />14 <br />2104.523 <br />SALVAGE SIGN <br />8 <br />EA <br />$ 30.00 <br />$ 240.00 <br />$ 25.00 <br />$ 200.00 <br />$ 15.00 <br />$ 120.00 <br />15 <br />2104.523 <br />SALVAGE GATE VALVE & BOX <br />1 <br />EA <br />$ 100.00 <br />$ 100.00 <br />$ 450.00 <br />$ 450.00 <br />$ 450.00 <br />$ 450.00 <br />16 <br />2105.501 <br />COMMON EXCAVATION <br />3,562 <br />CY <br />$ 7.00 <br />$ 24,934.00 <br />$ 9.36 <br />$ 33,340.32 <br />$ 6.65 <br />$ 23,687.30 <br />17 <br />2105.505 <br />MUCK EXCAVATION <br />5,574 <br />CY <br />$ 10.00 <br />$ 55,740.00 <br />$ 5.98 <br />$ 33,332.52 <br />$ 6.50 <br />$ 36,231.00 <br />18 <br />2105.507 <br />SUBGRADE EXCAVATION <br />2,000 <br />CY <br />$ 7.00 <br />$ 14,000.00 <br />$ 5.98 <br />$ 11,960.00 <br />$ 6.00 <br />$ 12,000.00 <br />19 <br />2105.511 <br />DITCH EXCAVATION <br />205 <br />CY <br />$ 9.00 <br />$ 1,845.00 <br />$ 7.40 <br />$ 1,517.00 <br />$ 7.00 <br />$ 1,435.00 <br />20 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />11,530 <br />CY <br />$ 10.00 <br />$ 115,300.00 <br />$ 12.60 <br />$ 145,278.00 <br />$ 13.25 <br />$ 152,772.50 <br />21 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />2,503 <br />CY <br />$ 9.00 <br />$ '22,527.00 <br />$ 0.01 <br />$ 25.03 <br />$ 9.00 <br />$ 22,527.00 <br />22 <br />2105.603 <br />CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) <br />3,000 <br />LF <br />$ 1.00 <br />$ 3,000.00 <br />$ 2.80 <br />$ 8,400.00 <br />$ 2.80 <br />$ 8,400.00 <br />23 <br />2105.604 <br />GEOTEXTILE FABRIC TYPE IV <br />855 <br />SY <br />$ 3.00 <br />$ 2,565.00 <br />$ 1.40 <br />$ 1,197.00 <br />$ 1.95 <br />$ 1,667.25 <br />24 <br />2123.61 <br />EXPLORATORY DIGGING <br />10 <br />HR <br />$ 300.00 <br />$ 3,000.00 <br />$ 300.00 <br />$ 3,000.00 <br />$ 300.00 <br />$ 3,000.00 <br />25 <br />2211.501 <br />AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & <br />DRIVEWAY (100% CRUSHED) <br />10,669 <br />TN <br />$ 10.00 <br />$ 106,690.00 <br />$ 10.52 <br />$ 112,237.88 <br />$ 11.05 <br />$ 117,892.45 <br />26 <br />2350.501 <br />TYPE LV AGG. 3 WEARING COURSE (B) (STREET) <br />1,661 <br />TN <br />$ 34.00 <br />$ 56,474.00 <br />$ 31.00 <br />$ 51,491.00 <br />$ 29.85 <br />$ 49,580.85 <br />27 <br />2350.501 <br />TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) <br />411 <br />TN <br />$ 41.00 <br />$ 16,851.00 <br />$ 37.00 <br />$ 15,207.00 <br />$ 36.16 <br />$ 14,861.76 <br />28 <br />2350.502 <br />TYPE LV AGG. 3 NON - WEARING COURSE (B) (STREET) <br />1,822 <br />TN <br />$ 33.00 <br />$ 53,526.00 <br />$ 30.00 <br />$ 48,660.00 <br />$ 29.39 <br />$ 47,670.58 <br />29 <br />2350.503 <br />TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR <br />DRIVEWAYS (B) <br />215 <br />SY <br />$ 12.00 <br />$ 2,580.00 <br />$ 12.00 <br />$ 2,580.00 <br />$ 16.50 <br />$ 3,547.50 <br />30 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />664 <br />GAL <br />$ 2.00 <br />$ 1,328.00 <br />$ 1.40 <br />$ 929.60 <br />$ 1.40 <br />$ 929.60 <br />31 <br />2501.515 <br />12" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 600.00 <br />$ 600.00 <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />32 <br />2501.515 <br />15" RC PIPE APRON W/ TRASH GUARD <br />14 <br />EA <br />$ 850.00 <br />$ 9,100.00 <br />$ 745.00 <br />$ 10,430.00 <br />$ 745.00 <br />$ 10,430.00 <br />33 <br />2501.515 <br />18" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 750.00 <br />$ 750.00 <br />$ 810.00 <br />$ 810.00 <br />$ 810.00 <br />$ 810.00 <br />34 <br />2501.515 <br />24" RC PIPE APRON W/ TRASH GUARD <br />2 <br />EA <br />$ 900.00 <br />$ 1,800.00 <br />$ 960.00 <br />$ 1,920.00 <br />$ 960.00 <br />$ 1,920.00 <br />35 <br />2502.541 <br />12" RC PIPE SEWER CLASS V DESIGN 3006 <br />195 <br />LF <br />$ 27.00 <br />$ 5,265.00 <br />$ 19.00 <br />$ 3,705.00 <br />$ 19.00 <br />$ 3,705.00 <br />36 <br />2503.541 <br />15" RC PIPE SEWER CLASS V DESIGN 3006 <br />1,129 <br />LF <br />$ 28.00 <br />$ 31,612.00 <br />$ 20.50 <br />$ 23,144.50 <br />$ 20.50 <br />$ 23,144.50 <br />37 <br />2503.541 <br />18" RC PIPE SEWER CLASS V DESIGN 3006 <br />392 <br />LF <br />$ 30.00 <br />$ 11 ,760.00 <br />$ 23.00 <br />$ 9,016.00 <br />$ 23.00 <br />$ 9,016.00 <br />38 <br />2503.541 <br />24" RC PIPE SEWER CLASS III DESIGN 3006 <br />71 <br />LF <br />$ 35.00 <br />$ 2,485.00 <br />$ 29.50 <br />$ 2,094.50 <br />$ 29.50 <br />$ 2,094.50 <br />39 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (SANITARY SEWER) <br />4 <br />EA <br />$ 400.00 <br />$ 1,600.00 <br />$ 1,850.00 <br />$ 7,400.00 <br />$ 1,850.00 <br />$ 7,400.00 <br />40 <br />2503.602 <br />CONNECT TO EXISTING MANHOLES (STORM SEWER) <br />2 <br />EA <br />$ 600.00 <br />$ 1,200.00 <br />$ 1,075.00 <br />$ 2,150.00 <br />$ 1,075.00 <br />$ 2,150.00 <br />41 <br />2503.602 <br />8 "X4" PVC WYE (SCHEDULE 40) <br />12 <br />EA <br />$ 85.00 <br />$ 1,020.00 <br />$ 70.00 <br />$ 840.00 <br />$ 70.00 <br />$ 840.00 <br />42 <br />2503.602 <br />8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) <br />384 <br />LF <br />$ 48.00 <br />$ 18,432.00 <br />$ 14.50 <br />$ 5,568.00 <br />$ 13.50 <br />$ 5,184.00 <br />43 <br />2503.603 <br />8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) <br />184 <br />LF <br />$ 50.00 <br />$ 9,200.00 <br />$ 17.50 <br />$ 3,220.00 <br />$ 17.50 <br />$,„ 3,220.00 <br />