Laserfiche WebLink
TABULWON OF BIDS <br />HOLLY DRIVE IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />S.A.P. 210 - 109 -02 <br />TKDA COMMISSION NO 12623 -02 <br />BIDS OPENED: JULY 15, 2004, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ESTIMATE W.B. MILLER, INC. <br />ITEM MN/DOT UNIT TOTAL UNIT TOTAL <br />NO. SPEC. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />N <br />��� <br />ENGINEERS - ARCHITECTS • PLANNERS <br />ARNT CONSTRUCTION CO. <br />UNIT TOTAL <br />PRICE AMOUNT <br />HOLLY DRIVE IMPROVEMENTS <br />1 <br />2011.602 <br />REMOVE & RESET EXISTING PROPERTY IRONS <br />21 <br />EA <br />$ 200.00 <br />$ 4,200.00 <br />$ 110.00 <br />$ 2,310.00 <br />$ 62.00 <br />$ 1,302.00 <br />" <br />2 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 40,000.00 <br />$ 40,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />$ 18,000.00 <br />$ 18,000.00 <br />3 <br />2101.502 <br />CLEARING <br />200 <br />TR <br />$ 75.00 <br />$ 15,000.00 <br />$ 160.00 <br />$ 32,000.00 <br />$ 80.00 <br />$ 16,000.00 <br />4 <br />2101.507 <br />GRUBBING <br />215 <br />TR <br />$ 60.00 <br />$ 12,900.00 <br />$ 105.00 <br />$ 22,575.00 <br />$ 35.00 <br />$ 7,525.00 <br />5 <br />2104.501 <br />REMOVE PIPE CULVERT (CMP,CPP) <br />258 <br />LF <br />$ 11.00 <br />$ 2,838.00 <br />$ 3.70 <br />$ 954.60 <br />$ 14.00 <br />$ 3,612.00 <br />6 <br />2104.501 <br />REMOVE PIPE CULVERT (RCP) <br />308 <br />LF <br />$ 12.00 <br />$ 3,696.00 <br />$ 4.75 <br />$ 1,463.00 <br />$ 15.00 <br />$ 4,620.00 <br />7 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />39 <br />LF <br />$ 12.00 <br />$ 468.00 <br />$ 4.75 <br />$ 185.25 <br />$ 16.00 <br />$ 624.00 <br />8 <br />2104.501 <br />REMOVE CONCRETE CURB & GUTTER <br />154 <br />LF <br />$ 4.00 <br />$ 616.00 <br />$ 4.25 <br />$. 654.50 <br />$ 2.00 <br />$ 308.00 <br />9 <br />2104.503 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />772 <br />SF <br />$ 2.00 <br />$ 1,544.00 <br />$ 5.25 <br />$ 4,053.00 <br />$ 0.50 <br />$ 386.00 <br />10 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING (STREET & DRIVEWAY) <br />11,527 <br />SY <br />$ 2.00 <br />$ 23,054.00 <br />$ 9.45 <br />$ 108,930.15 <br />$ 1.25 <br />$ 14,408.75 <br />11 <br />2104.509 <br />REMOVE CATCH BASIN <br />2 <br />EA <br />$ 400.00 <br />$ 800.00 <br />$ 105.00 <br />$ 210.00 <br />$ 350.00 <br />$ 700.00 <br />12 <br />2104:511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />42 <br />LF <br />$ 4.00 <br />$ 168.00 <br />$ 4.20 <br />$ 176.40 <br />$ 3.00 <br />$ 126.00 <br />13 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />292 <br />LF <br />$ 3.00 <br />$ 876.00 <br />$ 3.65 <br />$ 1,065.80 <br />$ 3.00 <br />$ 876.00 <br />14 <br />2104.521 <br />SALVAGE & REINSTALL WIRE FENCE <br />130 <br />LF <br />$ 40.00 <br />$ 5,200.00 <br />$ 4.25 <br />$ 552.50 <br />$ 10.00 <br />$ 1,300.00 <br />15 <br />2104.521 <br />SALVAGE & REINSTALL WOOD FENCE <br />106 <br />LF <br />$ 30.00 <br />$ 3,180.00 <br />$ 12.50 <br />$ 1,325.00 <br />$ 15.00 <br />$ 1,590.00 <br />16 <br />2104.523 <br />SALVAGE & RELOCATE MAIL BOX WITH SUPPORT <br />5 <br />EA <br />$ 150.00 <br />$ 750.00 <br />$ 95.00 <br />$ 475.00 <br />$ 85.00 <br />$ 425.00 <br />17 <br />2104.523 <br />SALVAGE SIGN (INCL. POST & ASSEMBLY) <br />11 <br />EA <br />$ 30.00 <br />$ 330.00 <br />$ 78.00 <br />$ 858.00 <br />$ 25.00 <br />$ 275.00 <br />18 <br />2105.501 <br />COMMON EXCAVATION (P) <br />6,742 <br />CY <br />$ 7.00 <br />$ 47,194.00 <br />$ 7.85 <br />$ 52,924.70 <br />$ 6.86 <br />$ 46,250.12 <br />19 <br />2105.501 <br />POND EXCAVATION (P) <br />132 <br />CY <br />$ 6.00 <br />$ 792.00 <br />$ 1025 <br />$ 1,353.00 <br />$ 8.00 <br />$ 1,056.00 <br />20 <br />2105.507 <br />SUBGRADE EXCAVATION <br />4,000.00 <br />CY <br />$ 7.00 <br />$ 28,000.00 <br />$ 6.30 <br />$ 25,200.00 <br />$ 6.86 <br />$ 27,440.00 <br />21 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) <br />4,000 <br />CY <br />$ 13.00 <br />$ 52,000.00 <br />$ 12.00 <br />$ 48,000.00 <br />$ 13.66 <br />$ 54,640.00 <br />22 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />1,036 <br />CY <br />$ 10.00 <br />$ 10,360.00 <br />$ 10.50 <br />$ 10,878.00 <br />$ 0.01 <br />$ 10.36 <br />23 <br />2123.61 <br />EXPLORATORY DIGGING <br />5 <br />HR <br />$ 300.00 <br />$ 1,500.00 <br />$ 110.00 <br />$ 550.00 <br />$ 200.00 <br />$ 1,000.00 <br />24 <br />2211.501 <br />AGGREGATE BASE, CLASS 5 FOR STREET, TRAIL, & DRIVEWAY (100% CRUSHED) <br />9,485 <br />TN <br />$ 12.00 <br />$ 113,820.00 <br />$ 0.10 <br />$ 948.50 <br />$ 1036 <br />$ 98264.60 <br />25 <br />2350.501 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR STREET (C) <br />1,765 <br />TN <br />$ 36.00 <br />$ 63,540.00 <br />$ 40.25 <br />$ 71,041.25 <br />$ 39.60 <br />$ 69,894.00 <br />26 <br />2350.501 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIL (C) <br />549 <br />TN <br />$ 39.00 <br />$ 21,411.00 <br />$ 47.00 <br />$ 25,803.00 <br />$ 48.60 <br />$ 26,681.40 <br />27 <br />2350.502 <br />TYPE LV 3 NON - WEARING COURSE MIXTURE FOR STREET (C) <br />1,765 <br />TN <br />$ 35.00 <br />$ 61,775.00 <br />$ 39.25 <br />$ 69,276.25 <br />$ 38.90 <br />$ 68,658.50 <br />28 <br />2350.503 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR DRIVEWAYS (C) (2" THICK) <br />291 <br />SY <br />$ 15.00 <br />$ 4,365.00 <br />$ 11.50 <br />$ 3346.50 <br />$ 1028 <br />$ 2,991.48 <br />29 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />685 <br />GAL <br />$ 2.00 <br />$ 1370.00 <br />$ 130 <br />$ 1,027.50 <br />$ 125 <br />$ 856.25 <br />30 <br />2451.609 <br />1.5" CRUSHED ROCK (TRENCH STABILIZATION) <br />77 <br />TN <br />$ 9.00 <br />$ 693.00 <br />$ 26.50 <br />$ 2,040.50 <br />$ 50.00 <br />$ 3,850.00 <br />31 <br />2501.515 <br />15" RC PIPE APRON W/ TRASH GUARD <br />8 <br />EA <br />$ 800.00 <br />$ 6,400.00 <br />$ 1,175.00 <br />$ 9,400.00 <br />$ 770.00 <br />$ 6,160.00 <br />32 <br />2501.515 <br />18" RC PIPE APRON W/ TRASH GUARD <br />4 <br />EA <br />$ 900.00 <br />$ 3,600.00 <br />$ 1,230.00 <br />$ 4,920.00 <br />$ 875.00 <br />$ 3,500.00 <br />33 <br />2501.515 <br />21" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,560.00 <br />$ 1,560.00 <br />$ 1,225.00 <br />$ 1,225.00 <br />34 <br />2501.515 <br />27" RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 1,100.00 <br />$ 1,100.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,750.00 <br />$ 1,750.00 <br />35 <br />2502.602 <br />10" PVC CLEANOUT INCL. CASTING ASSEMBLY <br />4 <br />EA <br />$ 400.00 <br />$ 1,600.00 <br />$ 470.00 <br />$ 1,880.00 <br />$ 620.00 <br />$ 2,480.00 <br />36 <br />2502.602 <br />12" PVC CLEANOUT INCL. CASTING ASSEMBLY <br />1 <br />EA <br />$ 450.00 <br />$ 450.00 <br />$ 630.00 <br />$ 630.00 <br />$ 775.00 <br />$ 775.00 <br />37 <br />2503.511 <br />10" PVC PIPE SEWER, SDR26 <br />928 <br />LF <br />$ 25.00 <br />$ 23,200.00 <br />$ 13.50 <br />$ 12,528.00 <br />$ 20.60 <br />$ 19,116.80 <br />38 <br />2503.511 <br />12" PVC PIPE SEWER, SDR26 <br />162 <br />LF <br />$ 27.00 <br />$ 4,374.00 <br />$ 16.75 <br />$ 2,713.50 <br />$ 25.75 <br />$ 4,171.50 <br />39 <br />2503.541 <br />15" RC PIPE SEWER, DESIGN 3006 CLASS V <br />508 <br />LF <br />$ 25.00 <br />$ 12,700.00 <br />$ 18.80 <br />$ 9,550.40 <br />$ 27.80 <br />$ 14,122.40 <br />40 <br />2503.541 <br />18" RC PIPE SEWER, DESIGN 3006 CLASS V <br />635.00 <br />LF <br />$ 27.00 <br />$ 17,145.00 <br />$ 21.00 <br />$ 13,335.00 <br />$ 32.00 <br />$ 20,320.00 <br />41 <br />2503.541 <br />21" RC PIPE SEWER, DESIGN 3006 CLASS III <br />60 <br />LF <br />$ 29.00 <br />$ 1,740.00 <br />$ 23.50 <br />$ 1,410.00 <br />$ 42.00 <br />$ 2,520.00 <br />42 <br />2503.541 <br />27" RC PIPE SEWER, DESIGN 3006 CLASSIII <br />35 <br />LF <br />$ 32.00 <br />$ 1,120.00 <br />$ 32.80 <br />$ 1,148.00 <br />$ 52.00 <br />$ 1,820.00 <br />43 <br />2504.602 <br />ADJUST VALVE BOX <br />4 <br />EA <br />$ 250.00 <br />$ 1,000.00 <br />$ 110.00 <br />$ 440.00 <br />$ 300.00 <br />$ 1,200.00 <br />44 <br />2504.602 <br />CONNECT TO EXISTING WATERMAIN <br />1 <br />EA <br />$ 900.00 <br />$ 900.00 <br />$ 1,050.00 <br />$ 1,050.00 <br />$ 1,540.00 <br />$ 1,540.00 <br />