Laserfiche WebLink
TABULON OF BIDS <br />HOLLY DRIVE IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />S.A.P. 210- 109 -02 <br />TKDA COMMISSION NO 12623 -02 <br />BIDS OPENED: JULY 15, 2004, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ESTIMATE W.B. MILLER, INC. <br />ITEM MN/DOT UNIT TOTAL UNIT TOTAL <br />NO. SPEC. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />���� <br />ENGINEERS • ARCHITECTS • PLANNERS <br />ARNT CONSTRUCTION CO. <br />UNIT TOTAL <br />PRICE AMOUNT <br />HOLLY DRIVE IMPROVEMENTS <br />45 <br />2504.602 <br />RELOCATE HYDRANT AND GATE VALVE <br />1 <br />EA <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 1,260.00 <br />$ 1,260.00 <br />$ 2,060.00 <br />$ 2,060.00 <br />46 <br />2504.602 <br />HYDRANT <br />1 <br />EA <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 1,960.00 <br />$ 1,960.00 <br />47 <br />2504.602 <br />6" GATE VALVE & BOX <br />1 <br />EA <br />$ 800.00 <br />$ 800.00 <br />$ 500.00 <br />$ 500.00 <br />$ 720.00 <br />$ 720.00 <br />48 <br />2504.602 <br />16° GATE VALVE & BOX <br />1 <br />EA <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 3,650.00 <br />$ 3,650.00 <br />$ 5,200.00 <br />$ 5,200.00 <br />49 <br />2504.603 <br />6" WATERMAIN DUCTILE IRON, CL. 52 <br />2 <br />LF <br />$ 26.00 <br />$ 52.00 <br />$ 52.00 <br />$ 104.00 <br />$ 58.00 <br />$ 116.00 <br />50 <br />2504.603 <br />16" WATERMAIN DUCTILE IRON, CL.52 <br />332 <br />LF <br />$ 50.00 <br />$ 16,600.00 <br />$ 42.00 <br />$ 13,944.00 <br />$ 46.40 <br />$ 15,404.80 <br />51 <br />2504.604 <br />4" POLYSTYRENE INSULATION <br />25 <br />SY <br />$ 24.00 <br />$ 600.00 <br />$ 15.50 <br />$ 387.50 <br />$ 32.00 <br />$ 800.00 <br />52 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />643 <br />LB <br />$ 4.00 <br />$ 2,572.00 <br />$ 1.30 <br />$ 835.90 <br />$ 3.00 <br />$ 1,929.00 <br />53 <br />2506.502 <br />CONSTRUCT CATCH BASIN, TYPE 402 OVER EXIST. 15 "RCP <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,730.00 <br />$ 2,730.00 <br />54 <br />2506.502 <br />CONSTRUCT CATCH BASIN, TYPE 402 <br />10 <br />EA <br />$ 1,300.00 <br />$ 13,000.00 <br />$ 1,375.00 <br />$ 13,750.00 <br />$ 1,700.00 <br />$ 17,000.00 <br />55 <br />2506.502 <br />CONSTRUCT SLOTTED VANE DRAIN <br />8 <br />EA <br />$ 2,500.00 <br />$ 20,000.00 <br />$ 1,200.00 <br />$ 9,600.00 <br />$ 1,040.00 <br />$ 8,320.00 <br />56 <br />2506.502 <br />CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE, TYPE <br />406 <br />6 <br />EA <br />$ 1,500.00 <br />$ 9,000.00 <br />$ 1,525.00 <br />$ 9,150.00 <br />$ 1,800.00 <br />$ 10,800.00 <br />57 <br />2506.502 <br />CONSTRUCT 48" DIAMETER MANHOLE, TYPE 409 <br />2 <br />EA <br />$ 1,400.00 <br />$ 2,800.00 <br />$ 1,400.00 <br />$ 2,800.00 <br />$ 1,800.00 <br />$ 3,600.00 <br />58 <br />2506.502 <br />CONSTRUCT 48" DIAMETER MANHOLE, TYPE OUTFALL <br />1 <br />EA <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 1,575.00 <br />$ 1,575.00 <br />$ 3,290.00 <br />$ 3,290.00 <br />59 <br />2506.502 <br />CONSTRUCT 72" DIAMETER MANHOLE, TYPE 409 <br />2 <br />EA <br />$ 1,700.00 <br />$ 3,400.00 <br />$ 3,200.00 <br />$ 6,400.00 <br />$ 4,600.00 <br />$ 9,200.00 <br />60 <br />2506.502 <br />CONSTRUCT 96° DIAMETER MANHOLE, TYPE ST <br />5.00 <br />EA <br />$ 6,000.00 <br />$ 30,000.00 <br />$ 5,000.00 <br />$ 25,000.00 <br />$ 9,200.00 <br />$ 46,000.00 <br />61 <br />2506.522 <br />ADJUST FRAME AND RING CASTING (CB OR MH) <br />6 <br />EA <br />$ 300.00 <br />$ 1,800.00 <br />$ 275.00 <br />$ 1,650.00 <br />$ 500.00 <br />$ 3,000.00 <br />62 <br />2506.602 <br />RECONSTRUCT EXISTING MANHOLE <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 650.00 <br />$ 650.00 <br />$ 1,600.00 <br />$ 1,600.00 <br />63 <br />2511.501 <br />RANDOM RIPRAP CLASS 111 <br />54 <br />CY <br />$ 75.00 <br />$ 4,050.00 <br />$ 85.00 <br />$ 4,590.00 <br />$ 94.00 <br />$ 5,076.00 <br />64 <br />2521,501 <br />4" CONCRETE WALK <br />1,543 <br />SF <br />$ 10.00 <br />$ 15,430.00 <br />$ 3.10 <br />$ 4,783.30 <br />$ 3.60 <br />$ 5,554.80 <br />65 <br />2531.501 <br />CONCRETE CURB AND GUTTER DESIGN 8418 <br />7,328 <br />LF <br />$ 9.00 <br />$ 65,952.00 <br />$ 7.85 <br />$ 57,524.80 <br />$ 7.90 <br />$ 57,891.20 <br />66 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />100 <br />SY <br />$ 34.00 <br />$ 3,400.00 <br />$ 37.00 <br />$ 3,700.00 <br />$ 42.00 <br />$ 4,200.00 <br />67 <br />2531.618 <br />TRUNCATED DOME <br />256 <br />SF <br />$ 15.00 <br />$ 3,840.00 <br />$ 12.00 <br />$ 3,072.00 <br />$ 21.00 <br />$ 5,376.00 <br />* <br />68 <br />2540.602 <br />MAIL BOX SUPPORT <br />5 <br />EA <br />$ 125.00 <br />$ 625.00 <br />$ 95.00 <br />$ 475.00 <br />$ 100.00 <br />$ 500.00 <br />69 <br />2563.601 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 3,800.00 <br />$ 3,800.00 <br />70 <br />2564.531 <br />SIGN PANELS TYPE C (F &I) <br />94 <br />SF <br />$ 25.00 <br />$ 2,350.00 <br />$ 23.00 <br />$ 2,162.00 <br />$ 20.00 <br />$ 1,880.00 <br />71 <br />2564.531 <br />SIGN PANELS TYPE D (F &I) <br />17 <br />SF <br />$ 30.00 <br />$ 510.00 <br />$ 30.00 <br />$ 510.00 <br />$ 18.00 <br />$ 306.00 <br />72 <br />2564.536 <br />INSTALL SALVAGED SIGN (INCL. POST & ASSEMBLY) <br />11 <br />EA <br />$ 80.00 <br />$ 880.00 <br />$ 100.00 <br />$ 1,100.00 <br />$ 50.00 <br />$ 550.00 <br />73 <br />2564.603 <br />PVMT MARK. 24" STOP LINE WHITE, POLY PREFORMED <br />142 <br />LF <br />$ 20.00 <br />$ 2,840.00 <br />$ 15.25 <br />$ 2,165.50 <br />$ 15.30 <br />$ 2,172.60 <br />74 <br />2564.603 <br />PVMT MARK. 4" DOUBLE SOLID LINE YELLOW, PAINT <br />3,900 <br />LF <br />$ 0.20 <br />$ 780.00 <br />$ - 0.35 <br />$ 1,365.00 <br />$ 0.34 <br />$ 1,326.00 <br />75 <br />2564.618 <br />ZEBRA CROSSWALK WHITE, POLY PREFORMED <br />288 <br />SF <br />$ 7.00 <br />$ 2,016.00 <br />$ 14.00 <br />$ 4,032.00 <br />$ 14.00 <br />$ 4,032.00 <br />76 <br />2571.502 <br />DECIDUOUS TREE (2" CAL, B &B) (HACKBERRY) <br />30 <br />TR <br />$ 350.00 <br />$ 10,500.00 <br />$ 285.00 <br />$ 8,550.00 <br />$ 312.00 <br />$ 9,360.00 <br />77 <br />2571.502 <br />DECIDUOUS TREE (2" CAL, B &B) (RED OAK) <br />30 <br />TR <br />$ 350.00 <br />$ 10,500.00 <br />$ 285.00 <br />$ 8,550.00 <br />$ 312.00 <br />$ 9,360.00 <br />78 <br />2571.502 <br />DECIDUOUS TREE (2" CAL, B &B) (SUGAR MAPLE) <br />30 <br />TR <br />$ 350.00 <br />$ 10,500.00 <br />$ 285.00 <br />$ 8,550.00 <br />$ 312.00 <br />$ 9,360.00 <br />79 <br />2573.502 <br />SILT FENCE, TYPE PREASSEMBLED <br />4,360 <br />LF <br />$ 3.00 <br />$ 13,080.00 <br />$ 2.25 <br />$ 9,810.00 <br />$ 1.50 <br />$ 6,540.00 <br />80 <br />2573.602 <br />STORM SEWER INLET PROTECTION <br />28.00 <br />EA <br />$ 100.00 <br />$ 2,800.00 <br />$ 110.00 <br />$ 3,080.00 <br />$ 20.00 <br />$- 560.00 <br />81 <br />2573.602 <br />HAY BALE DITCH CHECK <br />90 <br />LF <br />$ 3.00 <br />$ 270.00 <br />$ 5.25 <br />$ 472.50 <br />$ 6.00 <br />$ 540.00 <br />82 <br />2575.505 <br />SODDING TYPE SALT RESISTANT <br />11,490 <br />SY <br />$ 3.00 <br />$ 34,470.00 <br />$ 2.35 <br />$ 27,001.50 <br />$ 2.80 <br />$ 32,172.00 <br />83 <br />2575.604 <br />EROSION CONTROL BLANKET, CATEGORY 1 (WOOD FIBER <br />BLANKET) <br />3,809 <br />SY <br />$ 2.00 <br />$ 7,618.00 <br />$ 1.60 <br />$ 6,094.40 <br />$ 2.00 <br />$ 7,618.00 <br />84 <br />2575.605 <br />SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH & <br />DISC ANCHORING) <br />ACRE <br />$ 1,200.00 <br />$ <br />$ 3,000.00 <br />$ <br />$ 1,800.00 <br />$ - <br />TOTAL BID AMOUNT <br />$ 911,004.00 <br />$ 824,186.70 <br />$ 856,275.56 <br />