TABULON OF BIDS
<br />HOLLY DRIVE IMPROVEMENTS
<br />CITY OF LINO LAKES, MINNESOTA
<br />S.A.P. 210- 109 -02
<br />TKDA COMMISSION NO 12623 -02
<br />BIDS OPENED: JULY 15, 2004, AT 10:00 AM
<br />*DENOTES ERROR IN BIDDERS CALCULATION FOREST LAKE
<br />CENTRAL LANDSCAPING CONTRACTING
<br />ITEM MN /DOT UNIT TOTAL UNIT TOTAL
<br />NO. SPEC. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
<br />MI
<br />TKDA
<br />ENGINEERS • ARCHITECTS • PLANNERS
<br />THREE RIVERS
<br />CONSTRUCTION
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />HOLLY DRIVE IMPROVEMENTS
<br />45
<br />2504.602
<br />RELOCATE HYDRANT AND GATE VALVE
<br />1
<br />EA
<br />$ 1,150.00
<br />$ 1,150.00
<br />$ 3,500.00
<br />$ 3,500.00
<br />$ 920.00
<br />$ 920.00
<br />46
<br />2504.602
<br />HYDRANT
<br />1
<br />EA
<br />$ 1,760.00
<br />$ 1,760.00
<br />$ 3,500.00
<br />$ 3,500.00
<br />$ 1,946.00
<br />$ 1,946.00
<br />47
<br />2504.602
<br />6" GATE VALVE & BOX
<br />1
<br />EA
<br />$ 925.00
<br />$ 925.00
<br />$ 800.00
<br />$ 800.00
<br />$ 576.00
<br />$ 576.00
<br />48
<br />2504.602
<br />16" GATE VALVE & BOX
<br />1
<br />EA
<br />$ 3,450.00
<br />$ 3,450.00
<br />$ 2,700.00
<br />$ 2,700.00
<br />$ 4,048.00
<br />$ 4,048.00
<br />49
<br />2504.603
<br />6" WATERMAIN DUCTILE IRON, CL. 52
<br />2
<br />LF
<br />$ 38.50
<br />$ 77.00
<br />$ 120.00
<br />$ 240.00
<br />$ 140.00
<br />$ 280.00
<br />50
<br />2504.603
<br />16" WATERMAIN DUCTILE IRON, CL.52
<br />332
<br />LF
<br />$ 48.50
<br />$ 16,102.00
<br />$ 50.00
<br />$ 16,600.00
<br />$ 56.00
<br />$ 18,592.00
<br />51
<br />2504.604
<br />4" POLYSTYRENE INSULATION
<br />25
<br />SY
<br />$ 31.00
<br />$ 775.00
<br />$ 30.00
<br />$ 750.00
<br />$ 18.00
<br />$ 450.00
<br />52
<br />2504.608
<br />DUCTILE IRON FITTINGS
<br />643
<br />LB
<br />$ 4.10
<br />$ 2,636.30
<br />$ 2.00
<br />$ 1,286.00
<br />$ 5.00
<br />$ 3,215.00
<br />53
<br />2506.502
<br />CONSTRUCT CATCH BASIN, TYPE 402 OVER EXIST. 15 "RCP
<br />1
<br />EA
<br />$ 1,800.00
<br />$ 1,800.00
<br />$ 1,800.00
<br />$ 1,800.00
<br />$ 1,588.00
<br />$ 1,588.00
<br />54
<br />2506.502
<br />CONSTRUCT CATCH BASIN, TYPE 402
<br />10
<br />EA
<br />$ 1,700.00
<br />$ 17,000.00
<br />*
<br />$ 1,300.00
<br />$ 13,000.00
<br />$ 1,428.00
<br />$ 14,280.00
<br />55
<br />2506.502
<br />CONSTRUCT SLOTTED VANE DRAIN
<br />8
<br />EA
<br />$ 1,510.00
<br />$ 12,080.00
<br />$ 1,300.00
<br />$ 10,400.00
<br />$ 3,900.00
<br />$ 31,200.00
<br />56
<br />2506.502
<br />CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE, TYPE
<br />406
<br />6
<br />EA
<br />$ 1,850.00
<br />$ 11,100.00
<br />$ 1,800.00
<br />$ 10,800.00
<br />$ 1,704.00
<br />$ 10,224.00
<br />57
<br />2506.502
<br />CONSTRUCT 48" DIAMETER MANHOLE, TYPE 409
<br />2
<br />EA
<br />$ 1,810.00
<br />$ 3,620.00
<br />$ 1,800.00
<br />$ 3,600.00
<br />$ 1,704.00
<br />$ 3,408.00
<br />58
<br />2506.502
<br />CONSTRUCT 48" DIAMETER MANHOLE, TYPE OUTFALL
<br />1
<br />EA
<br />$ 3,370.00
<br />$ 3,370.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 2,400.00
<br />$ 2,400.00
<br />59
<br />2506.502
<br />CONSTRUCT 72" DIAMETER MANHOLE, TYPE 409
<br />2
<br />EA
<br />$ 3,250.00
<br />$ 6,500.00
<br />$ 3,200.00
<br />$ 6,400.00
<br />$ 3,264.00
<br />$ 6,528.00
<br />60
<br />2506.502
<br />CONSTRUCT 96" DIAMETER MANHOLE, TYPE ST
<br />5.00
<br />EA
<br />$ 7,600.00
<br />$ 38,000.00
<br />$ 8,000.00
<br />$ 40,000.00
<br />$ 6,638.00
<br />$ 33,190.00
<br />61
<br />2506.522
<br />ADJUST FRAME AND RING CASTING (CB OR MH)
<br />6
<br />EA
<br />$ 195.00
<br />$ 1,170.00
<br />$ 400.00
<br />$ 2,400.00
<br />$ 232.00
<br />$ 1,392.00
<br />62
<br />2506.602
<br />RECONSTRUCT EXISTING MANHOLE
<br />1
<br />EA
<br />$ 800.00
<br />$ 800.00
<br />$ 1,000.00
<br />$ 1,000.00
<br />$ 2,036.00
<br />$ 2,036.00
<br />63
<br />2511.501
<br />RANDOM RIPRAP CLASS III
<br />54
<br />CY
<br />$ 92.00
<br />$ 4,968.00
<br />$ 80.00
<br />$ 4,320.00
<br />$ 48.00
<br />$ 2,592.00
<br />64
<br />2521.501
<br />4" CONCRETE WALK
<br />1,543
<br />SF
<br />$ 2.90
<br />$ 4,474.70
<br />$ 3.00
<br />$ 4,629.00
<br />$ 4.00
<br />$ 6,172.00
<br />65
<br />2531.501
<br />CONCRETE CURB AND GUTTER DESIGN B418
<br />7,328
<br />LF
<br />$ 8.20
<br />$ 60,089.60
<br />$ 7.50
<br />$ 54,960.00
<br />$ 8.20
<br />$ 60,089.60
<br />66
<br />2531.507
<br />6° CONCRETE DRIVEWAY PAVEMENT
<br />100
<br />SY
<br />$ 36.00
<br />$ 3,600.00
<br />$ 34.00
<br />$ 3,400.00
<br />$ 42.60
<br />$ 4,260.00
<br />67
<br />2531.618
<br />TRUNCATED DOME
<br />256
<br />SF
<br />$ 30.00
<br />$ 7,680.00
<br />$ 26.00
<br />$ 6,656.00
<br />$ 6.05
<br />$ 1,548.80
<br />68
<br />2540.602
<br />MAIL BOX SUPPORT
<br />5
<br />EA
<br />$ 295.00
<br />$ 1,475.00
<br />$ 150.00
<br />$ 750.00
<br />$ 71.50
<br />$ 357.50
<br />69
<br />2563.601
<br />TRAFFIC CONTROL
<br />1
<br />LS
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 2,200.00
<br />$ 2,200.00
<br />$ 2,420.00
<br />$ 2,420.00
<br />70
<br />2564.531
<br />SIGN PANELS TYPE C (F &I)
<br />94
<br />SF
<br />$ 28.00
<br />$ 2,632.00
<br />$ 23.00
<br />$ 2,162.00
<br />$ 24.75
<br />$ 2,326.50
<br />71
<br />2564.531
<br />SIGN PANELS TYPED (F &I)
<br />17
<br />SF
<br />$ 35.00
<br />$ 595.00
<br />$ 30.00
<br />$ 510.00
<br />$ 32.45
<br />$ 551.65
<br />72
<br />2564.536
<br />INSTALL SALVAGED SIGN (INCL. POST & ASSEMBLY)
<br />11
<br />EA
<br />$ 145.00
<br />$ 1,595.00
<br />$ 95.00
<br />$ 1,045.00
<br />$ 104.50
<br />$ 1,149.50
<br />73
<br />2564.603
<br />PVMT MARK. 24" STOP LINE WHITE, POLY PREFORMED
<br />142
<br />LF
<br />$ 9.00
<br />$ 1,278.00
<br />$ 15.00
<br />$ 2,130.00
<br />$ 16.40
<br />$ 2,328.80
<br />74
<br />2564.603
<br />PVMT MARK. 4" DOUBLE SOLID LINE YELLOW, PAINT
<br />3,900
<br />LF
<br />$ 1.00
<br />$ 3,900.00
<br />$ 0.33
<br />$ 1,287.00
<br />$ 0.40
<br />$ 1,560.00
<br />75
<br />2564.618
<br />ZEBRA CROSSWALK WHITE, POLY PREFORMED
<br />288
<br />SF
<br />$ 5.00
<br />$ 1,440.00
<br />$ 14.00
<br />$ 4,032.00
<br />$ 14.73
<br />$ 4,242.24
<br />76
<br />2571.502
<br />DECIDUOUS TREE (2" CAL, B &B) (HACKBERRY)
<br />30
<br />TR
<br />$ 400.00
<br />$ 12,000.00
<br />$ 225.00
<br />$ 6,750.00
<br />$ 440.00
<br />$ 13,200.00
<br />77
<br />2571.502
<br />DECIDUOUS TREE (2" CAL, B &B) (RED OAK)
<br />30
<br />TR
<br />$ 450.00
<br />$ 13,500.00
<br />$ 275.00
<br />$ 8,250.00
<br />$ 440.00
<br />$ 13,200.00
<br />78
<br />2571.502
<br />DECIDUOUS TREE (2" CAL, B &B) (SUGAR MAPLE)
<br />30
<br />TR
<br />$ 400.00
<br />$ 12,000.00
<br />$ 240.00
<br />$ 7,200.00
<br />$ 440.00
<br />$ 13,200.00
<br />79
<br />2573.502
<br />SILT FENCE, TYPE PREASSEMBLED
<br />4,360
<br />LF
<br />$ 2.00
<br />$ 8,720.00
<br />$ 2.00
<br />$ 8,720.00
<br />$ 1.80
<br />$ 7,848.00
<br />80
<br />2573.602
<br />STORM SEWER INLET PROTECTION
<br />28.00
<br />EA
<br />$ 75.00
<br />$ 2,100.00
<br />$ 40.00
<br />$ 1,120.00
<br />$ 192.50
<br />$ 5,390.00
<br />81
<br />2573.602
<br />HAY BALE DITCH CHECK
<br />90
<br />LF
<br />$ 3.00
<br />$ 270.00
<br />$ 4.00
<br />$ 360.00
<br />$ 13.20
<br />$ 1,188.00
<br />82
<br />2575.505
<br />SODDING TYPE SALT RESISTANT
<br />11,490
<br />SY
<br />$ 2.10
<br />$ 24,129.00
<br />$ 2.00
<br />$ 22,980.00
<br />$ 3.15
<br />$ 36,193.50
<br />83
<br />2575.604
<br />EROSION CONTROL BLANKET, CATEGORY 1 (WOOD FIBER
<br />BLANKET)
<br />3,809
<br />SY
<br />$ 1.10
<br />$ 4,189.90
<br />$ 130
<br />$ 4,951.70
<br />$ 1.40
<br />$ 5,332.60
<br />84
<br />2575.605
<br />SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH &
<br />DISC ANCHORING)
<br />ACRE
<br />$ 1300.00
<br />$
<br />$ 5,000.00
<br />$ -
<br />$ 2,420.00
<br />$
<br />TOTAL BID AMOUNT
<br />$ 926,219.05
<br />*
<br />$ 952,664.70
<br />*
<br />$ 968,701.37
<br />
|