TABULON OF BIDS
<br />OF LINO IMPROVEMENTS
<br />CITY HOLLY
<br />CITY OF LINO LAKES, MINNESOTA
<br />S.A.P. 210- 109-02
<br />TKDA COMMISSION NO 12623 -02
<br />BIDS OPENED: JULY 15, 2004, AT 10:00 AM
<br />*DENOTES ERROR IN BIDDERS CALCULATION
<br />DRESEL CONTRACTING JAY BROS., INC.
<br />ITEM MN/DOT UNIT TOTAL UNIT TOTAL
<br />NO. SPEC. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
<br />_1
<br />m���
<br />ENGINEERS • ARCHITECTS • PLANNERS
<br />GLENN REHBEIN
<br />EXCAVATING
<br />UNIT TOTAL
<br />PRICE AMOUNT
<br />HOLLY DRIVE IMPROVEMENTS
<br />1
<br />2011.602
<br />REMOVE & RESET EXISTING PROPERTY IRONS
<br />21
<br />EA
<br />$ 1,000.00
<br />$ 21,000.00
<br />$ 200.00
<br />$ 4,200.00
<br />$ 170.00
<br />$ 3,570.00
<br />2
<br />2021.501
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 27,000.00
<br />$ 27,000.00
<br />$ 37,065.00
<br />$ 37,065.00
<br />*
<br />$ 68,000.00
<br />$ 68,000.00
<br />3
<br />2101.502
<br />CLEARING
<br />200
<br />TR
<br />$ 75.00
<br />$ 15,000.00
<br />$ 150.00
<br />$ 30,000.00
<br />$ 165.00
<br />$ 33,000.00
<br />4
<br />2101.507
<br />GRUBBING
<br />215
<br />TR
<br />$ 50.00
<br />$ 10,750.00
<br />$ 175.00
<br />$ 37,625.00
<br />$ 88.00
<br />$ 18,920.00
<br />5
<br />2104.501
<br />REMOVE PIPE CULVERT (CMP,CPP)
<br />258
<br />LF
<br />$ 10.00
<br />$ 2,580.00
<br />$ 4.00
<br />$ 1,032.00
<br />$ 8.00
<br />$ 2,064.00
<br />6
<br />2104.501
<br />REMOVE PIPE CULVERT (RCP)
<br />308
<br />LF
<br />$ 10.00
<br />$ 3,080.00
<br />$ 6.00
<br />$ 1,848.00
<br />$ 9.00
<br />$ 2,772.00
<br />7
<br />2104.501
<br />REMOVE SEWER PIPE (STORM)
<br />39
<br />LF
<br />$ 15.00
<br />$ 585.00
<br />$ 9.00
<br />$ 351.00
<br />$ 9.00
<br />$ 351.00
<br />8
<br />2104.501
<br />REMOVE CONCRETE CURB & GUTTER
<br />154
<br />LF
<br />$ 5.00
<br />$ 770.00
<br />$ 7.00
<br />$ 1,078.00
<br />$ 4.00
<br />$ 616.00
<br />9
<br />2104.503
<br />REMOVE CONCRETE DRIVEWAY PAVEMENT
<br />772
<br />SF
<br />$ 4.00
<br />$ 3,088.00
<br />$ 0.75
<br />$ 579.00
<br />$ 2.00
<br />$ 1,544.00
<br />10
<br />2104.505
<br />REMOVE BITUMINOUS SURFACING (STREET & DRIVEWAY)
<br />11,527
<br />SY
<br />$ 2.50
<br />$ 28,817.50
<br />$ 3.00
<br />$ 34,581.00
<br />$ 1.50
<br />$ 17,290.50
<br />11
<br />2104.509
<br />REMOVE CATCH BASIN
<br />2
<br />EA
<br />$ 500.00
<br />$ 1,000.00
<br />$ 250.00
<br />$ 500.00
<br />$ 300.00
<br />$ 600.00
<br />12
<br />2104.511
<br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH)
<br />42
<br />LF
<br />$ 10.00
<br />$ 420.00
<br />$ 4.00
<br />$ 168.00
<br />$ 7.00
<br />$ 294.00
<br />13
<br />2104.513
<br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH)
<br />292
<br />LF
<br />$ 4.00
<br />$ 1,168.00
<br />$ 3.50
<br />$ 1,022.00
<br />$ 6.00
<br />$ 1,752.00
<br />14
<br />2104.521
<br />SALVAGE & REINSTALL WIRE FENCE
<br />130
<br />LF
<br />$ 10.00
<br />$ 1,300.00
<br />$ 20.00
<br />$ 2,600.00
<br />$ 3.00
<br />$ 390.00
<br />15
<br />2104.521
<br />SALVAGE & REINSTALL WOOD FENCE
<br />106
<br />LF
<br />$ 15.00
<br />$ 1,590.00
<br />$ 22.00
<br />$ 2,332.00
<br />$ 14.00
<br />$ 1,484.00
<br />16
<br />2104.523
<br />SALVAGE & RELOCATE MAIL BOX WITH SUPPORT
<br />5
<br />EA
<br />$ 115.00
<br />$ 575.00
<br />$ 105.00
<br />$ 525.00
<br />$ 110.00
<br />$ 550.00
<br />17
<br />2104.523
<br />SALVAGE SIGN (INCL. POST & ASSEMBLY)
<br />11
<br />EA
<br />$ 22.00
<br />$ 242.00
<br />$ 21.00
<br />$ 231.00
<br />$ 22.00
<br />$ 242.00
<br />18
<br />2105.501
<br />COMMON EXCAVATION (P)
<br />6,742
<br />CY
<br />$ 8.00
<br />$ 53,936.00
<br />$ 6.50
<br />$ 43,823.00
<br />$ 11.25
<br />$ 75,847.50
<br />19
<br />2105.501
<br />POND EXCAVATION (P)
<br />132
<br />CY
<br />$ 10.00
<br />$ 1,320.00
<br />$ 7.50
<br />$ 990.00
<br />$ 12.00
<br />$ 1,584.00
<br />20
<br />2105.507
<br />SUBGRADE EXCAVATION
<br />4,000.00
<br />CY
<br />$ 8.00
<br />$ 32,000.00
<br />$ 6.75
<br />$ 27,000.00
<br />$ 6.25
<br />$ 25,000.00
<br />21
<br />2105.522
<br />SELECT GRANULAR BORROW (CV)
<br />4,000
<br />CY
<br />$ 15.00
<br />$ 60,000.00
<br />$ 9.00
<br />$ 36,000.00
<br />$ 9.50
<br />$ 38,000.00
<br />22
<br />2105.525
<br />TOPSOIL BORROW (LV)
<br />1,036
<br />CY
<br />$ 15.00
<br />$ 15,540.00
<br />$ 9.00
<br />$ 9,324.00
<br />$ 12.00
<br />$ 12,432.00
<br />23
<br />2123.61
<br />EXPLORATORY DIGGING
<br />5
<br />HR
<br />$ 150.00
<br />$ 750.00
<br />$ 125.00
<br />$ 625.00
<br />$ 300.00
<br />$ 1,500.00
<br />24
<br />2211.501
<br />AGGREGATE BASE, CLASS 5 FOR STREET, TRAIL, &
<br />DRIVEWAY (100% CRUSHED)
<br />9,485
<br />TN
<br />$ 14.00
<br />$ 132,790.00
<br />$ 15.00
<br />$ 142,275.00
<br />$ 11.00
<br />$ 104,335.00
<br />25
<br />2350.501
<br />TYPE LV 4 WEARING COURSE MIXTURE FOR STREET (C)
<br />1,765
<br />TN
<br />$ 39.65
<br />$ 69,982.25
<br />$ 42.40
<br />$ 74,836.00
<br />$ 42.00
<br />$ 74,130.00
<br />26
<br />2350.501
<br />TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIL (C)
<br />549
<br />TN
<br />$ 48.40
<br />$ 26,571.60
<br />$ 56.17
<br />$ 30,837.33
<br />$ 53.50
<br />$ 29,371.50
<br />27
<br />2350.502
<br />TYPE LV 3 NON - WEARING COURSE MIXTURE FOR STREET (C)
<br />1,765
<br />TN
<br />$ 39.00
<br />$ 68,835.00
<br />$ 40.34
<br />$ 71,200.10
<br />$ 41.50
<br />$ 73,247.50
<br />28
<br />2350.503
<br />TYPE LV 4 WEARING COURSE MIXTURE FOR DRIVEWAYS (C)
<br />(2" THICK)
<br />291
<br />SY
<br />$ 12.50
<br />$ 3,637.50
<br />$ 14.17
<br />$ 4,123.47
<br />$ 1100
<br />$ 3,492.00
<br />29
<br />2357.502
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />685
<br />GAL
<br />$ 1.50
<br />$ 1,027.50
<br />$ 1.32
<br />$ 904.20
<br />$ 1.40
<br />$ 959.00
<br />30
<br />2451.609
<br />1.5" CRUSHED ROCK (TRENCH STABILIZATION)
<br />77
<br />TN
<br />$ 25.00
<br />$ 1,925.00
<br />$ 20.00
<br />$ 1,540.00
<br />$ 30.00
<br />$ 2,310.00
<br />31
<br />2501.515
<br />15' RC PIPE APRON W/ TRASH GUARD
<br />8
<br />EA
<br />$ 850.00
<br />$ 6,800.00
<br />$ 745.50
<br />$ 5,964.00
<br />$ 748.00
<br />$ 5,984.00
<br />32
<br />2501.515
<br />18" RC PIPE APRON W/ TRASH GUARD
<br />4
<br />EA
<br />$ 950.00
<br />$ 3,800.00
<br />$ 798.00
<br />$ 3,192.00
<br />$ 863.00
<br />$ 3,452.00
<br />33
<br />2501.515
<br />21' RC PIPE APRON W/ TRASH GUARD
<br />1
<br />EA
<br />$ 1,250.00
<br />$ 1,250.00
<br />$ 1,008.00
<br />$ 1,008.00
<br />$ 978.00
<br />$ 978.00
<br />34
<br />2501.515
<br />27' RC PIPE APRON W/ TRASH GUARD
<br />1
<br />EA
<br />$ 1,500.00
<br />$' 1,500.00
<br />$ 1,365.00
<br />$ 1,365.00
<br />$ 1,323.00
<br />$ 1,323.00
<br />35
<br />2502.602
<br />10" PVC CLEANOUT INCL. CASTING ASSEMBLY
<br />4
<br />EA
<br />$ 650.00
<br />$ 2,600.00
<br />$ 525.00
<br />$ 2,100.00
<br />$ 460.00
<br />$ 1,840.00
<br />36
<br />2502.602
<br />12" PVC CLEANOUT INCL. CASTING ASSEMBLY
<br />1
<br />EA
<br />$ 750.00
<br />$ 750.00
<br />$ 588.00
<br />$ 588.00
<br />$ 520.00
<br />$ 520.00
<br />37
<br />2503.511
<br />10" PVC PIPE SEWER, SDR26
<br />928
<br />LF
<br />$ 30.00
<br />$ 27,840.00
<br />$ 24.15
<br />$ 22,411.20
<br />$ 23.50
<br />$ 21,808.00
<br />38
<br />2503.511
<br />12" PVC PIPE SEWER, SDR26
<br />162
<br />LF
<br />$ 35.00
<br />$ 5,670.00
<br />$ 27.30
<br />$ 4,422.60
<br />$ 26.50
<br />$ 4,293.00
<br />39
<br />2503.541
<br />15" RC PIPE SEWER, DESIGN 3006 CLASS V
<br />508
<br />LF
<br />$ 25.00
<br />$ 12,700.00
<br />$ 30.45
<br />$ 15,468.60
<br />$ 29.00
<br />$ 14,732.00
<br />40
<br />2503.541
<br />18" RC PIPE SEWER, DESIGN 3006 CLASS V
<br />635.00
<br />LF
<br />$ 28.50
<br />$ 18,097.50
<br />$ 33.60
<br />$ 21,336.00
<br />$ 31.00
<br />$ 19,685.00
<br />41
<br />2503.541
<br />21" RC PIPE SEWER, DESIGN 3006 CLASS III
<br />60
<br />LF
<br />$ 31.00
<br />$ 1,860.00
<br />$ 37.80
<br />$ 2,268.00
<br />$ 33.50
<br />$ 2,010.00
<br />42
<br />2503.541
<br />27" RC PIPE SEWER, DESIGN 3006 CLASSIII
<br />35
<br />LF
<br />$ 38.00
<br />$ 1,330.00
<br />$ 47.25
<br />$ 1,653.75
<br />$ 42.50
<br />$ 1,487.50
<br />43
<br />2504.602
<br />ADJUST VALVE BOX
<br />4
<br />EA
<br />$ 350.00
<br />$ 1,400.00
<br />$ 241.50
<br />$ 966.00
<br />$ 230.00
<br />$ 920.00
<br />44
<br />2504.602
<br />CONNECT TO EXISTING WATERMAIN
<br />1
<br />EA
<br />$ 750.00
<br />$ 750.00
<br />$ 1,785.00
<br />$ 1,785.00
<br />$ 1,150.00
<br />$ 1,150.00
<br />
|