Laserfiche WebLink
TABULON OF BIDS <br />OF LINO IMPROVEMENTS <br />CITY HOLLY <br />CITY OF LINO LAKES, MINNESOTA <br />S.A.P. 210- 109-02 <br />TKDA COMMISSION NO 12623 -02 <br />BIDS OPENED: JULY 15, 2004, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />DRESEL CONTRACTING JAY BROS., INC. <br />ITEM MN/DOT UNIT TOTAL UNIT TOTAL <br />NO. SPEC. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />_1 <br />m��� <br />ENGINEERS • ARCHITECTS • PLANNERS <br />GLENN REHBEIN <br />EXCAVATING <br />UNIT TOTAL <br />PRICE AMOUNT <br />HOLLY DRIVE IMPROVEMENTS <br />1 <br />2011.602 <br />REMOVE & RESET EXISTING PROPERTY IRONS <br />21 <br />EA <br />$ 1,000.00 <br />$ 21,000.00 <br />$ 200.00 <br />$ 4,200.00 <br />$ 170.00 <br />$ 3,570.00 <br />2 <br />2021.501 <br />MOBILIZATION <br />1 <br />LS <br />$ 27,000.00 <br />$ 27,000.00 <br />$ 37,065.00 <br />$ 37,065.00 <br />* <br />$ 68,000.00 <br />$ 68,000.00 <br />3 <br />2101.502 <br />CLEARING <br />200 <br />TR <br />$ 75.00 <br />$ 15,000.00 <br />$ 150.00 <br />$ 30,000.00 <br />$ 165.00 <br />$ 33,000.00 <br />4 <br />2101.507 <br />GRUBBING <br />215 <br />TR <br />$ 50.00 <br />$ 10,750.00 <br />$ 175.00 <br />$ 37,625.00 <br />$ 88.00 <br />$ 18,920.00 <br />5 <br />2104.501 <br />REMOVE PIPE CULVERT (CMP,CPP) <br />258 <br />LF <br />$ 10.00 <br />$ 2,580.00 <br />$ 4.00 <br />$ 1,032.00 <br />$ 8.00 <br />$ 2,064.00 <br />6 <br />2104.501 <br />REMOVE PIPE CULVERT (RCP) <br />308 <br />LF <br />$ 10.00 <br />$ 3,080.00 <br />$ 6.00 <br />$ 1,848.00 <br />$ 9.00 <br />$ 2,772.00 <br />7 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />39 <br />LF <br />$ 15.00 <br />$ 585.00 <br />$ 9.00 <br />$ 351.00 <br />$ 9.00 <br />$ 351.00 <br />8 <br />2104.501 <br />REMOVE CONCRETE CURB & GUTTER <br />154 <br />LF <br />$ 5.00 <br />$ 770.00 <br />$ 7.00 <br />$ 1,078.00 <br />$ 4.00 <br />$ 616.00 <br />9 <br />2104.503 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />772 <br />SF <br />$ 4.00 <br />$ 3,088.00 <br />$ 0.75 <br />$ 579.00 <br />$ 2.00 <br />$ 1,544.00 <br />10 <br />2104.505 <br />REMOVE BITUMINOUS SURFACING (STREET & DRIVEWAY) <br />11,527 <br />SY <br />$ 2.50 <br />$ 28,817.50 <br />$ 3.00 <br />$ 34,581.00 <br />$ 1.50 <br />$ 17,290.50 <br />11 <br />2104.509 <br />REMOVE CATCH BASIN <br />2 <br />EA <br />$ 500.00 <br />$ 1,000.00 <br />$ 250.00 <br />$ 500.00 <br />$ 300.00 <br />$ 600.00 <br />12 <br />2104.511 <br />SAWCUT CONCRETE PAVEMENT (FULL DEPTH) <br />42 <br />LF <br />$ 10.00 <br />$ 420.00 <br />$ 4.00 <br />$ 168.00 <br />$ 7.00 <br />$ 294.00 <br />13 <br />2104.513 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />292 <br />LF <br />$ 4.00 <br />$ 1,168.00 <br />$ 3.50 <br />$ 1,022.00 <br />$ 6.00 <br />$ 1,752.00 <br />14 <br />2104.521 <br />SALVAGE & REINSTALL WIRE FENCE <br />130 <br />LF <br />$ 10.00 <br />$ 1,300.00 <br />$ 20.00 <br />$ 2,600.00 <br />$ 3.00 <br />$ 390.00 <br />15 <br />2104.521 <br />SALVAGE & REINSTALL WOOD FENCE <br />106 <br />LF <br />$ 15.00 <br />$ 1,590.00 <br />$ 22.00 <br />$ 2,332.00 <br />$ 14.00 <br />$ 1,484.00 <br />16 <br />2104.523 <br />SALVAGE & RELOCATE MAIL BOX WITH SUPPORT <br />5 <br />EA <br />$ 115.00 <br />$ 575.00 <br />$ 105.00 <br />$ 525.00 <br />$ 110.00 <br />$ 550.00 <br />17 <br />2104.523 <br />SALVAGE SIGN (INCL. POST & ASSEMBLY) <br />11 <br />EA <br />$ 22.00 <br />$ 242.00 <br />$ 21.00 <br />$ 231.00 <br />$ 22.00 <br />$ 242.00 <br />18 <br />2105.501 <br />COMMON EXCAVATION (P) <br />6,742 <br />CY <br />$ 8.00 <br />$ 53,936.00 <br />$ 6.50 <br />$ 43,823.00 <br />$ 11.25 <br />$ 75,847.50 <br />19 <br />2105.501 <br />POND EXCAVATION (P) <br />132 <br />CY <br />$ 10.00 <br />$ 1,320.00 <br />$ 7.50 <br />$ 990.00 <br />$ 12.00 <br />$ 1,584.00 <br />20 <br />2105.507 <br />SUBGRADE EXCAVATION <br />4,000.00 <br />CY <br />$ 8.00 <br />$ 32,000.00 <br />$ 6.75 <br />$ 27,000.00 <br />$ 6.25 <br />$ 25,000.00 <br />21 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) <br />4,000 <br />CY <br />$ 15.00 <br />$ 60,000.00 <br />$ 9.00 <br />$ 36,000.00 <br />$ 9.50 <br />$ 38,000.00 <br />22 <br />2105.525 <br />TOPSOIL BORROW (LV) <br />1,036 <br />CY <br />$ 15.00 <br />$ 15,540.00 <br />$ 9.00 <br />$ 9,324.00 <br />$ 12.00 <br />$ 12,432.00 <br />23 <br />2123.61 <br />EXPLORATORY DIGGING <br />5 <br />HR <br />$ 150.00 <br />$ 750.00 <br />$ 125.00 <br />$ 625.00 <br />$ 300.00 <br />$ 1,500.00 <br />24 <br />2211.501 <br />AGGREGATE BASE, CLASS 5 FOR STREET, TRAIL, & <br />DRIVEWAY (100% CRUSHED) <br />9,485 <br />TN <br />$ 14.00 <br />$ 132,790.00 <br />$ 15.00 <br />$ 142,275.00 <br />$ 11.00 <br />$ 104,335.00 <br />25 <br />2350.501 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR STREET (C) <br />1,765 <br />TN <br />$ 39.65 <br />$ 69,982.25 <br />$ 42.40 <br />$ 74,836.00 <br />$ 42.00 <br />$ 74,130.00 <br />26 <br />2350.501 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIL (C) <br />549 <br />TN <br />$ 48.40 <br />$ 26,571.60 <br />$ 56.17 <br />$ 30,837.33 <br />$ 53.50 <br />$ 29,371.50 <br />27 <br />2350.502 <br />TYPE LV 3 NON - WEARING COURSE MIXTURE FOR STREET (C) <br />1,765 <br />TN <br />$ 39.00 <br />$ 68,835.00 <br />$ 40.34 <br />$ 71,200.10 <br />$ 41.50 <br />$ 73,247.50 <br />28 <br />2350.503 <br />TYPE LV 4 WEARING COURSE MIXTURE FOR DRIVEWAYS (C) <br />(2" THICK) <br />291 <br />SY <br />$ 12.50 <br />$ 3,637.50 <br />$ 14.17 <br />$ 4,123.47 <br />$ 1100 <br />$ 3,492.00 <br />29 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />685 <br />GAL <br />$ 1.50 <br />$ 1,027.50 <br />$ 1.32 <br />$ 904.20 <br />$ 1.40 <br />$ 959.00 <br />30 <br />2451.609 <br />1.5" CRUSHED ROCK (TRENCH STABILIZATION) <br />77 <br />TN <br />$ 25.00 <br />$ 1,925.00 <br />$ 20.00 <br />$ 1,540.00 <br />$ 30.00 <br />$ 2,310.00 <br />31 <br />2501.515 <br />15' RC PIPE APRON W/ TRASH GUARD <br />8 <br />EA <br />$ 850.00 <br />$ 6,800.00 <br />$ 745.50 <br />$ 5,964.00 <br />$ 748.00 <br />$ 5,984.00 <br />32 <br />2501.515 <br />18" RC PIPE APRON W/ TRASH GUARD <br />4 <br />EA <br />$ 950.00 <br />$ 3,800.00 <br />$ 798.00 <br />$ 3,192.00 <br />$ 863.00 <br />$ 3,452.00 <br />33 <br />2501.515 <br />21' RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 1,250.00 <br />$ 1,250.00 <br />$ 1,008.00 <br />$ 1,008.00 <br />$ 978.00 <br />$ 978.00 <br />34 <br />2501.515 <br />27' RC PIPE APRON W/ TRASH GUARD <br />1 <br />EA <br />$ 1,500.00 <br />$' 1,500.00 <br />$ 1,365.00 <br />$ 1,365.00 <br />$ 1,323.00 <br />$ 1,323.00 <br />35 <br />2502.602 <br />10" PVC CLEANOUT INCL. CASTING ASSEMBLY <br />4 <br />EA <br />$ 650.00 <br />$ 2,600.00 <br />$ 525.00 <br />$ 2,100.00 <br />$ 460.00 <br />$ 1,840.00 <br />36 <br />2502.602 <br />12" PVC CLEANOUT INCL. CASTING ASSEMBLY <br />1 <br />EA <br />$ 750.00 <br />$ 750.00 <br />$ 588.00 <br />$ 588.00 <br />$ 520.00 <br />$ 520.00 <br />37 <br />2503.511 <br />10" PVC PIPE SEWER, SDR26 <br />928 <br />LF <br />$ 30.00 <br />$ 27,840.00 <br />$ 24.15 <br />$ 22,411.20 <br />$ 23.50 <br />$ 21,808.00 <br />38 <br />2503.511 <br />12" PVC PIPE SEWER, SDR26 <br />162 <br />LF <br />$ 35.00 <br />$ 5,670.00 <br />$ 27.30 <br />$ 4,422.60 <br />$ 26.50 <br />$ 4,293.00 <br />39 <br />2503.541 <br />15" RC PIPE SEWER, DESIGN 3006 CLASS V <br />508 <br />LF <br />$ 25.00 <br />$ 12,700.00 <br />$ 30.45 <br />$ 15,468.60 <br />$ 29.00 <br />$ 14,732.00 <br />40 <br />2503.541 <br />18" RC PIPE SEWER, DESIGN 3006 CLASS V <br />635.00 <br />LF <br />$ 28.50 <br />$ 18,097.50 <br />$ 33.60 <br />$ 21,336.00 <br />$ 31.00 <br />$ 19,685.00 <br />41 <br />2503.541 <br />21" RC PIPE SEWER, DESIGN 3006 CLASS III <br />60 <br />LF <br />$ 31.00 <br />$ 1,860.00 <br />$ 37.80 <br />$ 2,268.00 <br />$ 33.50 <br />$ 2,010.00 <br />42 <br />2503.541 <br />27" RC PIPE SEWER, DESIGN 3006 CLASSIII <br />35 <br />LF <br />$ 38.00 <br />$ 1,330.00 <br />$ 47.25 <br />$ 1,653.75 <br />$ 42.50 <br />$ 1,487.50 <br />43 <br />2504.602 <br />ADJUST VALVE BOX <br />4 <br />EA <br />$ 350.00 <br />$ 1,400.00 <br />$ 241.50 <br />$ 966.00 <br />$ 230.00 <br />$ 920.00 <br />44 <br />2504.602 <br />CONNECT TO EXISTING WATERMAIN <br />1 <br />EA <br />$ 750.00 <br />$ 750.00 <br />$ 1,785.00 <br />$ 1,785.00 <br />$ 1,150.00 <br />$ 1,150.00 <br />