My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/12/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
11/12/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:38:45 PM
Creation date
11/7/2014 2:48:55 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/12/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Easements <br />A drainage and utility easement of 10 feet and 25 feet wide are provided along the <br />interior perimeter of the lot. <br />Storm Water Management and Erosion and Sediment Control <br />Storm water quality requirements will be achieved using a surface pond providing <br />infiltration. The "A" soils are conducive to this type of stormwater management. This <br />pond will infiltrate the required water quality volume (2.5 inches of rainfall over the <br />drainage area) and route storms exceeding this runoff volume through a control structure <br />in the pond. A control elevation will be established at the quality volume for discharges <br />above this amount of runoff. For informative purposes the 1-year storm precipitation <br />amount is less than the required quality runoff, thus no discharge from the pond is <br />anticipated from this storm event. <br />Utilities <br />Utilities will connect to existing mains; water along Highway 23, sewer to the main on <br />77t' Street, and stormwater to an existing catch basin on Highway 23. Electric and <br />telephone will connect on an existing pole on 77th Street and gas will connect to an <br />existing main running just south of the property. The parking lot will be graded so as to <br />drain to a series of catch basins. The roof runoff will be collected and conveyed <br />underground to the proposed stormwater pond on the west side of the property. <br />Public Land Dedication <br />The City will require cash in lieu of land dedication. The assisted -living facility will be <br />considered commercial for the purpose of calculation park dedication fees. <br />Park Dedication FeeE;$4r,133 <br />!1.9!0acres x $2,175 per acre = <br />Tree Preservation <br />The preliminary plat identifies 18 trees on site. The demolition plan indicates the removal <br />of approximately 4 trees and undergrowth shrubs within the non -ESA Basic Use Area. <br />No tree mitigation is required. <br />Landscaping <br />A Landscaping Plan has been submitted and reviewed. Details and required revisions can <br />be found in the Site Plan Worksheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.