Laserfiche WebLink
Ms. Katie Larsen <br />November 5, 2014 <br />Page 2 <br />Storm Sewer and Drainage Comments: <br />After reviewing the above documents against the City of Lino Lakes Stormwater and Erosion <br />and Sediment Control Ordinance (No. 09-11) and the 2013 Rice Creek Watershed District <br />(RCWD) Rules, we have the following comments: <br />2. Drainage Report: <br />■ Update the proposed conditions area summary, the totals do not add up on page 2 <br />■ Update the water quality volume calculation with the correct proposed impervious area on <br />page 3 <br />Grading and Erosion Control Plan <br />■ Impervious area totals shown on plan do not match HydroCAD model results or the Drainage <br />Report <br />4. Administrative: <br />■ The applicant must provide an operation and maintenance agreement for stormwater <br />facilities. This agreement must be recorded against the parcel so that it transfers with future <br />sales of the parcel. This may be included as a part of the Developer's agreement with the <br />City. <br />■ The applicant must receive permits from other agencies prior to construction. Permits needed <br />may include the MPCA's NPDES Construction Stormwater Permit and RCWD's Stormwater <br />Management and Erosion Control permits. <br />This concludes our plan review comments at this time. If you, or the applicant, have any <br />questions regarding these comments, please contact me at (612) 360-1298 or <br />dhankee@wsbeng.com. <br />