Laserfiche WebLink
z <br />O <br />Q <br />O <br />O <br />J <br />O <br />Z <br />v <br />2 <br />W <br />r <br />m <br />0 <br />w <br />'a <br />W <br />I- <br />0 <br />Q <br />0) <br />a <br />n <br />OD <br />OD <br />N <br />L6 <br />z <br />rr <br />0 <br />OD <br />N <br />m <br />i \ <br />fIf / - - - - - - / <br />/ <br />'WA jVR WATE \ <br />U 4\ / <br />cn <br />v\ ORE DRILL AND - <br />P \ CONNECT TO <br />EXISTING CB <br />INV 906.00 <br />Q \ O 35 LF, 12" HDPE @ 4.86°/, OVERFLOW <br />73B STRUCTURE <br />\x RIM 909.50 <br />,[ INV (SE,NW) 907.70 <br />WEIR (81 907.70 / <br />SUMP 905.00 <br />Q % <br />J , <br />/ <br />/ <br />I <br />I <br />/ <br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />N <br />rn <br />1 <br />1 <br />1 <br />I <br />/ <br />/ <br />/ olb <br />0 C0 <br />/ �o o^ <br />rn moo <br />� 1 INFIL <br />BAS I <br />BOT <br />/ NWL <br />--F' w <br />/ 09D 17D FES 1 <br />/ INV 905.00 <br />/ \ o <br />r, <br />/ <br />/ <br />° ,N f / <br />1 / <br />1 , <br />1 / <br />1 / <br />1 <br />I <br />r, / <br />F 1 <br />1 <br />SITE BENCHMARK <br />SITE BENCHMARK <br />ELEVATIONS BASED ON ASSUMED VERTICAL DATUM <br />USING THE BENCHMARKS SHOWN ON THE SURVEY. <br />(NAVD 88) <br />�� BEFORE you <br />�S <br />�S <br />Q\ <br />00 � <br />�� <br />Tq ONE CPS\ <br />AI�L <br />0 20' 30' 40' <br />SCALE IN FEET <br />PROPOSED <br />-- PROPERTY LINE/RIGHT OF WAY LINE <br />-- GRADE BREAK <br />XXX CONTOUR ELEVATIONS <br />- - - - - - - STORM DRAIN <br />X XX.XX SPOT ELEVATIONS: <br />TC = TOP OF CURB <br />G = GUTTER <br />FG = FINISH GRADE <br />GENERAL GRADING NOTES <br />A. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER, THE CONTRACTOR SHALL EXCAVATE, VERIFY, AND <br />CALCULATE ALL CROSSINGS AND INFORM THE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO <br />1 / 7 7 t h STREET CONSTRUCTION. THE ENGINEER WILL BE HELD HARMLESS IN THE EVENT THE ENGINEER IS NOT NOTIFIED OF <br />TER T_ER <br />1 - DESIGN CONFLICTS. <br />1 � <br />-� A_ - --- B. CONTRACTOR HAS THE OPTION TO BID THE FOLLOWING MATERIAL FOR THE STORM SEWER SYSTEM EXCEPT <br />WHERE OTHERWISE NOTED: HDPE OR PVC AS INDICATED ON THIS PLAN WHERE THE WORD PIPE IS USED. ALL <br />---- SS PIPE <br />--------------==�-r- � � --- PIPES SHALL HAVE A MAXIMUM ROUGHNESS COEFFICIENT (N) OF 0.011 AND SHALL MEET OR EXCEED THE P <br />-------------- MANUFACTURERS REQUIREMENTS FOR MINIMUM AND MAXIMUM COVER. CONTRACTOR SHALL REFER TO THE <br />SS SS w SS ' SITEWORK SPECIFICATION SECTION FOR STORM SEWER SYSTEMS FOR ACCEPTABLE TYPE AND MATERIAL. <br />01* 1 WATER WATER WATER WATER O WATER SS SS fJS 91.2 � C. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH AND 4" OF TOPSOIL <br />-- --- -- __ APPLIED. IF ADEQUATE TOPSOIL IS NOT AVAILABLE ON SITE, THE CONTRACTOR SHALL PROVIDE TOPSOIL, <br />- -- -- -- -- - __ WATER �. <br />73A MYLOPLA __------------- _____-_-- , 18D 18D APPROVED BY THE OWNER, AS NEEDED. THE AREA SHALL THEN BE SEEDED, FERTILIZED, MULCHED, WATERED <br />W/ SOLID _ - / I AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS (SEE LANDSCAPE PLAN FOR <br />CASTING /�' 911 1 SEED MIX AND PROPER APPLICATION RATE). ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL <br />FG 911.43 ACCEPTANCE OF THE PROJECT SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE <br />RIM 912.45 nHF OHE _ �� OHE -OHE OHE - OHE OHE OWNER. <br />-z- INVW,E906.57- / -��---------- <br />\ GAS INV SE 908.00 of/ �H 5 73A - - - - , FG 911.81 _ o- <br />--F_ -- - _ -- - NYLOPLAST -18" FG 911.55 D. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES <br />---------------------- o <br />f HP 911.50 56 LF, 18" - ----- -- } -- 118 LF, 18" W/ SOLID / / AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE <br />\ % 73A MH 3 ; HDPE @ 1.00% CASTING / 0.1 % / POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT <br />\ NYLOPLAST HDPE @ 1.00% 9>-------------- / 8" 12 1 / OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HOURS <br />912 :--�- ���--------- __ RIM910.75 1 0� 1/ <br />-wr== - - - __ _ _ _ _ - - - - - - 1� - - - - - - iNni am �� - i FG 911.53 BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. <br />CASTING - - - - - - <br />\----___ 911- - TC 912.18 <br />RIM 912.45 I I \\----�0`2 G 911.68 I E. UNLESS OTHERWISE SHOWN, CALLED OUT OR SPECIFIED HEREON OR WITHIN THE SPECIFICATIONS: ALL STORM <br />INV 906.01 ____ 40 LF, 12" --- 912 �\ / TC 912.27 I DRAIN PIPE BEDDING SHALL BE INSTALLED PER DETAIL 28A. ALL STORM DRAIN PIPES ARE MEASURED FROM <br />FG a12 88 \ HDPE @ 1 00% FG 912.88 -� ° \\ 40 LF, 12" �- TC 912.40 9r� G 911.77 / CENTER OF STRUCTURES AND ENDS OF FLARED END SECTIONS. <br />14 LF, 12" HDPE <br />@-19.28% <br />3nr <br />91.3 FG 912.52 FG 912.79 ° \��. FG 912.79 ° 4'1\\ HDPE @ 1.00% 912.63 TC 912 16 90 \,II/ 4" / m <br />I 51 LF, 18" d FG 912.52-__-''TC%\ / = 1 <br />II HDPE @ 1 .DD% o ° ° d d ° ° ° ° G c ° ,°r\°, d ° ° ° ° G 912.13 <br />° cp \ \ ° d ° ° d ° ° ° e �G 91 a.68 d a• \\\ ° d G ° ° d d ° ° ° 1.30/ o G 91 1.66 1 <br />FG 912.96 ° d ° d ° A ___1_. d 1.6/o �� FG 911.65 <br />I FG 912.96� \\ FG 912.60 2.6° \\ \ FG 912.60 T FG 912.96 FG 912.9 Q ° TC 912.1 , <br />G 911.68/ / <br />FG 913.00 FG 912.75 6% \\ `� o / �?� .0- -�� / I / <br />FG 913.00 - 2' FG 913.00 FG 912.96 1 8 / J ro TC 912.36 1.5% <br />�FG <br />G 913.00 <br />FG 913.00 1 6% - FG 913.00 FG 913.00 FG 913°.00 = `91j�1 FG 913.00 FG 912.75 ° G 911.86 / <br />FG 912.40 �' �� 1 912.75 FG 912.63 I ' / <br />© © © 1 6 ° FG 912.50 1 i <br />�I <br />FG 912.37 FG 912.75 FG 912.75 FG 912.75 CB 5 ��'� �FG 912.75 °G 911.47 TC 911.68 ' o'MH 2 _ �73A -- �--TC 911 .97 G 911.18 <br />NYLOPLAST 73A 73A CB 4 --�. NYLOPLAST - \ FG 912.48 / / m j GRADING NOTES <br />W/ GRATE I PROPOSED CASTING f 1 <br />W/ SOLID <br />W/ GRATE / I I 1 09D FLARED END SECTION. <br />CASTING CASTING RIM 912.23 18D MATCH EXISTING PAVEMENT ELEVATIONS. <br />RIM 912.1 1 RIM 912'S3 SENIOR INV 908.15 1\ ° I I <br />INV 905.50 INV 908.40�\ ��-__ / �o _ _ ► 1 1 <br />3.7/o 24 LF, HDPE @82.08% ,1 ASSISTED LIVING ���` - s11 ° �� ° --- \` ❑ GRADING DETAILS <br />° <br />± 211118 S. F. 17D RIP RAP PAD <br />/ o I 21A CURB INLET <br />FEST DRAIN BASIN <br />INV 2 / ONE STORY- 39 UNITS / ° ��� 1� � 1 73B OUTLET <br />CONTROL STRUCTURE <br />INV 905.00 17D 09D � f � 1 " <br />FG 912 40 FFE = 913.00 <br />TOM <br />- <br />`\ <br />C, co C) CD rn o T N <br />0 o r- o o r <br />o a a s rn rn rn rn <br />FG 912.37 <br />FG 912.40 / <br />FG 912.91 <br />FG 913.00 <br />FG 913.00 <br />/ <br />/ <br />FG912.95 / <br />1111 <br />FG <br />FG 911.75 <br />Q 1 <br />FG912.90 <br />FG 913.00 <br />/ <br />d <br />1 <br />NRATION <br />FG 912.40 <br />FG 912.90 <br />FG 912.90 <br />FG 913.00 <br />v <br />FG 912.88 1 <br />FG 912.88 <br />- <br />= 905.00 <br />o <br />d p� <br />° <br />FG 913.00 <br />a r <br />1 <br />° <br />_= 907.70 <br />° ° d 11' <br />G 912 33 e° <br />d ° ° <br />FG 912.93 <br />1.5% <br />,ten a \ ° <br />d ° <br />FG 911.75 <br />1 .6 ° <br />A� <br />° <br />• 1.5 /o <br />FG 912.88 <br />909.12 <br />TC 912.83 <br />1.5% G 912.33 FG�912.33 <br />° <br />d° <br />d <br />° ❑� d <br />FG 912.73 <br />FG 9 2 81 <br />1.5% <br />T <br />TC \\` <br />TC 912.81 <br />c <br />FG 913.00 <br />i <br />/ <br />- <br />1 ° FG 912.33 ° <br />o <br />FG912.3'3 <br />1.5% <br />G 912.31 <br />12.31 � <br />G912.31 <br />° <br />FG 91 1.00 <br />FG 913.00 <br />2.0%e TC 912.83 � n <br />I r TC 912.83 T <br />TC 91t71 <br />c d <br />FG 912.3 ° <br />d A d o° <br />o <br />TC 912.69 <br />1.2% <br />d <br />FG 913.00 <br />° <br />TC 910.92 <br />1 <br />G 912.33 I G 912.33 I <br />TC 912.72 <br />G 912.21 <br />o <br />° N� <br />4° d o <br />° d <br />G 912.19 <br />0'5% <br />FG 91 1 .25 <br />/ <br />G 910.42 <br />1 <br />FG 912.40 <br />g, <br />° G 912.22 0.0% <br />ni <br />° <br />TC 912.60 <br />912.55 <br />FG 912.83 <br />FG 912.46 FG 912.80 <br />I --- I <br />°a TC 912.72 <br />G 912.10 <br />G�912.05 <br />d <br />FG 912.61 <br />FG 911.25 <br />° <br />FG 912.69 <br />G 912.22FFG G 912.52 912.52� <br />C 9 7 <br />TC 912.54 <br />IFG'911.65 <br />/ <br />- 911 <br />y �� <br />36 LF, 18" <br />FG 912.46 <br />° TC 912.58 <br />912 G 912.08° <br />--� <br />12.07 <br />- G 912.04 <br />°l0_912 <br />° <br />FG 912.41 <br />FG 911.10 <br />TC 910.41 <br />1 21A <br />HDPE @ 0.50% <br />FG 911.65 <br />2� <br />� \ <br />G 909.91 <br />RI <br />RIM 909�56 <br />90 <br />�� <br />c°\o ° <br />m <br />I I <br />INV 906. 9 1 <br />MH 1 <br />\ <br />\\ <br />•� <br />N <br />- 1 �_� j <br />TC 912.33 <br />T <br />TC 911.12 <br />,°o <br />1 <br />73A <br />ENYLOPLAST - - - 151 LF 18" HDPE @ 0_50%° <br />_° <br />°° `` <br />/ <br />--� <br />G 911.83 <br />TC 911.04 <br />r, <br />G 910.62 <br />/ <br />W/ SOLID <br />-- - - - <br />- - <br />- - - - - - - - <br />------ - - - ---------- <br />- <br />� <br />- <br />/� <br />o <br />G91054 <br />>o <br />� <br />//@ <br />/Q� TC91006 <br />d' / 9/3 CASTING - - - - -lvr- - -911 - _ - - - 148 LF 12" HDPE (to .50%�' �� ° g10 / 1 �O G 909.56 <br />RIM 912.16 ° ��� _ - - � - - - /Z�F <br />STORMWATER SUMMARY <br />TOTAL PROPERTY AREA=82,914 SF <br />TOTAL DISTURBED AREA = 76,214 SF > 1 ACRE THEREFORE A NPDES <br />SWPPP PERMIT WILL BE REQUIRED. <br />PRE -DEVELOPMENT <br />PERVIOUS AREA = 53,391 SF <br />IMPERVIOUS AREA = 29,523 SF <br />2-YEAR STORM = 0.41 CFS <br />10-YEAR STORM = 2.11 CFS <br />100-YEAR STORM = 7.61 CFS <br />100-YEAR 10-DAY SNOW MELT = 2.29 CFS <br />POST -DEVELOPMENT <br />PERVIOUS AREA = 39,081 SF <br />IMPERVIOUS AREA = 43,883 SF <br />2-YEAR STORM = 0.17 CFS <br />10-YEAR STORM = 0.66 CFS <br />100-YEAR STORM = 3.69 CFS <br />100-YEAR STORM INFILTRATION BASIN HWL=909.12 <br />100-YEAR, 10-DAY SNOW MELT = 1.87 CFS <br />100-YEAR, 10-DAY SNOW MELT INFILTRATION BASIN HWL = 908.63 <br />TC912.21 _ -'-------_-__ _ i <br />•TP ���----- INV 905.187C911.26 912 <br />'d ` ---------- --- G 911.71 - �---- G 910.76 - TC 912.21 <br />° <br />CB 3 o <br />- - - - - <br />- - - - - - - G911.71 ------2.0%--- <br />- 1.8� RIM 910.76 21A TC 911.98 �' TC 910.35 <br />G 911.68 ° <br />INV 905.94 G 911.48 G 909.85 <br />� `\\`d •• 44 GAS GAS \� -GAS -- -- -- - ,,,, <br />G �` \ G GAS GAS G 911.07 TC 910.83 CB 2 21A 9,�'�'--- <br />/ GA G 910.33 RIM 909.85 <br />GAS INV 906.68 � <br />GA <br />ar <br />/ . <br />� /t/t/` • ��� � `��\\ % � ° 6 0 0 <br />l1�E- - OHE_. UG C�HF nuG � tin �%���� .. SP E <br />. OHE nHF <br />- _ - - - - - - = -.- -� 28461 10/8/14 ALC ALC SJM SJM <br />° AML - <br />912 <br />913 _---- CEI PROJECT NO. I INITIAL DATE I DPOR I PM DES I DRW <br />d\\ `~� `- - Engineering Associates, Inc. <br />° <br />• a . _---f----- - - - - ENGINEERS PLANNERS SURVEYORS <br />M - 4 !\ . . ___ - 1p LANDSCAPE ARCHITECTS • ENVIRONMENTAL SCIENTISTS <br />Rk `• � � ; .� -� �� PROJECT BM �1: <br />TNH=912.47 : �.�''• <br />�.Q y 2025 Centre Pointe Blvd., Suite 210 (651)452-8960 <br />1 j �, •' d Mendota Heights, MN 55120 (651)452-1149 <br />�. = �r: pRaFEssionA:r = <br />97, ' _"G'"R = WHITE PINE SENIOR LIVING <br />PROJECT BM #2: 479 s ����I OOOOo <br />� <br />TNH 913.41 "�, • •.• .LINOLAKES� �� MN 55014 <br />F � �, � /'/ffrrrlltii�►titi`REV DATE SHEET N0. <br />GRADING PLAN IW15114 c3 <br />REV-1 <br />(C) 2014 CEI ENGINEERING ASSOCIATES, INC. <br />