Laserfiche WebLink
Mattamy Homes Limited <br />Minneapolis Division <br />wetlands. Even if all ponds, parks, stormwater ponds, wetlands and proposed open space are <br />excluded, the proposed density is still only 3.75 per acre; well below the 4.5 du/acre threshold. <br />The Comprehensive Plan allows for 70 acres of commercial. As has been discussed with the City <br />Council, the likelihood of this parcel becoming a type of commercial that would be acceptable to <br />the City is remote. 70 acres will allow for four big -box type centers; if this intensity of commercial <br />is interested in this intersection, it will be on any of the other three corners of CR 14 and 35E; <br />these corners have direct access and visibility from County Road 14. For the sake of analyzing <br />yield, even if the 70 acres of commercial were taken out of the density calculation, Watermark is <br />still only 70% of the allowable density. <br />Phasing <br />Trunk sewer and water serve the site from the south. As can be seen from the development plan, <br />the part of the site that offers the highest amenity (parks, open space, wetland complexes) and <br />greatest potential for creating an exciting arrival is in the center of the site. <br />It is Mattamy's intent to build a model center at the center entrance from County Road 21 <br />offering all 4 detached home products. It is anticipated that the central pond will be constructed <br />along with the park and community center (discussed earlier). Ideally, this part of the <br />neighborhood would open in the fall of the year (Phase 1). At the same time, construction would <br />start on the southern end of the project, allowing us to open the more dense part of the project <br />in the Spring or Summer of the following year. Screening from 35E will be accomplished with <br />berming (15') and landscaping and be constructed along with Phase 1 and la. <br />The absorption rate of the various product types will determine exact phasing but the likely <br />scenario is that phasing will fill in the area between the central park and townhouse area, making <br />use of the infrastructure installed to serve the central park area. <br />We expect to complete the project 8-9 years after sales start, assuming a construction pace of <br />100 units per year. <br />Summary <br />Watermark is a unique solution to the natural and regulatory challenges that this site presents. <br />Its proximity to transportation and the rest of the metro area, the surrounding open space and <br />recreational areas, quality schools and a broad buyer profile offer a unique locational advantage. <br />At the same time, these very attributes present challenges to site planning, water resource <br />management, and regulatory approvals. <br />