My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-013 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2003
>
2003-013 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2014 10:00:28 AM
Creation date
12/2/2014 9:23:57 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
01/27/2003
Council Meeting Type
Regular
Resolution #
03-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• AGENDA ITEM 7H <br />• <br />STAFF ORIGINATOR: <br />COUNCIL MEETING DATE: <br />TOPIC: <br />ACTION REQUIRED: <br />BACKGROUND: <br />Michael Grochala <br />January 27, 2003 <br />Resolution No. 03-13, Authorizing <br />Preparation of Feasibility Study, CSAH <br />49 /CSAH 10 Improvements <br />Simple Majority <br />In November of 2002, the City received a project review letter, from Anoka County, <br />identifying the minimum required improvements for CSAH 49 (Hodgson Road) and <br />CSAH 10 (Birch Street) to facilitate the development of Spirit Hills Commercial Center <br />as well as proposed future development on the Miller Farm, located immediately to the <br />south. The letter identified the need for the following improvements: <br />1. Construction of Eastbound and Westbound CSAH 10 left and right tum lanes at <br />Ware Road <br />2. Construction of Southbound CSAH 49 left turn lane at CSAH 10 <br />3. Construction of Northbound CSAH 49 right tum lane and Southbound left tum <br />lane at Arrowhead Street (future access to Miller Farm) <br />4. Realignment of Ware Road, south of CSAH 10, to line up with Ware Road north <br />of CSAH 10. <br />5. Construction of Eastbound CSAH 10 right turn lane and raised pork chop median <br />to facilitate right -in /right -out access from the Miller Farm to CSAH 10. <br />6. Construction of Northbound CSAH 49 right tum lane and right -in /right -out access <br />(raised pork chop median) at the Ware Road extension. <br />7. Construction of Traffic Control Signals at the CSAH 49 /CSAH 10 intersection. <br />Since the responsibilities for the above referenced improvements are shared between <br />two developers it is staffs opinion that a City prepared report would be advantageous to <br />insure that a coordinated improvement plan is prepared. Both developers have <br />requested that the city prepare the report and have agreed to equally split the costs of <br />its preparation. <br />Therefore, at staffs request, TKDA, the City's Engineer, has submitted a proposal to <br />prepare a feasibility study for the above referenced improvements for a not to exceed <br />cost of $7,400. The feasibility study is intended to better delineate the extent of <br />improvements and associated costs. <br />• OPTIONS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.