Laserfiche WebLink
11. Grading, drainage and utility related modifications and comments as recommended by the <br />City Engineer in the attached memorandum (dated April 16, 2003) shall be addressed and <br />incorporated into the plans. <br />12. The project is subject to the results of the sewer feasibility study. <br />13. The project is subject to the City's determination of the number of residential units to be <br />allowed to connect to the City water system, based on the system's ability to provide <br />adequate service, prior to the construction of the infrastructure needed to provide service to <br />the units. <br />14. The project is subject to all requirements of Anoka County regarding access to Sunset <br />Road/CR 53. <br />15. Additional right of way for Sunset Road/CR 53 shall be dedicated, to total 60' from <br />centerline, within all areas of the plat. <br />16. The City formally vacate the segment of Carl Street as needed for developing this plat. <br />17. The airplane hangers in Lots 1 -4 and Lot 9, Block 4 (Phase 1) shall be built on the runway <br />side of the houses, with the houses fronting on the road rather than the houses on the runway <br />side of the lots. <br />18. Signs shall be installed along all wetland buffer /easement areas. Wetland easements shall <br />extend, at a minimum, 10 feet outward from the delineated wetland boundary. <br />19. This resolution shall not be effective until the rezoning approved by Ordinance 12 -03 is in <br />effect. <br />20. Elements of the project not specifically designed or addressed in the plans and supporting <br />documents are subject to the standards of the zoning ordinance. R -1 standards will apply to <br />single family detached portions, the R -3 standards to the multi - family attached portions. <br />21. Prior to consideration of a final plat, a revised preliminary plat shall be submitted for City <br />review to ensure that it reflects approved revisions. <br />22. This approval is based on the following plans and information, and supporting <br />documentation: <br />Existing Conditions Plan, received January 31, 2003 <br />Preliminary Plat, dated January 20, 2003, received January 31, 2003 <br />Preliminary Site Plan, dated January 20, 2003, received January 31, 2003 <br />Phasing Plan (data April 18, plan sheet April 23, 2003) <br />Preliminary Landscape Plan, dated January 20, 2003, received January 31, 2003 <br />