Laserfiche WebLink
IT IS AGREED BY AND BETWEEN THE PARTIES HERETO: <br />I DESIGNATION OF IMPROVEMENTS. <br />A. Improvements on the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "On -site Work ". <br />B. Improvements off the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "Off -site Work ". <br />C. Developer shall enter into an operation and maintenance agreement for <br />stormwater treatment facilities on the site. <br />II. ON -SITE WORK. <br />On -Site Work. The On -site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on -site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, water mains, sanitary sewers, <br />hydrants, curbing, lighting, fencing, fire lanes, sidewalks, trails, outside <br />trash disposal enclosures, exterior building architectural design and <br />building elements, site grading, tree preservation work and erosion control <br />measures. <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On -site <br />Work is as follows: <br />Description of Improvements Estimated Costs <br />1. Lighting $ 4,200 <br />2. Parking Lot Improvements $ 15,000 <br />(curbing & bituminous) <br />MuellerPerformAgmt page 2 of 10 <br />