My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-091 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2003
>
2003-091 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2014 2:35:42 PM
Creation date
12/5/2014 2:08:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
06/23/2003
Council Meeting Type
Regular
Resolution #
03-091
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Storm Drainage System $ 1,000 <br />4. Landscaping $ 11,750 <br />5. Site Grading/Erosion Control/Restoration $ 34,250 <br />Total Estimated Cost of Developer $ 66,200 <br />Improvements <br />Security Requirement (Total * 125 %) $ 82,750 <br />. OFF- Sl'1'E WORK <br />A. Off -site Work. The Developer shall design and install, at the Developer's <br />Expense, certain Off -site Work as follows: <br />1. Excavation, construction, restoration for driveway /access within <br />James Street right of way. <br />2 Excavation, construction, restoration, for utilities connection <br />(sanitary sewer, water) within Lake Drive right of way. <br />Such improvements shall be completed in accordance with Section IV., set <br />forth herein. <br />B. Right- of -Way. The Developer shall be responsible for acquiring any <br />right -of -way, temporary easements, or permanent easements necessary for <br />the making of such improvements. <br />Plans & Specifications. The Developer shall prepare plans and <br />specifications for the making of such improvements. Said plans and <br />specifications shall be subject to review and approval by the City of Lino <br />Lakes and Anoka County. <br />D. Construction Observation. The Developer shall instruct its engineer to <br />provide adequate field inspection personnel to assure an acceptable level <br />of quality control to the extent that the Developer's engineer will be able to <br />certify that the construction work meets the approved City and County <br />standards as a condition of City /County acceptance. In addition, the City <br />and or County, shall have one or more City inspectors inspect the work on <br />a full or part-time basis. <br />The Developer, its contractors and subcontractors, shall follow all <br />reasonable instructions received from the City's /County inspectors. Prior <br />to construction, the Developer or its engineer shall schedule a <br />preconstruction meeting at a mutually agreeable time at the Lino Lakes <br />City Hall, located at 600 Town Center Parkway, Lino Lakes, Minnesota <br />with contractors, subcontractors, the City staff, and other parties specified <br />MuellerPerformAgmt page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.