Laserfiche WebLink
• <br />Exhibit D <br />Data and Computations <br />Revised 11 -10- 00,11 -13 -00 <br />Clearwater Creek Business Center (CCBC). <br />Cost of lateral improvements in the CCBC plat under Brown and Cris contract: <br />Cost of trunk improvements in the CCBC plat under Brown and Cris contract: <br />Total cost to install sanitary sewer and water under the Brown and Cris contract: <br />$236,070.35 <br />$377,017.01 <br />$613,087.36 <br />38.51% <br />61.49% <br />100.00% <br />Cost to provide sanitary sewer and water service outside of the plat to serve properties north of Main Street: $135,030.80 <br />City engineering costs incurred as part of the CCBC plat: <br />Feasibility Study $14,100 <br />Plans and Specifications $37,000 <br />Construction Administration $39,700 <br />Total $90,800 <br />Engineering as a percentage of construction costs: <br />City engineering cost allocation based on construction <br />$90,800 / $613,087.36 = 14.81 % <br />of lateral and trunk improvements: <br />Lateral Trunk <br />38.51% 61.49% <br />Total <br />Feasibility Study <br />Plans and Specifications <br />Construction Administration <br />Total <br />$ 5,429 <br />$14,249 <br />$15,288 <br />$34,966 <br />$ 8,671 <br />$22,751 <br />$24,412 <br />$55,834 <br />$14,100 <br />$37,000 <br />$39,700 <br />$90,800 <br />