My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-12-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
01-12-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2015 3:09:47 PM
Creation date
1/15/2015 11:38:01 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/12/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AI Task <br />WSB City of Lino <br />Irl <br />Street <br />Hour Work Plan <br />Lakes, Minnesota <br />Reconstruction Project <br />Area <br />-2015 <br />4,4,...4,, hr. Shenandoah <br />Work <br />Tasks <br />Description <br />Project <br />Manager <br />Sr. Prof. <br />Engineer <br />Prof. <br />Engineer <br />Grad <br />Engineer/Sr <br />Tech <br />RPR / <br />Contractor / <br />Surveyor <br />Intern <br />/Admin. <br />TOTAL <br />1.11 Preliminary Design Phase <br />1.1 <br />Topo Survey <br />1 <br />0 <br />0 <br />100 <br />00 <br />20 <br />201 <br />1.2 <br />Host a project web site to which the City can Fmk. Populate the site <br />with updated information and exhibits initially and with three updates. <br />1 <br />0 <br />0 <br />5 <br />0 <br />8 <br />14 <br />1.3 <br />Neighborhood Meeting (Assumes two meetings) <br />2 <br />2 <br />0 <br />8 <br />0 <br />8 <br />20 <br />1.4 <br />Data Collection / Existing Utility Coordination1 <br />0 <br />4 <br />8 <br />0 <br />8 <br />21 <br />1.5 <br />Road Horizontal and Vertical Alignment Plans <br />1 <br />0 <br />12 <br />20 <br />0 <br />20 <br />53 <br />1.6 <br />Roadway Typical Section <br />1 <br />0 <br />8 <br />12 <br />0 <br />20 <br />41 <br />1.7 <br />Storm Water Management Recommendations <br />1 <br />4 <br />12 <br />8 <br />0 <br />2 <br />27 <br />1.8 <br />Review Sewer Televising Report <br />1 <br />4 <br />0 <br />20 <br />0 <br />20 <br />45 <br />1.9 <br />Cost Estimate <br />1 <br />2 <br />4 <br />0 <br />8 <br />8 <br />23 <br />1.10 <br />Project Management Team Meeting <br />4 <br />4 <br />6 <br />6 <br />0 <br />6 <br />26 <br />Task 1.0 Subtotal Hours: <br />/4 <br />16 <br />46 <br />187 <br />88 <br />120 <br />471 <br />Deliverables - Project schedule, Geotechnical Report, Agendas and <br />meeting minutes/notes, Engineers Estimate. <br />2.0 <br />Final Design & Construction Bid Document <br />Preparation <br />3.1 <br />Utility coordination, including drafting of in-place utilities into the plans <br />( utility quality level D), coordination with utility owners, coordinating <br />and conducting one utility owner meeting, completing the 90 day utility <br />verification process and general communication with owners. No major <br />private utility improvements or impacts are known at this point. <br />1 <br />1 <br />4 <br />0 <br />0 <br />1 <br />3 2 <br />Complete a plan set in accordance with current Univeristy of Minnesota <br />Standards and will include, at a minimum, the following: <br />o Title Sheet <br />o General Layout <br />o Construction Notes <br />o Typical Sections <br />o Miscellaneous Details <br />o Alignment Plan & Tabulation <br />o Construction Staging & Traffic Control Plan <br />o Removal Plans <br />o Street & Storm Sewer Plan and Profile <br />o Erosion Control/Turf Establishment Plans <br />o Storm Water Pollution Prevention Plans (SWPPP) <br />o Stoma Water Ponding & Grading Plan <br />o Cross Sections <br />100 <br />10 <br />300 <br />420 <br />0 <br />200 <br />1030 <br />3'3 <br />Final design of street plan and profile, includes spot elevations, curb <br />radii dimensions, and all match points. <br />1 <br />6 <br />120 <br />100 <br />0 <br />100 <br />327 <br />3 4 <br />Final design of storm sewer system, including final layout, pipe sizing, <br />structure locations, profiles, details, and casting styles. <br />1 <br />4 <br />80 <br />80 <br />0 <br />0 <br />165 <br />3.5 <br />Preparation of the SWPPP including input into the erosion control and <br />turf establishment plans. <br />1 <br />0 <br />0 <br />0 <br />0 <br />2 <br />11 <br />3.6 <br />Compute quantities for all pay items.1 <br />4 <br />24 <br />24 <br />0 <br />20 <br />73 <br />3.7 <br />Prepare technical specifications for design related items.1 <br />12 <br />24 <br />0 <br />0 <br />4 <br />41 <br />3 8 <br />Prepare Final bid documents and submit one electronic copy in PDF <br />format. Post to website <br />1 <br />0 <br />0 <br />0 <br />0 <br />2 <br />3 <br />Task 3.0 Subtotal Hours: <br />107 <br />37 <br />560 <br />624 <br />0 <br />329 <br />1657 <br />Deliverables - Final certified plans, Engineers estimates, Pavement <br />designs, Technical specifications. <br />K:\02029-850Wdmin\Contract\2015 SRP\THB work plan final 1 6 15 WSB ASSOCIATES, INC. <br />Page No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.