Laserfiche WebLink
• <br />• <br />• <br />Fire Protection <br />Arrow Sprinkler <br />Superior Fire Protection <br />Fire Guard Sprinkler <br />Midwest Fire Protection <br />Electrical <br />Gephart Electric <br />Wright Electric <br />Phasor Electric <br />Ridgedale Electric <br />J.W. Koehler <br />Mendota Electric <br />Bloomington Electric <br />116,152.00 <br />167,025.00 <br />169,600.00 <br />196,792.00 <br />587,900.00 <br />683,600.00 <br />714,000.00 <br />735,000.00 <br />789,000.00 <br />818,626.00 <br />829,000.00 <br />AND WHEREAS, it appears that Midwest Asphalt is the lowest responsible bidder for <br />asphaltic paving; and <br />Adolfson & Peterson Construction is the lowest responsible bidder for concrete and <br />masonry; and <br />Listul Industries, Inc., is the lowest responsible bidder for structural steel - erection; and <br />Haldeman -Homme, Inc. is the lowest responsible bidder for casework; and <br />Jorgenson Construction is the lowest responsible bidder for general construction; and <br />M.G. McGrath, Inc. is the lowest responsible bidder for roofing; and <br />W.L. Hall Company, Inc. is the lowest responsible bidder for aluminum windows/doors; <br />and <br />Olympic Wall Systems is the lowest responsible bidder for drywall; and <br />Graz7ini Brothers Company, Inc. is the lowest responsible bidder for tilework; and <br />Twin City Acoustics is the lowest responsible bidder for acoustical ceilings/wall panels; <br />and <br />Floors by Becker is the lowest responsible bidder for flooring; and <br />Wasche Commercial Finishes, Inc. is the lowest responsible bidder for painting; and <br />J&F Equipment, Inc. is the lowest responsible bidder for lockers; and <br />