Laserfiche WebLink
• <br />COUNCIL MINUTES JANUARY 24, 2000 <br />Council Member Dahl seconded the motion. <br />Council Member O'Donnell expressed concern regarding setting a precedence if approved. The <br />City Attorney advised a precedence would not be set. Each application needs to be dealt with <br />individually. <br />Staff noted the lots will not have City utilities. The area will utilize septic systems for some <br />time. <br />Mayor Bergeson stated he believes the condition regarding the draft Comprehensive Plan is <br />inappropriate. The applicant has the right to subdivide without changing the draft plan. <br />Council Member Dahl asked how to make the change in the plan without it being a condition of <br />approval. Staff advised they have a list of areas that need further consideration relating to the <br />plan. The Council will review these areas. <br />Council Member O'Donnell expressed concern about the impact o <br />is included. The City Attorney advised the way the condition i <br />proceed before the Comprehensive Plan is approved. There <br />approved Comprehensive Plan. <br />• Motion carried with Mayor Bergeson voting no. <br />• <br />FIRST READING, Ordinance No. <br />Batch Plant as an Interim Use i <br />Contracting, 7504 Lake Dri <br />Mary Kay Wyland — Staff <br />pavement resurfacing <br />April and July of 2000 <br />junction. Shafer Contr <br />t if the condition <br />licant can <br />n regarding the final, <br />end Zoning Ordinance to add Temporary <br />istrict (4/4 Vote Required), Shafer <br />ope y), Interim Use Permit (3/4 Vote Required) - <br />er Contracting has received the contract for concrete <br />-3 rom MnDOT. This work is scheduled to take place between <br />t area is from Sunset Road north easterly to the 35W/35E <br />g ould like to set up their batch plant on the Tagg property (Arctic <br />Sandblasting) at 7504 L e Drive. Temporary, portable concrete batch plants are needed to <br />conform to MnDOT's specifications/limits for concrete placement within 30 minutes of <br />production. This location will provide quick access, reduce traffic conflicts with hauling trucks, <br />eliminate the need for Shafer to dismantle and relocate their plan during resurfacing, and provide <br />timely completion of the project. They have signed a lease agreement with the property owner. <br />In review of this item, staff concluded that an interim use permit may be the appropriate vehicle <br />to facilitate this proposal. The property is Zoned LB, Limited Business and is the only LB <br />District within the City. <br />Staff also proposed an Ordinance Text Amendment that would add "Temporary Concrete Batch <br />Plant" as an Interim Use within the Limited business Zoning District. <br />