My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/07/2000 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
2000
>
06/07/2000 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 2:27:39 PM
Creation date
2/3/2015 12:30:12 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
06/07/2000
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL WORK SESSION JUNE 7, 2000 <br />CITY OF LINO LAKES <br />MINUTES <br />DATE : June 7, 2000 <br />TIME STARTED : 5:30 p.m. <br />TIME ENDED : 10:25 p.m. <br />MEMBERS PRESENT : Council Member Carlson, Dahl, O'Donnell, <br />Reinert, and Mayor Bergeson (part) <br />: None <br />MEMBERS ABSENT <br />Staff members present: City Administrator, Linda Waite Smith; City Engineer, John <br />Powell; Public Services Director, Rick DeGardner; Administration Dire an Tesch <br />(part); Economic Development Assistant, Mary Alice Divine (part); <br />Coordinator, Mary Kay Wyland (part); Community Developmen <br />(part); and CMC City Clerk, Ry-Chel Gaustad (part) <br />n Bugge <br />PROPOSED RECONSTRUCTION OF CSAH 49 . • AUNTY, JON <br />OLSON/JOHN POWELL <br />Staff reviewed the background of the pro <br />Council in 1998. Since then, the pro <br />An information meeting was held <br />handout regarding the details <br />Mr. Jon Olson, Count <br />project for the Co <br />many roadway <br />background an <br />project came before the <br />ended due to additional funding. <br />on April 18, 2000. Staff noted a <br />vailable to residents. <br />e forward and stated the project is a long-standing <br />t transportation plan that was developed in 1997 indicated <br />d included Highway 49. Mr. Olson reviewed the <br />es of the plan. He noted that in 1983 a comprehensive plan for <br />the County was :` ..`.ed per the Metropolitan Council. In 1991, a 2010 Comprehensive <br />Plan was developed and adopted. The plan included criteria for roadways depending on <br />their classification. Management tools were also identified in the plan. Included in the <br />plan was a recommendation that Highway 49 no longer be on the state system but part of <br />the County system. <br />Mr. Olson continued stating in 1997 a 2015 plan was developed. The County then began <br />talking about a bridge replacement. The plan was adopted in 1998 and included <br />reconstruction of Highway 49. The plan also incorporated guidelines that have been <br />adopted by the region in 1998. Mr. Olson noted the emphasis on minor arterials is <br />mobility rather than access. <br />Mr. Olson advised a bridge study was brought to the City in 1998 that included a plan for <br />a four (4) way divided section on the bridge. Mr. Olson reviewed the projection numbers <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.