Laserfiche WebLink
COUNCIL MINUTES AUGUST 27, 2001 <br />Consider Resolution No. 01-124, Ordering Feasibility Study for 1211h Avenue/ Holly Drive <br />Reconstruction (4/5 Vote Required), John Powell — City Engineer Powell advised on August 13, <br />2001, the City Council considered the West Shadow Ponds subdivision. Based on City staff's review <br />of the draft minutes from the meeting, a condition of the preliminary plat approval was initiation of a <br />feasibility study for the reconstruction of 12th Avenue and Holly Drive. <br />The study will consider sanitary sewer, watermain and storm sewer issues; wetland impacts; road <br />section and other matters related to reconstructing the streets. A study of this road from County Road <br />J (Ash Street) to CSAH 10 (Birch Street) was also prepared in 1995. As much information and data <br />as is possible will be utilized from the previous study. <br />Council Member Reinert stated the project may not be done for three (3) years. He asked how long <br />the study will be viable. City Engineer Powell stated one question that must be answered is how long <br />before the project can be done. Costs are needed to determine that. The technical information will be <br />good for three (3) years unless there are substantial changes. <br />Council Member Carlson clarified that there is money for Elm Str <br />62nd Street. City Engineer Powell advised the City can borrow <br />allocation. The City may have to bond for 12th Avenue an <br />bond ahead for Apollo. <br />an borrow ahead for <br />so bond for future <br />ed he believes the City did <br />Council Member Carlson asked if that is a norma +roc re. City Engineer Powell stated bonding <br />ahead is very common. <br />Council Member Carlson stated s <br />costs to the City that will cau <br />Director for financial reco <br />d needs to be improved but if there are additional <br />ngineer Powell advised he does rely on the Finance <br />d information. <br />Mayor Bergeson state +' +ue ":n of bonding is not necessarily a cash flow issue. Bonding is a <br />policy issue relating to <br />out the City wants to use their allocation. <br />Council Member Reinert moved to adopt Resolution No. 01-124, as presented. Council Member <br />O'Donnell seconded the motion. <br />Council Member Reinert voted yea. Council Member Dahl voted yea. Mayor Bergeson voted yea. <br />Council Member Carlson voted yea. Council Member O'Donnell voted yea. <br />Motion carried unanimously. <br />Resolution No. 01— 124 can be found in the City Clerk's office. <br />Consider Resolution No. 01-125, Receive Bids and Award Construction Contract, 2001 <br />Bituminous Wearing Course (3/5 Vote Required), John Powell — City Engineer Powell advised <br />sealed bids were received and publicly opened at 10:00 a.m. on August 20, 2001. City Council action <br />is required to award a construction contract to the lowest responsible bidder. <br />21 <br />