My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/27/2001 Council Minutes
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
2001
>
08/27/2001 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2015 12:29:05 PM
Creation date
2/4/2015 3:39:37 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
08/27/2001
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES AUGUST 27, 2001 <br />The low bid from North Valley, Inc., is approximately 11% below the Engineer's Estimate for this <br />project. Staff referred to a copy of the complete bid tabulation. <br />The funding for this work is provided by assessments to the respective subdivisions included in the <br />project. <br />Council Member O'Donnell moved to adopt Resolution No. 01-125, as presented. Council Member <br />Dahl seconded the motion. Motion carried unanimously. <br />Resolution No. 01— 125 can be found in the City Clerk's office. <br />Consider Resolution No. 01-126, Receive Bids and Award Construction Contract, 2001 <br />Surface Water Management (3/5 Vote Required), John Powell — City Engineer Powell advised <br />sealed bids were received and publicly opened at 10:00 a.m. on August 21, 2001. City Council action <br />is required to award a construction contract to the lowest responsible bidde <br />Only one bid was received for this project and is approximately 79 o gineer's Estimate. <br />Staff referred to a copy of the bid tabulation. <br />Staff contacted the contractors who received plans but d + '° ub ":ids. The reasons given for not <br />submitting bids include: their estimators were on ""_ + , t were too busy, and the project <br />contained too much ditch cleaning and not enou: • ipe ° tallation for their crews. <br />If the project is re -bid next year, the Cit <br />construction will also be increase <br />sites will likely be wetter nex <br />a. +Atonal bidders but the overall cost of <br />The net result may not be a lower bid. Also, the <br />will be this fall. <br />The funding for this rk is • ided sy the Surface Water Management Fund. This fund was <br />established in 1992 as a - nu- ° ource in order to meet the "administrative, planning, ponding, <br />mitigation, and water q . i Beds" of the City. It is reimbursed through assessments to new <br />subdivisions and is also •llected as property owners connect to City utilities. <br />The completion date for this project is October 31, 2001. <br />City Engineer Powell added the Boeckman's are having difficulty with the relocation of their well. <br />He referred to a map of the property and stated they are working with staff on this issue. Staff has <br />been reviewing the options. He added that this project will not solve water problems in basements. <br />The City Attorney has received a letter from Mr. Holte's attorney requesting that the City not award <br />the contract for this project. However, the City does not need access to his property for the project. <br />The City Attorney advised the City does have the authority to work within the easement. <br />Council Member Dahl asked if the pond is eliminated, will the pumped water create another pond. <br />City Engineer Powell advised the project proposed will eliminate all water in the pond. The ditches <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.