My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-02-2015 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2015 Park Board Packets
>
03-02-2015 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:57:33 AM
Creation date
3/4/2015 3:04:06 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
03/02/2015
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introductions <br />Lino Lakes City Planner, Ms. Katie Larsen introduced Mr. Rick Packer. Rick Packer is <br />the Land Development Manager for Mattamy Homes Minnesota Division and is <br />attending the meeting to represent the Watermark Development Concept Plan. <br />Public Services Director, Mr. Rick DeGardner stated that Watermark Development is <br />proposing a 372 acre master planned community located between 20th Ave and Highway <br />35E just north of County Road 14. The neighborhood is proposed to consist of 876 units <br />consisting of detached single family homes and attached row townhomes. The <br />Comprehensive Plan contemplates a 5 acre neighborhood park integrated into an open <br />space system that contains trails and sidewalks that traverse throughout the <br />neighborhood. <br />Mr. Packer stated that the park location will be a focal point for the community upon <br />4 <br />entering the development. The park location is designed for aesthetic appeal for people <br />to see as you enter the development and to set off the tone of the neighborhood. Mr. <br />Packer believes that this will make a positive impression and they currently plan on <br />building the park with first phase of development. <br />Description of the Development Site and Design <br />Mr. Packer noted that'the development will have substantial ponds, it has heavy clay <br />soils; and ponds will be approx. 20' to;25' feet deep. The developer is exploring the <br />potential of building,a small recreational building referred to as a "community center" but <br />that is, still uncertain and something the city may want to consider and also more market <br />analysis will need to be done, Developer notes that current market analysis shows <br />homeowners want main hying areas to face out to backyards and open space areas and <br />that is the designthey will ;be following for this development. Included in plan is a small <br />pocket of townhouses in,the SE corner. They are still developing single family detached <br />living options with 42' to 75' wide lots. Largest lots are 75 ft. wide. Approx. 40% of the <br />site is planned to be left as ponds and open spaces at this time. <br />Connection to Sidewalks and Trail Systems <br />The Park Board then discussed the sidewalks and the trail connections in the Concept <br />Plan and discussed the options for how those sidewalks and trails would connect to the <br />park. <br />Park Board Minutes <br />October 6th, 2014 <br />Page 1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.