My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-02-2015 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2015 Park Board Packets
>
03-02-2015 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:57:33 AM
Creation date
3/4/2015 3:04:06 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
03/02/2015
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Larsen talked about a possible future plan to extend trails around the development <br />site. Mr. Packer noted that if the City approves this development then more discussion <br />with Anoka County would need to be done to determine the future plan for additional <br />sidewalks and trail system throughout the entire development. However, this would first <br />rely on the city's approval and then they will extend to the County for more discussion. <br />Conversation continued on easements, water levels and elevations, lot sizes and <br />preliminary designs for sidewalks and trails throughout the development. Trail <br />connections were discussed in regards to the ease of accessibility, the design of the trail <br />connections to the sidewalk systems, and the access of sidewalks to the park. <br />Discussion on 20th Ave <br />The Park Board questioned the future plans to increase the width of 20th Ave. It was <br />conferred that it is unknown at this time what the time frame would be for 20th to be <br />redone. Mr. DeGardner noted that the process in the past has been that the trigger for the <br />City to expand the trail system along County roads is commonly done when roads are <br />reconstructed or widened. Ms. Larsen showed the Park Board members the <br />comprehensive plan for 20th that is currently proposed. Ms. Larsen noted that in <br />comparison with this project, similar conversations were held for the NorthPointe <br />Development,project withthe County. <br />Mr. Packer stated that ideally it makes more sense to them that they would have their <br />park dedication funds remain in their development and be put to use in their <br />neighborhoodpark. <br />How Sidewalks will<be Maintained <br />Board member Mr. Huelman asked about how the sidewalks will be handled in regards to <br />maintenance. Mr. DeGardner replied that the city is currently responsible for sidewalks. <br />Closing Discussions <br />Mr. Packer talked briefly about preliminary berms and designs for visual landscaping in <br />the development. He said that at this time he would like to work with the City and the <br />Park Board on designs for the park. Mr. Packer repeated that he would like to construct <br />the park in the first phase of development with their park dedication fees. <br />Park Board Minutes <br />October 6th, 2014 <br />Page 1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.