Laserfiche WebLink
CITY COUNCIL WORK SESSION March 2, 2015 <br />DRAFT <br />1 2. Fire Station Financing — Mikeala Huot, Springsted financial consultant, <br />2 reviewed a PowerPoint presentation regarding financing for the new city fire station. She <br />3 included information on: <br />4 - the project to be funded; <br />5 - types of funding proposed (lease revenue and abatement bonds); <br />6 - the amount of financing required; <br />7 - how abatement bonding is structured and costs eligible for abatement bonds; <br />8 - constraints of abatement bonding; <br />9 - area where taxes will be abated (ultimately costs are spread throughout the city); <br />10 - the schedule for issuance of bonds; <br />11 - other projects that have been funded by abatement bonds. <br />12 <br />13 The council will conduct a public hearing on the bonds at the March 23, 2015 meeting. <br />14 <br />15 2a. Lino Lakes Ambassador Program- Ray Culp, representing the Ambassador <br />16 Program, provided information on the city float. The float is used by the Ambassadors to <br />17 represent the city in parades and functions around the state. It is in need of updating and <br />18 repair. <br />19 <br />20 Megan Culp, Co -Coordinator of the Ambassador Program and former ambassador. The <br />21 program was so helpful in her growth as an individual that she is still participating and <br />22 contributing to keep it going. Ambassadors are selected based on criteria that means they <br />23 will represent the city well. <br />24 <br />25 Mayor Reinert noted that he and Council Member Roeser attended a function of the <br />26 Program recently and heard about the condition of the float. The Program is long <br />27 recognized for the good work and the benefit it provides to the participants who are city <br />28 residents. <br />29 <br />30 Using a PowerPoint tool, Mr. Culp reviewed: <br />31 - Ambassador activities; <br />32 - Positive attitude of the participants; <br />33 - Photos of the current float; <br />34 - Problems occurring with the current float; <br />35 - A proposal to repair the float, noting that they've gotten some quotes on the supplies; <br />36 - The need for a cover to store and transport the float (possibly $3,300); <br />37 - Breakdown of expenses in the range of $3,000, not including the cover (including just <br />38 materials as labor would be done by volunteers). <br />39 <br />40 The mayor noted his support of the city providing funds for the project. Council Member <br />41 Roeser indicated that the volunteer element is great and he thinks the city should provide <br />42 funding for the materials. It was suggested that inside storage should be explored as well <br />43 as providing for regular maintenance going forward. Also the possibility of funding <br />44 through the tourism organization could be explored. Council Member Rafferty asked <br />45 that the float renovation include more city identification such as the city logo. <br />2 <br />