Laserfiche WebLink
■ <br />WSB <br />& Assocengineering • planning • environmental • construction <br />Memorandum <br />To: Diane Hankee, PE - City of'Lino Lakes <br />From: Jake Newhall, PE <br />Tony Miller, EIT <br />Date: April 3, 2015 <br />Re: Turnberry Crossing 2"d Addition Plan Review <br />WSB Project No. 2029-990 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />The documents provided by Plowe Engineering on 03/04/15 for the Turnberry Crossing 2°d <br />Addition Plan, have been reviewed. Documents Reviewed include: <br />• TURNBERRY CROSSING 2ND ADDITION SHT 1 (3-4-15).pdf (1 page) <br />• TURNBERRY CROSSING 2ND ADDITION SHT 2 (3-4-15).pdf (1 page) <br />• TURNBERRY CROSSING 2ND ADDITION SHT 4 (3-4-15).pdf (1 page) <br />• Turnberry Crossing 2nd Addition Utility & Stormwater Plans 11x17.pdf (4 pages) <br />• TURNBERRY CROSSING 2ND ADD -SOILS MAP.pdf (3 pages) <br />• Turnberry Crossing 2nd Addition Site Drainage Narrative.pdf (21 pages) <br />Based on the review of the plan the following comments are provided for your consideration. <br />General Comments <br />1. Please indicate drain tile for the South bio filtration basin on the plan. <br />2. Please provide soil borings for the project area. <br />3. Please provide a maintenance plan to insure that the pervious pavers will continue to <br />function as designed. A Declaration for Maintenance of Storm Water Facilities "Private" <br />is to be executed with the Final Plat. <br />Stormwater Management Plan <br />4. All bio filtration basins need drainage easements and they shall extend a minimum of 10 <br />feet beyond the basin's 100-yr storm HWL. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />SACommunity D—lopmentTrojectsTlanning CasesU mbeny Crossing 2nd Addition\StaffRepws\20150408 P&Z PUD PP Ammd\5 City Engineer Letter.docx <br />