My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/2015 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2015
>
04/08/2015 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:19:23 PM
Creation date
4/3/2015 11:38:30 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/08/2015
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Water Quality <br />5. 1.1 inches of runoff needs to be used in the infiltration calculations for the current RCWD <br />rules in the Turnberry Crossing 2nd Addition Site Drainage Narrative.pdf. <br />6. Please update the "Filtration Volume provided" section of the Site Drainage Narrative to <br />reflect the HydroCAD model for both the basin names and volume filtered. <br />Erosion Control <br />7. Inlet protection locations should be labeled on the Grading Plan. <br />Ememency Overflow (EOF) <br />8. All bio filtration basins need to have an EOF labeled on the Grading Plan with arrows <br />indicating direction of flow. <br />9. All catch basins located at low points, both on and off the street, need to have EOFs <br />labeled on the Grading Plan with arrows indicating direction of flow. <br />Freeboard <br />10. One foot of freeboard is needed between all EOFs and the adjacent buildings low <br />openings. <br />SACommunity Developrawt\ProjeasTlanning Cases\7Wmberry Crossing 2nd Addition\Staff Reports\20150408 P&Z POD PP Arnwd\5 City Engineer Letterdo <br />
The URL can be used to link to this page
Your browser does not support the video tag.