My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2015 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2015
>
06/10/2015 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:24:32 PM
Creation date
6/8/2015 9:46:59 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2015
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAA <br />WSB <br />� Assoc- engineering • planning • environmental • construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />Memorandum <br />To: Katie Larson - City of Lino Lakes <br />From: Diane Hankee, PE <br />Date: June 3, 2015 <br />Re: Turnberry Crossing 2„ d Addition Plan Review, 05-13-15 Submittal <br />WSB Project No. 2029-990 <br />The documents provided by Plowe Engineering on 05/13/15 for the Turnberry Crossing 2nd <br />Addition Plan, have been reviewed. Documents Reviewed include: <br />• 1536 DRAINAGE NARRATIVE.Rev May 13 2015.pdf (1 page) <br />• 2015-05-13_15-1536 PLANSET.pdf (4 pages) <br />• 20150513 TURNBERRY 2ND ADDITION GRADING PLAN SHEET 4 (REV 5-13- <br />2015).pdf (1 page) <br />• 20150513 TURNBERRY 2ND ADDITION IMPERVIOUS COVERAGE EXHIBIT <br />SHEET 2 (REV 5-13-2015).pdf (1 page) <br />• 20150513 TURNBERRY 2ND ADDITION PRELIMINARY PLAT SHEET 3 (REV5- <br />13-2015).pdf (1 page) <br />• 20150513 Utility Plan Turnberry Crossing 2nd Addition.pdf (1 page) <br />Based on the review of the plan the following comments are provided for your consideration. <br />1. The grading plan contours are from the original plat and need to lighter line weight to <br />represent the work being completed with this plat. Currently the plan shows grading <br />work within existing ponds that are not going to be disturbed. The NWL and HWL <br />should be labeled on the stormwater plan. The Utility plan should show the exiting <br />utilities in a lighter line weight to represent the work being completed with this plat. <br />2. A 5-foot wide drainage and utility easement is to be added between pads 1 & 2, and 2 & <br />3. <br />3. A construction access and phasing plan was submitted and is on file. The developer shall <br />restore the site once five of the units are constructed. Including the access road, stock <br />piles, temporary storage area, and any other disturbed area. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />SAComtnunity DevelopmentTr jeas\Planning Cases\Tumbeny Crossing 2nd AdditionEngineering\02029-990_ MEMO _ TumberryCrossing2ndAdditimPlanReview_051315Submittal_052115_.dor s <br />
The URL can be used to link to this page
Your browser does not support the video tag.