My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2015 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2015
>
06/10/2015 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:24:32 PM
Creation date
6/8/2015 9:46:59 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2015
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Douglas W. Fischer, PE <br />County Engineer <br />Anoka County <br />TRANSPORTATION DIVISION <br />Highway <br />May 7, 2015 <br />Nicole DeDeyn <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014-1182 <br />Re: REVISED Preliminary Plat - Turnberry Crossing 2nd Addition <br />Dear Nicole, <br />We have been advised by Lino Lakes staff that the completed development of <br />Turnberry Crossing 2nd Addition has 10 twin homes and 3 single family detached <br />units for a total of 23 units. Since this is less than the 31 or more total unit <br />threshold for requiring the construction of CSAH 23 left turn lanes, the CSAH 23 <br />left turn lane construction will not be required to be completed in conjunction with <br />this development. However, it should be noted that ACHD does not have any <br />programmed reconstruction for this section of CSAH 23 in our current 10 year <br />program, so should the City have concerns about left turn maneuvers at this <br />intersection, we would be supportive of the left turn lane construction occurring <br />in conjunction with this development. <br />Thank you for the opportunity to provide these additional comments. Feel free to <br />contact me if you have any questions regarding this review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: File - CSAH 23/Plats + Developments/2015 <br />Larry Hoium, County Surveyor <br />Randy Bettinger, Traffic Engineering Coordinator <br />Josie Scott, Traffic Engineering Technician <br />Jorge Bernal, Traffic Engineering Technician I <br />Gina Pizzo, Engineer III <br />Our passion is your safe Way home! <br />1440 Bunker Lake Blvd. NW ® Andover, MN 55304-4005 <br />Office:763-862-4200 ® Fax:763-862-4201 ® www.anokacounty.us/highway <br />Affirmative Action / Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.