Laserfiche WebLink
Project: 02029-11 - LINO - 21st Avenue Extension <br />Engineers Estimate <br />T. A. Schifsky & Sons, <br />Inc. <br />Ryan Contracting Co. <br />Park Construction <br />Company - Mpls <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Sanitary <br />Sewer Improvements <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$5,100.00 <br />$5,100.00 <br />$4,000.00 <br />$4,000.00 <br />$5,000.00 <br />$5,000.00 <br />$11,000.00 <br />$11,000.00 <br />2 <br />2451.609 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />TON <br />10 <br />$12.00 <br />$120.00 <br />$30.45 <br />$304.50 <br />$50.00 <br />$500.00 <br />$131.00 <br />$1,310.00 <br />3 <br />2503.602 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />1 <br />$2,000.00 <br />$2,000.00 <br />$10,290.00 <br />$10,290.00 <br />$10,000.00 <br />$10,000.00 <br />$2,100.00 <br />$2,100.00 <br />4 <br />2503.603 <br />CONSTRUCT 8" OUTSIDE DROP <br />LIN FT <br />45 <br />$32.00 <br />$1,440.00 <br />$161.70 <br />$7,276.50 <br />$150.00 <br />$6,750.00 <br />$407.00 <br />$18,315.00 <br />5 <br />2503.603 <br />18" PVC PIPE SEWER - SDR 26 <br />LIN FT <br />1260 <br />$65.00 <br />$81,900.00 <br />$96.90 <br />$122,094.00 <br />$160.00 <br />$201,600.00 <br />$163.00 <br />$205,380.00 <br />6 <br />2503.603 <br />TELEVISE SANITARY SEWER <br />LIN FT <br />1460 <br />$2.75 <br />$4,015.00 <br />$2.31 <br />$3,372.60 <br />$2.00 <br />$2,920.00 <br />$1.90 <br />$2,774.00 <br />7 <br />2503.603 <br />8" PVC PIPE SEWER - SDR 35 <br />LIN FT <br />235 <br />$32.00 <br />$7,520.00 <br />$27.30 <br />$6,415.50 <br />$60.00 <br />$14,100.00 <br />$38.30 <br />$9,000.50 <br />8 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />4 <br />$750.00 <br />$3,000.00 <br />$792.75 <br />$3,171.00 <br />$500.00 <br />$2,000.00 <br />$639.00 <br />$2,556.00 <br />9 <br />2506.603 <br />CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE <br />LIN FT <br />125 <br />$250.00 <br />$31,250.00 <br />$153.30 <br />$19,162.50 <br />$145.00 <br />$18,125.00 <br />$162.00 <br />$20,250.00 <br />$272,685.50 <br />Total Sanitary Sewer Improvements: <br />$136,345.00 <br />$176,086.60 <br />$260,995.00 <br />Storm Sewer <br />Improvements <br />10 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$4,300.00 <br />$4,300.00 <br />$4,000.00 <br />$4,000.00 <br />$1,000.00 <br />$1,000.00 <br />$3,500.00 <br />$3,500.00 <br />11 <br />2451.609 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />TON <br />10 <br />$12.00 <br />$120.00 <br />$20.00 <br />$200.00 <br />$10.00 <br />$100.00 <br />$26.30 <br />$263.00 <br />12 <br />2501.515 <br />15" RC PIPE APRON WITH TRASH GUARD <br />EACH <br />5 <br />$1,500.00 <br />$7,500.00 <br />$1,134.00 <br />$5,670.00 <br />$800.00 <br />$4,000.00 <br />$816.00 <br />$4,080.00 <br />13 <br />2501.515 <br />18" RC PIPE APRON WITH TRASH GUARD <br />EACH <br />3 <br />$2,000.00 <br />$6,000.00 <br />$1,197.00 <br />$3,591.00 <br />$950.00 <br />$2,850.00 <br />$872.00 <br />$2,616.00 <br />14 <br />2501.602 <br />SKIMMER <br />EACH <br />3 <br />$3,500.00 <br />$10,500.00 <br />$3,622.50 <br />$10,867.50 <br />$3,500.00 <br />$10,500.00 <br />$2,600.00 <br />$7,800.00 <br />15 <br />2502.541 <br />4" PERF PE PIPE DRAIN <br />LIN FT <br />600 <br />$10.00 <br />$6,000.00 <br />$8.40 <br />$5,040.00 <br />$6.00 <br />$3,600.00 <br />$4.30 <br />$2,580.00 <br />16 <br />2503.541 <br />12" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />80 <br />$30.00 <br />$2,400.00 <br />$24.15 <br />$1,932.00 <br />$36.00 <br />$2,880.00 <br />$24.50 <br />$1,960.00 <br />17 <br />2503.541 <br />15" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />550 <br />$32.00 <br />$17,600.00 <br />$25.20 <br />$13,860.00 <br />$37.00 <br />$20,350.00 <br />$26.20 <br />$14,410.00 <br />18 <br />2503.541 <br />18" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />450 <br />$35.00 <br />$15,750.00 <br />$28.35 <br />$12,757.50 <br />$39.00 <br />$17,550.00 <br />$28.50 <br />$12,825.00 <br />19 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />1 <br />$2,000.00 <br />$2,000.00 <br />$1,312.50 <br />$1,312.50 <br />$500.00 <br />$500.00 <br />$1,050.00 <br />$1,050.00 <br />20 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />LIN FT <br />32 <br />$350.00 <br />$11,200.00 <br />$378.00 <br />$12,096.00 <br />$150.00 <br />$4,800.00 <br />$274.00 <br />$8,768.00 <br />21 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3') <br />EACH <br />4 <br />$1,500.00 <br />$6,000.00 <br />$1,611.75 <br />$6,447.00 <br />$1,500.00 <br />$6,000.00 <br />$867.00 <br />$3,468.00 <br />22 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />7 <br />$750.00 <br />$5,250.00 <br />$640.50 <br />$4,483.50 <br />$600.00 <br />$4,200.00 <br />$805.00 <br />$5,635.00 <br />23 <br />2511.501 <br />RANDOM RIPRAP CLASS III - GROUTED <br />CU YD <br />30 <br />$150.00 <br />$4,500.00 <br />$106.05 <br />$3,181.50 <br />$67.00 <br />$2,010.00 <br />$118.00 <br />$3,540.00 <br />24 <br />2511.515 <br />GEOTEXTILE FABRIC TYPE III <br />SQ YD <br />80 <br />$5.00 <br />$400.00 <br />$3.15 <br />$252.00 <br />$3.00 <br />$240.00 <br />$3.20 <br />$256.00 <br />Total Storm Sewer Improvements: <br />$99,520.00 <br />$85,690.50 <br />$80,580.00 <br />$72,751.00 <br />Surface Improvements <br />25 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$25,800.00 <br />$25,800.00 <br />$26,000.00 <br />$26,000.00 <br />$7,000.00 <br />$7,000.00 <br />$23,000.00 <br />$23,000.00 <br />26 <br />2101.501 <br />CLEARING <br />ACRE <br />1.41 <br />$3,500.00 <br />$4,935.00 <br />$3,500.00 <br />$4,935.00 <br />$3,200.00 <br />$4,512.00 <br />$2,650.00 <br />$3,736.50 <br />27 <br />2101.506 <br />GRUBBING <br />ACRE <br />1.41 <br />$3,000.00 <br />$4,230.00 <br />$3,500.00 <br />$4,935.00 <br />$3,200.00 <br />$4,512.00 <br />$2,650.00 <br />$3,736.50 <br />28 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LIN FT <br />240 <br />$5.00 <br />$1,200.00 <br />$4.00 <br />$960.00 <br />$3.00 <br />$720.00 <br />$2.50 <br />$600.00 <br />29 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />850 <br />$5.00 <br />$4,250.00 <br />$3.00 <br />$2,550.00 <br />$2.00 <br />$1,700.00 <br />$2.45 <br />$2,082.50 <br />30 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />170 <br />$5.00 <br />$850.00 <br />$2.50 <br />$425.00 <br />$5.00 <br />$850.00 <br />$5.10 <br />$867.00 <br />