My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-052 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-052 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:21:22 AM
Creation date
7/14/2015 3:01:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/27/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick DeGardner <br />June 2, 2014 <br />Page 2 <br />Design and construction of Well House 6 <br />Task 1 — Well House Preliminary Design <br />• Provide site surveying and base map preparation. <br />• Discuss site constraints with Minnesota Department of Health personnel. <br />• Prepare a preliminary site and building layout and discuss with City personnel. <br />Task 2 — Well House Final Design <br />• Prepare final construction drawings and specifications based upon preliminary design <br />discussions with the City. <br />• Review final construction drawings and specifications with City personnel. <br />• Provide an opinion of probable construction cost to reflect specified equipment, structural <br />components, and any modifications made during final design. <br />• Review opinion of probable construction cost with City personnel. <br />• Submit two (2) copies of the final construction drawings and specifications to the <br />Minnesota Department of Health (MDH) for review. Respond to questions and <br />comments from the MDH and receive approval for the drawings and specifications. <br />• Prepare and provide technical criteria, written descriptions, design data, final opinion of <br />probable construction cost, and forms for the City's use in filing applications for <br />governmental design approvals. <br />• Assist City in consultations with governmental agencies, if needed. <br />Task 3 — Well House Bidding <br />• Print construction drawings and specifications (Bidding Documents). <br />• Distribute Bidding Documents to prospective bidders. <br />• Maintain bidders list. <br />• Respond to bidder questions. <br />• Issue addenda to Bidding Documents, if required. <br />• Attend bid opening and prepare bid tabulation sheets. <br />• Evaluate bids. <br />• Assess proposed substitute materials and equipment. <br />• Recommend award of construction contract. <br />Task 4 — Well House Construction <br />• Organize, coordinate, lead, and attend preconstruction conference and regular progress <br />meetings during construction. Provide and distribute meeting minutes. <br />• Establish reference points for construction staking of the project by Contractor (one <br />time). <br />• Review Contractor submittals (shop drawings) for products and equipment. <br />• Issue contract document clarifications as required. <br />• Process contract change order requests. <br />/, 0IW'aterWastewaterlLino LakeslWell 61LTR PROP-LL-0602/4-Well6.Aac <br />
The URL can be used to link to this page
Your browser does not support the video tag.