My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-052 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-052 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:21:22 AM
Creation date
7/14/2015 3:01:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/27/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick DeGardner <br />June 2, 2014 <br />Page 3 <br />• Review contractor -submitted construction progress schedules. <br />• Process contractor pay requests. <br />• Provide substantial completion punch list for contractor and issue certificate of <br />substantial completion when appropriate for the well house construction. <br />• Assist the City with start-up of the well house. <br />• Review final submittal from Contractor with respect to conformance with the contract <br />documents. <br />• Process final pay request and project close-outs. <br />Task 5 — Well House Post Construction <br />• Provide record drawings. <br />• Provide an operation and maintenance manual for the facility. <br />• Visit the project to observe any apparent defects in the completed work and assist the <br />City in working with the Contractor to correct defects. <br />THE CITY'S TASKS <br />In order to complete our tasks, we will need The City to provide the following: <br />• Provide a designated project contact person. <br />• Provide answers to specific project questions, provide requested information, and make <br />decisions regarding project direction during the course of the project. <br />• Choose a well house configuration and site plan early in the project. <br />• Pay permitting and review fees that may be necessary. <br />• Pay for necessary testing services as defined in the contract documents. <br />• Pay additional testing costs that may be necessary. <br />• Attend construction progress meetings when requested. <br />PROPOSAL ASSUMPTIONS <br />WSB tasks and estimated fees are based on the following assumptions: <br />• This proposal assumes design of the well house will be similar to the recently toured <br />Hugo Well House No. 6. <br />• This proposal includes a generator receptacle to connect a portable generator and <br />conduits to be stubbed out from the well house for a potential future standby generator. It <br />does not include the design of a portable generator. <br />• This proposal includes design of radiant in floor heat for the well house. <br />• This proposal does not include preparation of a wellhead protection plan or update. <br />• This proposal does not include amending the City's water appropriation permit. <br />• An operation and maintenance manual, beyond the information contained in contractor - <br />supplied shop drawings, is not included in the project. <br />.il: 6V'aterWastewaler Lino LakeslWell 6ILTR PROP-LL-060114-Wel16.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.