My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-052 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-052 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:21:22 AM
Creation date
7/14/2015 3:01:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
05/27/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick DeGardner <br />June 2, 2014 <br />Page 4 <br />• The architectural finishes of the well house are to be determined during the preliminary <br />design phase of the project. <br />• The well house will be connected to the existing SCADA systems. <br />• Potential bidders will be charged a fee for each copy of the Bidding Documents. WSB <br />will retain this fee. <br />WSB SUB -CONSULTANTS <br />WSB subconsultants and their area of responsibility are indicated below: <br />• Barr Engineering Company — Former Kaeding and Associates Personnel <br />(electrical/instrumentation and control) <br />• Wentz Associates, Inc. (plumbing and HVAC) <br />• Oertel Architects (architectural) <br />Our scope includes the management of the subconsultants and their efforts. Subconsultant <br />billings pass through WSB without mark-up. <br />FEE <br />WSB & Associates, Inc. will provide the scope of services for as proposed herein on an hourly <br />basis with a not -to -exceed fee of $155,250. A breakdown according to phase and tasks follows <br />directly below: <br />Design and Construction of Well House 6 <br />Task <br />No. <br />Task Description — Phase 2 - <br />Well House/Pump No. 6 <br />WSB <br />Barr <br />Wentz <br />Oertel <br />Estimated <br />Fee <br />2A <br />Well House Preliminary Design <br />$5,000 <br />$1,000 <br />$1,000 <br />$2,000 <br />$9,000 <br />2B <br />Well House Final Design Phase <br />$43,500 <br />$11,150 <br />$4,000 <br />$12,500 <br />$71,150 <br />2C <br />Well House Bidding <br />$6,500 <br />$1,800 <br />$1,000 <br />$1,000 <br />$10,300 <br />2D <br />Well House Construction <br />$48,000 <br />$5,300 <br />$4,000 <br />$2,000 <br />$59,300 <br />2E <br />Well House Post Construction <br />$5,500 <br />$5,500 <br />Total Phase 2 <br />S108,500 <br />$19,250 <br />$10,000 <br />S17,500 <br />$155,250 <br />WSB's fee includes civil, water and structural design/overall project <br />management/survey/construction administration/permitting. <br />M• iWaierWartewaierTiao LakeslWell 6ILTR PROP-LL-060114-Wetl6.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.