My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-074 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-074 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:18:36 AM
Creation date
7/15/2015 8:49:09 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
07/14/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract — Site Grading Only <br />Saddle Club <br />July 14, 2014 <br />Coordinator, and any other governing agency with jurisdiction as <br />required. <br />b) The Developer shall remove, dispose of, or treat all dead and <br />diseased trees in accordance with the City Forester's <br />recommendation before building permits will be issued. <br />4. Grading and Erosion Control Construction & Maintenance <br />a) Prior to the commencement of site grading and erosion control, the <br />Developer shall complete items II.A.1. II.A.2, and II.A.3 as listed <br />above, and schedule a preconstruction meeting with the contractor. <br />developer and city. <br />b) The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved Grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />c) Erosion control shall conform to the natural limitations presented by <br />the topography and soil of the subdivision in order to create the best <br />potential for preventing soil erosion. <br />d) Erosion and siltation control measures shall be coordinated with the <br />different stages of development as applicable. Appropriate control <br />measures as required by the City shall be installed prior to <br />development when necessary to control erosion. <br />e) Land shall be graded in increments of workable size such that <br />adequate erosion and siltation controls can be provided as <br />construction progresses. The smallest practical area of land shall be <br />exposed at any one period of time. <br />f) When the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area. The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. <br />g} The conservation areas and wetland buffer areas shall be protected as <br />detailed in the approved plans. <br />h) The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. <br />i) Topsoil removed from wetland buffer areas shall be stock piled in an <br />approved location, protected from contamination with other soils, re - <br />page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.