My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2014-074 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2014
>
2014-074 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 10:18:36 AM
Creation date
7/15/2015 8:49:09 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
07/14/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Contract — Site Grading Only <br />Saddle Club <br />July 14, 2014 <br />j) <br />spread within the buffer area to maintain a natural seed environment <br />and restored as directed by the city. <br />Drainage swales, ditches. storm water storage ponds and other high <br />risk erosion areas shall be protected from erosion. <br />k) Protect streets from erosion deposits. This should include a <br />combination of roadside silt fences, roadside sod strips. catch basin <br />rock bale inlet protection. rock construction entrances, straw mulch. <br />and/or street sweeping. <br />I) The developer's engineer shall certify, in writing with an as -built <br />survey, that all grading complies with the grading plan. <br />The developer shall be responsible for ascertaining that site <br />geotechnical and groundwater conditions are adequate and <br />conforming with the grading and site improvements as proposed. <br />5. The Developer shall promptly clear dirt and debris, within public right-of- <br />ways, and drainage and utility easements, resulting from construction by <br />the Developer, and its contractors within five (5) days after notification by <br />the City. The Developer or its assigns shall be responsible for all <br />necessary street and storm sewer maintenance including street sweeping. <br />storm sewer cleaning, ditch cleaning and pond dredging, resulting from the <br />accumulation of said dirt and debris. Traffic control per the City <br />Engineer's approval shall be installed to mitigate hauling operations. <br />6. Other Construction <br />a) In the event that damage to the streets or other City infrastructure <br />result from said improvement work, the Developer shall be <br />responsible for effecting said repairs. or the City shall withhold <br />escrows or deposits as the City deems appropriate and necessary. <br />The Developer shall provide a financial security or cash escrow to <br />assure completion of the grading and restoration, in the event that the <br />work is not completed by the Developer. <br />c) No burning of vegetation cleared during construction shall be <br />allowed. <br />7. Cost of Developer's Improvements, description and completion dates are as <br />shown on Attachment A. <br />page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.