Laserfiche WebLink
Project Material Status <br />Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />Project 1 - Birch Street (CSAH 34) Ware Road <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$30,000.00 <br />1 <br />1 <br />0 <br />$30,000.00 <br />2 <br />2101.501 <br />CLEARING <br />ACRE <br />$5,553.00 <br />0.35 <br />0.35 <br />0 <br />$1,943.55 <br />3 <br />2101.502 <br />CLEARING <br />TREE <br />$307.00 <br />1 <br />7 <br />0 <br />$2,149.00 <br />4 <br />2101.506 <br />GRUBBING <br />ACRE <br />$2,276.00 <br />0.35 <br />0.35 <br />0 <br />$796.60 <br />5 <br />2101.507 <br />GRUBBING <br />TREE <br />$102.00 <br />1 <br />7 <br />0 <br />$714.00 <br />6 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LIN FT <br />$3.20 <br />280 <br />210 <br />0 <br />$672.00 <br />7 <br />2104.501 <br />REMOVE BITUMINOUS CURB <br />LIN FT <br />$1.10 <br />75 <br />75 <br />0 <br />$82.50 <br />8 <br />2104.503 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SQ FT <br />$0.50 <br />2433 <br />1893 <br />0 <br />$946.50 <br />9 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$3.20 <br />2142 <br />2650 <br />0 <br />$8,480.00 <br />10 <br />2104.505 <br />REMOVE BITUMINOUS TRAIL <br />SQ YD <br />$3.20 <br />838 <br />934.7 <br />0 <br />$2,991.04 <br />11 <br />2104.509 <br />REMOVE SIGN TYPE C <br />EACH <br />$46.00 <br />7 <br />8 <br />0 <br />$368.00 <br />12 <br />2104.513 <br />SAWING BIT PAVEMENT (FULL DEPTH) <br />LIN FT <br />$1.60 <br />5178 <br />2874 <br />0 <br />$4,598.40 <br />13 <br />2104.523 <br />SALVAGE MAIL BOX AND SUPPORT <br />EACH <br />$51.00 <br />7 <br />9 <br />0 <br />$459.00 <br />14 <br />2104.523 <br />SALVAGE & REINSTALL IRRIGATION SYSTEM <br />EACH <br />$320.00 <br />2 <br />0 <br />0 <br />$0.00 <br />15 <br />2104.523 <br />SALVAGE SIGN TYPE C <br />EACH <br />$46.00 <br />3 <br />3 <br />0 <br />$138.00 <br />16 <br />2104.525 <br />ABANDON STRUCTURE <br />EACH <br />$1,637.00 <br />1 <br />1 <br />0 <br />$1,637.00 <br />17 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />$8.60 <br />1390 <br />1390 <br />0 <br />$11,954.00 <br />18 <br />2105.511 <br />COMMON CHANNEL EXCAVATION <br />CU YD <br />$8.60 <br />1121 <br />1121 <br />0 <br />$9,640.60 <br />19 <br />2105.525 <br />TOPSOIL BORROW (LV) MOD <br />CU YD <br />$34.00 <br />115 <br />122 <br />0 <br />$4,148.00 <br />20 <br />2105.525 <br />TOPSOIL BORROW (CV) <br />CU YD <br />$17.60 <br />329 <br />433 <br />0 <br />$7,620.80 <br />21 <br />2105.601 <br />DEWATERING <br />LUMP SUM <br />$960.00 <br />1 <br />0 <br />0 <br />$0.00 <br />22 <br />2211.503 <br />AGGREGATE BASE (CV) CLASS 5 <br />CU YD <br />$21.50 <br />1012 <br />997 <br />0 <br />$21,435.50 <br />23 <br />2221.503 <br />AGGREGATE SHOULDERING (CV) CLASS 2 MOD <br />CU YD <br />$52.70 <br />50 <br />47.4 <br />0 <br />$2,497.98 <br />24 <br />2232.501 <br />MILL BITUMINOUS SURFACE (2.0") <br />SQ YD <br />$0.77 <br />7646 <br />6975 <br />0 <br />$5,370.75 <br />25 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (4,E) <br />TON <br />$63.20 <br />1205 <br />1170.3 <br />0 <br />$73,962.96 <br />26 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) <br />TON <br />$65.00 <br />67 <br />74.52 <br />0 <br />$4,843.80 <br />27 <br />2360.502 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B) <br />TON <br />$58.30 <br />580 <br />771.27 <br />0 <br />$44,965.04 <br />28 <br />2360.502 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,6) <br />TON <br />$60.00 <br />89 <br />128 <br />0 <br />$7,680.00 <br />29 <br />2501.515 <br />24" RC PIPE APRON <br />EACH <br />$1,237.00 <br />1 <br />1 <br />0 <br />$1,237.00 <br />30 <br />2501.602 <br />TRASH GUARD FOR 24" PIPE APRON <br />EACH <br />$389.00 <br />1 <br />1 <br />0 <br />$389.00 <br />31 <br />2502.541 <br />4" PERF PE PIPE DRAIN <br />LIN FT <br />$7.20 <br />100 <br />400 <br />0 <br />$2,880.00 <br />32 <br />2502.602 <br />4" PE PIPE DRAIN CLEANOUT <br />EACH <br />$307.00 <br />1 <br />1 <br />0 <br />$307.00 <br />33 <br />2503.541 <br />15" RC PIPE SEWER DES 3006 CL II <br />LIN FT <br />$29.70 <br />660 <br />686.8 <br />0 <br />$20,397.96 <br />34 <br />2503.541 <br />18" RC PIPE SEWER DES 3005 CL II <br />LIN FT <br />$33.70 <br />414 <br />371.2 <br />0 <br />$12,509.44 <br />35 <br />2503.541 <br />24" RC PIPE SEWER DES 3006 CL II <br />LIN FT <br />$40.90 <br />220 <br />271.1 <br />0 <br />$11,087.99 <br />36 <br />2504.602 <br />ADJUST GATE VALVE <br />EACH <br />$230.00 <br />6 <br />4 <br />0 <br />$920.00 <br />37 <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />$1,739.00 <br />1 <br />1 <br />0 <br />$1,739.00 <br />38 <br />2504.602 <br />HYDRANT <br />EACH <br />$2,925.00 <br />2 <br />2 <br />0 <br />$5,850.00 <br />39 <br />2504.602 <br />6" GATE VALVE <br />EACH <br />$1,115.00 <br />2 <br />2 <br />0 <br />$2,230.00 <br />40 <br />2504.602 <br />1" CORPORATION STOP <br />EACH <br />$153.00 <br />4 <br />4 <br />0 <br />$612.00 <br />41 <br />2504.602 <br />1" CURB STOP & BOX <br />EACH <br />$240.00 <br />4 <br />4 <br />0 <br />$960.00 <br />42 <br />2504,603 <br />1" TYPE K COPPER PIPE <br />LIN FT <br />$21.50 <br />119 <br />117 <br />0 <br />$2,515.50 <br />43 <br />2504.603 <br />6" WATERMAIN DUCTILE IRON CL 52 <br />LIN FT <br />$29.70 <br />13 <br />15 <br />0 <br />$445.50 <br />44 <br />2504.603 <br />8" WATERMAIN DUCTILE IRON CL 52 <br />UN FT <br />$34.80 <br />425 <br />399 <br />0 <br />$13,885.20 <br />45 <br />2504.604 <br />2" POLYSTYRENE INSULATION <br />SQ YD <br />$15.30 <br />50 <br />7.1 <br />0 <br />$108.63 <br />46 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />POUND <br />$5.00 <br />288 <br />281 <br />0 <br />$1,405.00 <br />47 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN H <br />LIN FT <br />$215.00 <br />19.3 <br />19.1 <br />0 <br />$4,106.50 <br />48 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 402 <br />UN FT <br />$266.00 <br />8 <br />7.3 <br />0 <br />$1,941.80 <br />49 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />LIN FT <br />$266.00 <br />21.7 <br />21.7 <br />0 <br />$5,772.20 <br />50 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />LIN FT <br />6532.00 <br />4.87 <br />5 <br />0 <br />$2,660.00 <br />Page 2 <br />